Home / Browse projects / Pune, Maharashtra / SHREE GANESH HILLLVIEW
SHREE GANESH HILLLVIEW
RG-MH-04795 · RERA P52100020633 · Last updated on MahaRERA portal: 11 Feb 2025
Source: official MahaRERA filing
Red flags
- Completion date moved by 2 months
- 1 extension taken
Clear
- No litigation declared
- No complaints on record
- Separate project account declared
- Allotment letter follows the model form
- Recorded completed on MahaRERA
- All 1 earlier projects delivered on promise
2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.
See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
SHREE GANESH HILLLVIEW is a Residential / Group Housing project by MUKESH JAGDISH GOYAL in Pune, Maharashtra, registered with MahaRERA as P52100020633 on 30 Apr 2019. The registration is recorded completed; possession was promised by 8 Feb 2023. The completion date has moved by 2 months from the original filing.
At a glance
Project
- NameSHREE GANESH HILLLVIEW
- TypeResidential / Group Housing
- Location
- CHARHOLI
- Haveli
- Pune
- 412105
- Pincode412105
- RERA no.P52100020633
- ReraGenie IDRG-MH-04795
Key dates
Key facts
Registration and timeline
- StatusCompleted
- Registered on30 Apr 2019
- Promised completion8 Feb 2023
- Revised completionRevised to 8 Feb 2023 (originally 30 Dec 2022)
- Buildings1 building record
- Documents filed66 files
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| WING B | NA | 10 | 0 | 0 | 0 | 0 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building1
As on 11 Feb 2025, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
9 of 11 construction stages are filed complete. The stage furthest along is Sanitary Fittings within the flats / premises, at 95%.
WING B: 90% average across the applicable activities
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 95% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
Progress on shared amenities15
As on 11 Feb 2025, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | Yes | 95% |
| Water Supply | Yes | 100% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 100% |
| Storm Water Drains | No | Not applicable |
| Landscaping & Tree Planting | Yes | 100% |
| Street Lighting | No | Not applicable |
| Community Buildings | No | Not applicable |
| Treatment And Disposal Of Sewage And Sullage Water | No | Not applicable |
| Solid Waste Management And Disposal | No | Not applicable |
| Water conservation /Rain water harvesting | Yes | 100% |
| Energy managemcnt | No | Not applicable |
| Fire protection and fire safety requirements | Yes | 100% |
| Electrical meter room, sub-station, receiving station | Yes | 100% |
| Aggregate area of recreational Open Space | Yes | 100% |
| Open Parking | Yes | 50% |
Parking filed30
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
Land and ownership
MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
Certifying professionals and partners3
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | CUBIX ARCHITECT'S ASSOCIATES |
| Architect | J D ENTERPRISES |
| Chartered Accountant | CUBIX ARCHITECT'S ASSOCIATES |
| Partner | Role in project |
|---|---|
| MUKESH JAGDISH GOYAL | - |
Extensions applied for1
A revised date filed with the regulator does not change the possession date in your agreement for sale.
Reason as filed by the promoterThe reason for the delay in obtaining the full Completion Certificate is due to technical issues with the planning authority, which have led to delays in processing and issuing the certificate.• Requested Extension Date: 08/02/2023
Complaints filed with MahaRERA
No complaints on record against this registration.
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 6 Apr 2019 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 26 Apr 2019 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 26 Apr 2019 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 6 Apr 2019Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateOn the file
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
uploaded 28 Feb 2024
Documents filed66
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Disclosure of sold/ booked inventoryFile: Disclosure Of Sold Booked Inventory - converted.pdf | 11 Feb 2025 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Form 2A FY 2022-23.pdf | 15 Jan 2025 |
| Details of encumbrances concerned to FinanceFile: Details of Emcumbrances to legal.pdf | 14 Jan 2025 |
| Details of encumbrancesFile: Details of Emcumbrances to Finance.pdf | 14 Jan 2025 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: Form 2A Fy 2019-20.pdf | 14 Jan 2025 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Form 2A FY 2020-21.pdf | 14 Jan 2025 |
| Declaration about Commencement CertificateFile: Format D.pdf | 14 Jan 2025 |
| CERSAI detailsFile: Declaration Nil- CERSAI Report.pdf | 14 Jan 2025 |
| Declaration about all RERA Designated Bank Accounts (Format A)File: Separate Bank Account Declaration.pdf | 14 Jan 2025 |
| Details of encumbrances concerned to LegalFile: Details of Emcumbrances to legal.pdf | 14 Jan 2025 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: Form 2A FY 2021-22.pdf | 14 Jan 2025 |
| Disclosure of Interest in Other Real Estate OrganizationsFile: Disclosure of Interest.pdf | 14 Jan 2025 |
| Certificates of CA (Form 3)File: CA Certificate_2019-20.pdf | 7 Dec 2024 |
| Certificates of CA (Form 3)File: CA Certificate_2020-21.pdf | 7 Dec 2024 |
| Certificates of CA (Form 3)File: CA Certificate_2021-22.pdf | 7 Dec 2024 |
| Certificates of CA (Form 3)File: CA Certificate_2022-23.pdf | 7 Dec 2024 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: RERA Audit Report_19-20.pdf | 7 Dec 2024 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: RERA Audit Report_20-21.pdf | 7 Dec 2024 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: RERA Audit Report_21-22.pdf | 7 Dec 2024 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: RERA Audit Report_22-23.pdf | 7 Dec 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1_March 20.pdf | 4 Dec 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1_March 21.pdf | 4 Dec 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1_March 22.pdf | 4 Dec 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1_March 23.pdf | 4 Dec 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2_March 20.pdf | 4 Dec 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2_March 21.pdf | 4 Dec 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2_March 22.pdf | 4 Dec 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2_March 23.pdf | 4 Dec 2024 |
| Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: Shree Ganesh Hillview B wing OC.pdf | 28 Feb 2024 |
| Status of Formation of Legal Entity (Society/Co Op etc.)File: Society Formation .pdf | 28 Feb 2024 |
| Architect’s Certificate on Completion of Project (Form 4)File: Form 4_v1.pdf | 16 Jan 2020 |
| Building plan approvalFile: Building Plan 1_Final.pdf | 26 Apr 2019 |
| Building plan approvalFile: Building Plan 2_Final.pdf | 26 Apr 2019 |
| Building plan approvalFile: Building Plan 3_Final.pdf | 26 Apr 2019 |
| Building plan approvalFile: Building Plan 4_Final.pdf | 26 Apr 2019 |
| Layout approvalFile: Layout Signed final.pdf | 26 Apr 2019 |
| Copy of Layout Approval (in case of layout)File: Layout Signed final.pdf | 26 Apr 2019 |
| Building Plan Approval (IOD)File: Building Plan 1_Final.pdf | 26 Apr 2019 |
| Building Plan Approval (IOD)File: Building Plan 2_Final.pdf | 26 Apr 2019 |
| Building Plan Approval (IOD)File: Building Plan 3_Final.pdf | 26 Apr 2019 |
| Building Plan Approval (IOD)File: Building Plan 4_Final.pdf | 26 Apr 2019 |
| PAN CardFile: PAN CARD.pdf | 6 Apr 2019 |
| Copy of the legal title reportFile: Legal Title Report.pdf | 6 Apr 2019 |
| Details of encumbrancesFile: Details of encumbrances.pdf | 6 Apr 2019 |
| Commencement Certificates / NA Order for plotted developmentFile: Commencement Certificate.pdf | 6 Apr 2019 |
| Declaration in FORM BFile: Form B-merged.pdf | 6 Apr 2019 |
| Certificates of CA (Form 3)File: CA Certificate.pdf | 6 Apr 2019 |
| Proforma of Allotment letterFile: Proforma 1.pdf | 6 Apr 2019 |
| Proforma of Allotment letterFile: Proforma 2.pdf | 6 Apr 2019 |
| Proforma of Allotment letterFile: Proforma 3.pdf | 6 Apr 2019 |
| Proforma of Allotment letterFile: Proforma 4.pdf | 6 Apr 2019 |
| Proforma of Allotment letterFile: Proforma 5.pdf | 6 Apr 2019 |
| Proforma of Allotment letterFile: Proforma 6.pdf | 6 Apr 2019 |
| Proforma of Allotment letterFile: Proforma 7.pdf | 6 Apr 2019 |
| Proforma of Allotment letterFile: Proforma 8.pdf | 6 Apr 2019 |
| Proforma of Allotment letterFile: Proforma 9.pdf | 6 Apr 2019 |
| Proforma of Allotment letterFile: Proforma 10.pdf | 6 Apr 2019 |
| Proforma of Allotment letterFile: Proforma 11.pdf | 6 Apr 2019 |
| Proforma of Allotment letterFile: Proforma 12.pdf | 6 Apr 2019 |
| Proforma of Allotment letterFile: Proforma 13.pdf | 6 Apr 2019 |
| Proforma of Allotment letterFile: Proforma 14.pdf | 6 Apr 2019 |
| Proforma of Allotment letterFile: Proforma 15.pdf | 6 Apr 2019 |
| Proforma of Allotment letterFile: Proforma 16.pdf | 6 Apr 2019 |
| Proforma of Allotment letterFile: Proforma 17.pdf | 6 Apr 2019 |
| Proforma of Allotment letterFile: Proforma 18.pdf | 6 Apr 2019 |
| Proforma of Allotment letterFile: Proforma 19.pdf | 6 Apr 2019 |
Promoter's earlier projects1
As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.
| Project | Location | Flats | Status | Promised | Delivered |
|---|---|---|---|---|---|
| SHREE GANESH HILLVIEW WING A | CHAROHLI PUNE | 48 | Completed | Dec 2018 | Dec 2018 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Pune
Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.
Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Useful on a completed registration when you are buying resale, or checking what was promised against what was delivered.
- 2 conditions on this project's record read and explained, with the clear checks alongside
- Joined against the promoter's 2 other registrations, which the RERA portal never shows together
- All 66 filed documents as one ZIP, foldered, with a manifest
Keep SHREE GANESH HILLLVIEW on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near CHARHOLI13,700+ in Pune
TANISH PARK
TANISH DEVELOPERS
Ajinkya Towers
APAK Bussiness Innovation Pvt Ltd
SILVER GARDENIA
SILVER PROMOTERS AND DEVELOPERS
Mangalam Life Park
Mangalam Buildcorp
SingaPune Ph 3
Xrbia Mirth Properties LLP
SingaPune Ph 2
Xrbia Mirth Properties LLP
Builder: MUKESH JAGDISH GOYAL
MUKESH JAGDISH GOYAL has 3 registrations on MahaRERA, including SHREE GANESH HILLVIEW and SHREE GANESH HILLLVIEW. Its filings disclose 3 earlier MahaRERA projects: declares 3 of 3 past projects completed on time. Read the full track record. See more projects on the Pune district page.
Frequently asked questions
What are my rights if SHREE GANESH HILLLVIEW is delayed beyond 8 Feb 2023?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of SHREE GANESH HILLLVIEW?
The registered promoter entity is MUKESH JAGDISH GOYAL, an individual as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in SHREE GANESH HILLLVIEW?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How current is the construction progress shown for SHREE GANESH HILLLVIEW?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at SHREE GANESH HILLLVIEW?
The professionals named in the filing: Architect: CUBIX ARCHITECT'S ASSOCIATES; Architect: J D ENTERPRISES; Chartered Accountant: CUBIX ARCHITECT'S ASSOCIATES. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in SHREE GANESH HILLLVIEW?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback