SHREE GANADHISH PARK
RG-MH-15132 · RERA P51600034580 · Last updated on MahaRERA portal: 30 Oct 2025
Source: official MahaRERA filing
Or get an email each time it changes, with the project watch
Red flags
- Possession 1 months past the filed date
- Completion date moved by 11 months
- 1 extension taken
Clear
- No litigation declared
- No complaints on record
- No encumbrance on the project land
- Separate project account declared
- Allotment letter follows the model form
3 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.
See what the report covers Free either way: or have every new Nashik registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
SHREE GANADHISH PARK is a Others project by C K DEVELOPERS in Nashik, Maharashtra, registered with MahaRERA as P51600034580 on 11 Apr 2022. Possession was promised by 16 Sep 2026 and is now 1 months past that date. The completion date has moved by 11 months from the original filing. 35 of the 74 units on this registration are recorded sold or booked, and 4 of 11 construction stages are filed complete.
At a glance
Project
- NameSHREE GANADHISH PARK
- TypeOthers
- Location
- INDIRA NAGAR - DGP NAGAR ROAD
- WADALA NASHIK
- Nashik (M Corp.)
- Nashik
- 422006
- Pincode422006
- MapView location on Google Maps (as filed on RERA)
- RERA no.P51600034580
- ReraGenie IDRG-MH-15132
Builder
- NameC K DEVELOPERS
- Entity typePartnership
- PartnersMAHENDRA MISHRILAL CHOPDA, PRADEEP MOHANLAL KANKARIYA
- Other registrations2 more →
- No longer live1 lapsed, de-registered or revoked
- Past their filed date1
Key dates
Key facts
Registration and timeline
- StatusRegistered
- Registered on11 Apr 2022
- Promised completion16 Sep 2026
- Revised completionRevised to 16 Sep 2026 (originally 31 Oct 2025)
- Buildings1 building record
- Documents filed87 files
Current status
Figures as on 30 Oct 2025, this project's latest MahaRERA filing.
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| SHREE GANADHISH PARK | NA | 9 | 9 | 60 | 14 | 74 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building1
As on 30 Oct 2025, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
4 of 11 construction stages are filed complete. The stage furthest along is Internal walls, at 90%.
SHREE GANADHISH PARK: 74% average across the applicable activities
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 100% |
| Plinth | 100% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 0% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 90% |
| Sanitary Fittings within the flats / premises | 90% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 90% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 90% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 50% |
Progress on shared amenities15
As on 30 Oct 2025, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | No | Not applicable |
| Water Supply | Yes | 100% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | No | Not applicable |
| Storm Water Drains | No | Not applicable |
| Landscaping & Tree Planting | No | Not applicable |
| Street Lighting | No | Not applicable |
| Community Buildings | No | Not applicable |
| Treatment And Disposal Of Sewage And Sullage Water | No | Not applicable |
| Solid Waste Management And Disposal | No | Not applicable |
| Water conservation /Rain water harvesting | No | Not applicable |
| Energy managemcnt | No | Not applicable |
| Fire protection and fire safety requirements | No | Not applicable |
| Electrical meter room, sub-station, receiving station | Yes | 100% |
| Aggregate area of recreational Open Space | No | Not applicable |
| Open Parking | No | Not applicable |
Land and ownership5
MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.
| Landowner | Village | District |
|---|---|---|
| NARINDER GURUCHANDRASINGH KEER | Nashik (M Corp.) | Nashik |
| PRAKASH GANESH CHAUDHARI | Mumbai City | Mumbai City |
| NITIN SHASHIKANT MATKAR | Mumbai City | Mumbai City |
| NARENDRA GANESH CHAUDHARI | Nashik (M Corp.) | Nashik |
| BHUSHAN RAMESH PATIL | Dondaicha-Warwade(M Cl) | Dhule |
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
| Building | Wing | Estimated | Incurred |
|---|---|---|---|
| SHREE GANADHISH PARK | NA | Rs 10.68 cr | Rs 6.20 cr |
Certifying professionals and partners4
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | MOHIT KARNAVAT |
| Engineer | MILIND RATHI |
| Chartered Accountant | CA LALIT PAWAR |
| Chartered Accountant | RAMANAND M DINGORE |
| Partner | Role in project |
|---|---|
| C K DEVELOPERS | - |
Extensions applied for1
A revised date filed with the regulator does not change the possession date in your agreement for sale.
Reason as filed by the promoterSome finishing works and final-stage activities are currently in progress at the site. After their completion, some additional time will be required to apply for and obtain the Final Completion Certificate from the local authority.
Complaints filed with MahaRERA
No complaints on record against this registration.
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 23 Mar 2022 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 18 Mar 2022 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 18 Mar 2022 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 18 Mar 2022Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateNot on the file
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
Documents filed87
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 87 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Form 5 (FY 2024-2025)File: FORM 5 2425.pdf | 30 Oct 2025 |
| Form 5 (FY 2023-2024)File: Form 5 F Y 2324.pdf | 30 Oct 2025 |
| Form 5 (FY 2022-2023)File: Form 5 F Y 2223.pdf | 30 Oct 2025 |
| Withdrawal Update Form 1File: CKD Archi Cert 30-09-25.pdf | 14 Oct 2025 |
| Withdrawal Update Form 1File: CKD Archi Cert 30-09-25.pdf | 14 Oct 2025 |
| Withdrawal Update Form 2File: CKD Engi Cert 30-09-25.pdf | 14 Oct 2025 |
| Withdrawal Update Form 2File: CKD Engi Cert 30-09-25.pdf | 14 Oct 2025 |
| Withdrawal Update Form 3File: CKD C A Cert Form3.pdf | 14 Oct 2025 |
| Withdrawal Update Form 3File: CKD C A Cert Form3.pdf | 14 Oct 2025 |
| Form 1File: CKD Archi Cert 31-03-25.pdf | 3 Oct 2025 |
| Form 2File: CKD Engi Cert 31-03-25.pdf | 3 Oct 2025 |
| Form 3File: 26-09 CKD 2425 Q IV.pdf | 3 Oct 2025 |
| Disclosure of Sold and Booked InventoryFile: 26-09 CKD Information 31-03-25.pdf | 3 Oct 2025 |
| Form 1File: CKD Archi Cert 31-03-25.pdf | 3 Oct 2025 |
| Form 2File: CKD Engi Cert 31-03-25.pdf | 3 Oct 2025 |
| Form 3File: 26-09 CKD 2425 Q IV.pdf | 3 Oct 2025 |
| Disclosure of Sold and Booked InventoryFile: 26-09 CKD Information 31-03-25.pdf | 3 Oct 2025 |
| Form 1File: CKD Archi Cert 30-06-25.pdf | 3 Oct 2025 |
| Form 2File: CKD Engi Cert 30-06-25.pdf | 3 Oct 2025 |
| Form 3File: 26-09 CKD 2526 Q I.pdf | 3 Oct 2025 |
| Disclosure of Sold and Booked InventoryFile: 26-09 CKD Information 30-06-2025.pdf | 3 Oct 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 30 06 2024.pdf | 27 Feb 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 30 09 2024.pdf | 27 Feb 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 31 12 2024.pdf | 27 Feb 2025 |
| Disclosure of sold/ booked inventoryFile: SOLD UNSOLD 31 12 2024.pdf | 27 Feb 2025 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Form 5 F Y 2223.pdf | 19 Feb 2025 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Form 5 F Y 2324.pdf | 19 Feb 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: CKD Form 1 31-12-24_compressed.pdf | 13 Feb 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: CKD Form 1 30-06-24_compressed.pdf | 13 Feb 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: CKD Form 1 30-09-24_compressed.pdf | 13 Feb 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: CKD Form 1 31-12-24_compressed.pdf | 13 Feb 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: CKD Form 2 30-06-2024_compressed.pdf | 13 Feb 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: CKD Form 2 30-09-2024_compressed.pdf | 13 Feb 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: CKD Form 2 31-12-2024_compressed.pdf | 13 Feb 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 31 12 2023 C K DEV.pdf | 18 Jun 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 31 03 2024 C K DEV.pdf | 18 Jun 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: form 2 ENGINEER'S CERTIFICATE2023.pdf | 18 Jun 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: form 2 ENGINEER'S CERTIFICATE2024.pdf | 18 Jun 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: FORM-2 A.pdf | 18 Jun 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: FORM-2A.pdf | 18 Jun 2024 |
| Disclosure of sold/ booked inventoryFile: 31 03 2024 C K Devlopers sold unsold.pdf | 18 Jun 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 31 12 2023 C A Certaficat CK.pdf | 18 Jun 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM-3 C K Devlop 31 03 2024_11zon.pdf | 18 Jun 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 Architect Certificates.pdf | 16 Dec 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: architect's certificate.pdf | 16 Dec 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 AYA Engineering.pdf | 16 Dec 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: form-2 engineer certificate.pdf | 16 Dec 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: form-2 engineer's certificate.pdf | 16 Dec 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FOMR 3 30 06 2023.pdf | 16 Dec 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 30 09 2023.pdf | 16 Dec 2023 |
| Disclosure of sold/ booked inventoryFile: C K DEVLOPERS SOLD UNSOLD 31-03-2023.pdf | 30 May 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: C K DEVELOPER FORM 1.pdf | 26 May 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: C K DEVLOPER FORM-2.pdf | 26 May 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: C K DEVLOPER FORM-3.pdf | 26 May 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 ARCHITECTS CER 30-09-2022.pdf | 25 Feb 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: C K Devlopers Form 1 31-12-2022.pdf | 25 Feb 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 ENGINNER CER 30-09-2022.pdf | 25 Feb 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: C K Devlopers Form 2 31-12-2023.pdf | 25 Feb 2023 |
| Disclosure of sold/ booked inventoryFile: SOLD UNSOLD 31-12-2022.pdf | 25 Feb 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 C A CERTIFICATE 30-09-2022_compressed.pdf | 25 Feb 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: C K Devlopers Form 3 31-12-2023.pdf | 25 Feb 2023 |
| Declaration in FORM BFile: FORM B.pdf | 24 Mar 2022 |
| Copy of the legal title reportFile: TITEL REPORT.pdf | 23 Mar 2022 |
| CERSAI detailsFile: CK DECLERATION OF LOAN ON LAND AND PROJECT.pdf | 23 Mar 2022 |
| CERSAI detailsFile: CERSAI FINAL.pdf | 23 Mar 2022 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: C K DEVP FORM 3.pdf | 21 Mar 2022 |
| Layout approvalFile: Layout plan wadala plot (2).pdf | 18 Mar 2022 |
| Building plan approvalFile: BUILDING PLAN 1.pdf | 18 Mar 2022 |
| Building plan approvalFile: BUILDING PLAN 2.pdf | 18 Mar 2022 |
| Building plan approvalFile: BUILDING PLAN 3.pdf | 18 Mar 2022 |
| PAN CardFile: pan card ck.pdf | 18 Mar 2022 |
| Details of encumbrancesFile: CK DECLERATION FOR NON-ENCUMBRAMCE.pdf | 18 Mar 2022 |
| Copy of Layout Approval (in case of layout)File: Layout plan wadala plot (2).pdf | 18 Mar 2022 |
| Building Plan Approval / NA Order for plotted developmentFile: BUILDING PLAN 1.pdf | 18 Mar 2022 |
| Building Plan Approval / NA Order for plotted developmentFile: BUILDING PLAN 2.pdf | 18 Mar 2022 |
| Building Plan Approval / NA Order for plotted developmentFile: BUILDING PLAN 3.pdf | 18 Mar 2022 |
| Commencement Certificates / NA Order for plotted developmentFile: commencement.pdf | 18 Mar 2022 |
| Declaration about Commencement CertificateFile: CK DEVELOPERS COMMENCEMENT LETTER.pdf | 18 Mar 2022 |
| Declaration in FORM BFile: FORM B CK AFFIDAVIT.pdf | 18 Mar 2022 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 ARCHITECT'S CERTIFICATE.pdf | 18 Mar 2022 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Nashik
Computed across the 4,100+ Nashik projects on ReraGenie, from their own filings.
Free monthly report: Nashik on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Built from this project's filings on the day you order, in plain language.
- 3 conditions on this project's record read and explained, with the clear checks alongside
- Joined against the promoter's 2 other registrations and every project registered within 2 km, which the RERA portal never shows together
- All 87 filed documents as one ZIP, foldered, with a manifest
- The project watch below, included free for 90 days
Project watch
Only want to be told when something changes?
- An email each time this filing moves: new sales, a moved possession date, an extension, a complaint, the occupancy certificate
- Plain words, conditions that have happened marked in red
- A summary of everything that changed when the 90 days end
Keep SHREE GANADHISH PARK on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near WADALA NASHIK4,100+ in Nashik
Filed coordinates, straight-line distance. 221 registered projects within 2 km.
SIGNIFICANT
IND DEVELOPERS
Shree Parshwanath
Darshan Anil Lodha
Anandsagar Annex Phase 1 ( L and M Wing )
Ravi Mahajan Builders & Developers Pvt. Lt
SHREEJI INSPERIA
Shreeji Landmarks LLP
Pawa Blossom
Pawa Construction
Bait E Muhammad Phase 1
Onyx Constructions
See every Nashik project, with the district possession charts
Builder: C K DEVELOPERS
C K DEVELOPERS has 3 registrations on MahaRERA, including SUBHADRA HEIGHTS and SHREE GANADHISH PARK. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Nashik district page.
Frequently asked questions
What are my rights if SHREE GANADHISH PARK is delayed beyond 16 Sep 2026?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of SHREE GANADHISH PARK?
The registered promoter entity is C K DEVELOPERS, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in SHREE GANADHISH PARK?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How current is the construction progress shown for SHREE GANADHISH PARK?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at SHREE GANADHISH PARK?
The professionals named in the filing: Architect: MOHIT KARNAVAT; Engineer: MILIND RATHI; Chartered Accountant: CA LALIT PAWAR; Chartered Accountant: RAMANAND M DINGORE. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in SHREE GANADHISH PARK?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback