Home / Browse projects / Pune, Maharashtra / SHREE GANESH TOWER - UNIT E
SHREE GANESH TOWER - UNIT E
RG-MH-22573 · RERA P52100032436 · Last updated on MahaRERA portal: 6 Nov 2024
Source: official MahaRERA filing
Red flags
- 1 extension taken
Clear
- No litigation declared
- No complaints on record
- Completion date never moved
- Separate project account declared
- Allotment letter follows the model form
- Recorded completed on MahaRERA
1 condition is on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.
See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
SHREE GANESH TOWER - UNIT E is a Residential / Group Housing project by POLITE DEVELOPERS in Pune, Maharashtra, registered with MahaRERA as P52100032436 on 4 Jan 2022. The registration is recorded completed; possession was promised by 31 Mar 2023.
At a glance
Project
- NameSHREE GANESH TOWER - UNIT E
- TypeResidential / Group Housing
- Location
- BULK LAND NO 18
- BEHIND SAINATH HOSPITAL
- SAINT NAGAR
- SECTOR NO 4
- MOSHI-PCNTDA
- Pimpri Chinchawad (M Corp.)
- Haveli
- Pune
- 412105
- Pincode412105
- MapView location on Google Maps (as filed on RERA)
- RERA no.P52100032436
- ReraGenie IDRG-MH-22573
Builder
- NamePOLITE DEVELOPERS
- Entity typePartnership
- PartnersVINODBHAI DEVSIBHAI PATEL, NARESHKUMAR RAVJIBHAI PATEL, SATISHKUMAR RAVJIBHAI PATEL, PARESH GOVINDBHAI PATEL, PIYUSHKUMAR CHIMANBHAI PATEL, TULSIDAS DEVSI PATEL, ANANDKUMAR DINESHBHAI PATEL, MITESHKUMAR ARVINDBHAI PATEL, VAIBHAV ARJANBHAI PATEL, BHUMI HARESH PATEL
- Other registrations1 more →
- Completed2 of 2
- Declared earlier projects1 →
Key dates
Key facts
Registration and timeline
- StatusCompleted
- Registered on4 Jan 2022
- Promised completion31 Mar 2023
- Revised completionNone
- Buildings1 building record
- Documents filed90 files
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| UNIT - E | NA | 11 | 0 | 0 | 0 | 0 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building1
As on 6 Nov 2024, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
7 of 11 construction stages are filed complete. The stage furthest along is Basement (if any), at 0%.
UNIT - E: 64% average across the applicable activities
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 0% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
Progress on shared amenities15
As on 6 Nov 2024, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | No | Not applicable |
| Water Supply | Yes | 100% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 100% |
| Storm Water Drains | No | Not applicable |
| Landscaping & Tree Planting | Yes | 100% |
| Street Lighting | No | Not applicable |
| Community Buildings | No | Not applicable |
| Treatment And Disposal Of Sewage And Sullage Water | No | Not applicable |
| Solid Waste Management And Disposal | Yes | 100% |
| Water conservation /Rain water harvesting | Yes | 100% |
| Energy managemcnt | Yes | 100% |
| Fire protection and fire safety requirements | Yes | 100% |
| Electrical meter room, sub-station, receiving station | Yes | 100% |
| Aggregate area of recreational Open Space | No | Not applicable |
| Open Parking | No | Not applicable |
Parking filed23
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
Land and ownership
MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
Certifying professionals and partners3
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | Mr Mallikarjun Ambegave MIND SPACES |
| Engineer | Ajinkya A Lahigude |
| Chartered Accountant | M S KUMBHAR AND ASSOCIATES |
| Partner | Role in project |
|---|---|
| POLITE DEVELOPERS | - |
Extensions applied for1
A revised date filed with the regulator does not change the possession date in your agreement for sale.
Reason as filed by the promoterWe have applied for Revision of Project Plan with PCMC on 13/10/2022 for some minor changes however the copy of said plan is not yet handed over to us. The detailed application is enclosed for your reference
Complaints filed with MahaRERA
No complaints on record against this registration.
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 27 Dec 2021 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 27 Dec 2021 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 16 Feb 2023 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 16 Feb 2023Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateOn the file
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
uploaded 12 Oct 2023
Documents filed90
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 90 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: CA Certificate Form 5.pdf | 6 Nov 2024 |
| Status of Formation of Legal Entity (Society/Co Op etc.)File: Shree Ganesh Tower Unit E Co op Hsg Society.pdf | 15 Dec 2023 |
| Architect’s Certificate on Completion of Project (Form 4)File: Form 4 Architect Certificate on Completion of Project 13102023.pdf | 13 Oct 2023 |
| Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: Completion-Occupancy Certificate 10102023.pdf | 12 Oct 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: CA Certificate Form 5.pdf | 6 Oct 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate form 1 acknowledgement copy from Bank 11042023.pdf | 13 Apr 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Certificate form 2 acknowledgement copy from Bank 11042023.pdf | 13 Apr 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate form 3 acknowledgement copy from Bank 11042023.pdf | 13 Apr 2023 |
| Disclosure of sold/ booked inventoryFile: Disclouser of Sold Booked Inventory 31032023.pdf | 5 Apr 2023 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: FORM 2A 2022 2023.pdf | 4 Apr 2023 |
| Building plan approvalFile: Sanctioned Plan 1.pdf | 16 Feb 2023 |
| Building plan approvalFile: Sanctioned Plan 2.pdf | 16 Feb 2023 |
| Building plan approvalFile: Sanctioned Plan 3.pdf | 16 Feb 2023 |
| Building plan approvalFile: Sanctioned Plan 4.pdf | 16 Feb 2023 |
| Building Plan Approval / NA Order for plotted developmentFile: Sanctioned Plan 1.pdf | 16 Feb 2023 |
| Building Plan Approval / NA Order for plotted developmentFile: Sanctioned Plan 2.pdf | 16 Feb 2023 |
| Building Plan Approval / NA Order for plotted developmentFile: Sanctioned Plan 3.pdf | 16 Feb 2023 |
| Building Plan Approval / NA Order for plotted developmentFile: Sanctioned Plan 4.pdf | 16 Feb 2023 |
| Commencement Certificates / NA Order for plotted developmentFile: Commencement Certficate.pdf | 16 Feb 2023 |
| Declaration about Commencement CertificateFile: Declaration about commencement certificate form D.pdf | 16 Feb 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate form 1 acknowledgement copy from Bank.pdf | 16 Jan 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Certificate form 2 acknowledgement copy from Bank.pdf | 16 Jan 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate form 3 acknowledgement copy from Bank.pdf | 16 Jan 2023 |
| Disclosure of sold/ booked inventoryFile: Disclouser of Sold Booked Inventory 31122022.pdf | 3 Jan 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: CA Certificate Form 5.pdf | 4 Nov 2022 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate form 1 acknowledgement copy from Bank.pdf | 19 Oct 2022 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Certificate form 2 acknowledgement copy from Bank.pdf | 19 Oct 2022 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate form 3 acknowledgement copy from Bank.pdf | 19 Oct 2022 |
| Disclosure of sold/ booked inventoryFile: Disclouser of Sold Booked Inventory 30092022.pdf | 6 Oct 2022 |
| Disclosure of sold/ booked inventoryFile: Disclouser of Sold Booked Inventory 30062022.pdf | 7 Jul 2022 |
| Disclosure of sold/ booked inventoryFile: Disclouser of Sold Booked Inventory 30062022.pdf | 4 Jul 2022 |
| Proforma of Allotment letterFile: Agreement to Sale 1.pdf | 22 Apr 2022 |
| Proforma of Allotment letterFile: Agreement to Sale 2.pdf | 22 Apr 2022 |
| Proforma of Allotment letterFile: Allotment Letter.pdf | 22 Apr 2022 |
| Disclosure of sold/ booked inventoryFile: Disclouser of Sold Booked Inventory 31032022.pdf | 5 Apr 2022 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: FORM 2A 2021 2022.pdf | 1 Apr 2022 |
| Proforma of Allotment letterFile: Agreement to Sale Part 1.pdf | 1 Apr 2022 |
| Proforma of Allotment letterFile: Agreement to Sale Part 2.pdf | 1 Apr 2022 |
| Proforma of Allotment letterFile: Allotment Letter.pdf | 1 Apr 2022 |
| CERSAI detailsFile: CERSAI Search Report.pdf | 28 Dec 2021 |
| Layout approvalFile: Layout Plan.pdf | 27 Dec 2021 |
| Building plan approvalFile: Building Plan 1.pdf | 27 Dec 2021 |
| Building plan approvalFile: Building Plan 2.pdf | 27 Dec 2021 |
| Building plan approvalFile: Building Plan 3.pdf | 27 Dec 2021 |
| PAN CardFile: PAN CARD.pdf | 27 Dec 2021 |
| Copy of the legal title reportFile: Search and title Report 1 9.pdf | 27 Dec 2021 |
| Copy of the legal title reportFile: Search and title Report 10 18.pdf | 27 Dec 2021 |
| Details of encumbrancesFile: Encumbrance Certificate.pdf | 27 Dec 2021 |
| Copy of Layout Approval (in case of layout)File: Layout Plan.pdf | 27 Dec 2021 |
| Building Plan Approval / NA Order for plotted developmentFile: Building Plan 1.pdf | 27 Dec 2021 |
| Building Plan Approval / NA Order for plotted developmentFile: Building Plan 2.pdf | 27 Dec 2021 |
| Building Plan Approval / NA Order for plotted developmentFile: Building Plan 3.pdf | 27 Dec 2021 |
| Commencement Certificates / NA Order for plotted developmentFile: COMMENCEMENT CERTIFICATE 14102021.pdf | 27 Dec 2021 |
| Declaration about Commencement CertificateFile: Form D.pdf | 27 Dec 2021 |
| Declaration in FORM BFile: Form B.pdf | 27 Dec 2021 |
| CERSAI detailsFile: CERSAI Undertaking.pdf | 27 Dec 2021 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate.pdf | 27 Dec 2021 |
| Proforma of Allotment letterFile: Allotment Letter.pdf | 27 Dec 2021 |
| Proforma of Allotment letterFile: Agreement to Sale.pdf | 27 Dec 2021 |
| Status of Formation of Legal Entity (Society/Co Op etc.)File: SHREE GANESH CO OP HSG SOCIETY.pdf | 27 Dec 2021 |
| OtherFile: 1 RESOLUTION ADHIKAR PATRA 26072010.pdf | 27 Dec 2021 |
| OtherFile: 2 NOC 26072010.pdf | 27 Dec 2021 |
| OtherFile: 3 AUTHORITY LETTER 26072010.pdf | 27 Dec 2021 |
| OtherFile: 4 NOC 26072010.pdf | 27 Dec 2021 |
| OtherFile: 5 Index 2 8171 2011.pdf | 27 Dec 2021 |
| OtherFile: 6 POA 8172 2011.pdf | 27 Dec 2021 |
| OtherFile: 7 RESOLUTION 11062017.pdf | 27 Dec 2021 |
| OtherFile: 8 Tharav 11062017.pdf | 27 Dec 2021 |
| OtherFile: 9 NOC OF SOCIETY of 12 MEMBERS 03102017.pdf | 27 Dec 2021 |
| OtherFile: 10 RETIREMENT CUM CONSTITUTION DEED OF PARTNERSHIP I.pdf | 27 Dec 2021 |
| OtherFile: 10 RETIREMENT CUM CONSTITUTION DEED OF PARTNERSHIP II.pdf | 27 Dec 2021 |
| OtherFile: 11 CONFIRMATION DEED Part 1.pdf | 27 Dec 2021 |
| OtherFile: 11 CONFIRMATION DEED Part 2.pdf | 27 Dec 2021 |
| OtherFile: 12 RESOLUTION and NOC 19122021.pdf | 27 Dec 2021 |
| OtherFile: 13 SHREE GANESH TOWER LEASE DEED.pdf | 27 Dec 2021 |
| OtherFile: 14 LETTER OF STAMP DUTY FREE SCHEME.pdf | 27 Dec 2021 |
| OtherFile: Development Agreement 1 15.pdf | 27 Dec 2021 |
| OtherFile: Development Agreement 16 30.pdf | 27 Dec 2021 |
| OtherFile: Development Agreement 31 38.pdf | 27 Dec 2021 |
| OtherFile: Development Agreement 39 46.pdf | 27 Dec 2021 |
Promoter's earlier projects1
As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.
| Project | Location | Flats | Status | Promised | Delivered |
|---|---|---|---|---|---|
| SHREE GANESH TOWER - UNIT D | BULK LAND NO 18 SECTOR NO 4 NEAR SAINATH HOSPITAL SAINT NAGAR MOSHI PCNTDA PUNE - 412105 | 42 | Completed | Mar 2018 | Late, Sep 2019 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Pune
Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.
Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Useful on a completed registration when you are buying resale, or checking what was promised against what was delivered.
- 1 condition on this project's record read and explained, with the clear checks alongside
- Joined against the promoter's 1 other registration and every project registered within 2 km, which the RERA portal never shows together
- All 90 filed documents as one ZIP, foldered, with a manifest
Keep SHREE GANESH TOWER - UNIT E on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near SECTOR NO 4, MOSHI-PCNTDA13,700+ in Pune
Filed coordinates, straight-line distance. 77 registered projects within 2 km.
TANISH PARK
TANISH DEVELOPERS
Ajinkya Towers
APAK Bussiness Innovation Pvt Ltd
SILVER GARDENIA
SILVER PROMOTERS AND DEVELOPERS
Mangalam Life Park
Mangalam Buildcorp
SingaPune Ph 3
Xrbia Mirth Properties LLP
SingaPune Ph 2
Xrbia Mirth Properties LLP
Builder: POLITE DEVELOPERS
POLITE DEVELOPERS has 2 registrations on MahaRERA, including SHREE GANESH TOWER - UNIT D and SHREE GANESH TOWER - UNIT E. Its filings disclose 1 earlier MahaRERA project: declares 0 of 1 past projects completed on time. Read the full track record. See more projects on the Pune district page.
Frequently asked questions
What are my rights if SHREE GANESH TOWER - UNIT E is delayed beyond 31 Mar 2023?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of SHREE GANESH TOWER - UNIT E?
The registered promoter entity is POLITE DEVELOPERS, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in SHREE GANESH TOWER - UNIT E?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How current is the construction progress shown for SHREE GANESH TOWER - UNIT E?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at SHREE GANESH TOWER - UNIT E?
The professionals named in the filing: Architect: Mr Mallikarjun Ambegave MIND SPACES; Engineer: Ajinkya A Lahigude; Chartered Accountant: M S KUMBHAR AND ASSOCIATES. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in SHREE GANESH TOWER - UNIT E?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.