SHREE ENCLAVE MYSORE (iT PARK) 5
By ESS AND ESS INFRASTRUCTURE PRIVATE LIMITED
RG-KA-84813 · RERA PRM/KA/RERA/1268/378/PR/020323/005758 · Last updated on RERA Karnataka portal: 15 Oct 2026
Source: official RERA Karnataka filing
Red flags
- No red flags in this filing
Clear
- No litigation declared
- No complaints on record
- Completion date never moved
- Separate project account declared
Saved.
SHREE ENCLAVE MYSORE (iT PARK) 5 is a Plotted Development project by ESS AND ESS INFRASTRUCTURE PRIVATE LIMITED in Mysore, Karnataka, registered with RERA Karnataka as PRM/KA/RERA/1268/378/PR/020323/005758 on 2 Mar 2023. Possession is promised by 16 Sep 2026.
At a glance
Project
- NameSHREE ENCLAVE MYSORE (iT PARK) 5
- TypePlotted Development
- Location
- MYSORE
- PincodeNot stated
- RERA no.PRM/KA/RERA/1268/378/PR/020323/005758
- ReraGenie IDRG-KA-84813
Key dates
Key facts
Registration and timeline
- StatusRegistration approved
- Registered on2 Mar 2023
- Promised completion16 Sep 2026
- Revised completionNone
- BuildingsNot stated in filing
- Documents filed100 files
Current status
Figures as on 15 Oct 2026, this project's latest RERA Karnataka filing.
The full filing
Everything below is from the project's own RERA Karnataka filing, free to read.
Land and ownership2
This page carries no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.
| Landowner | Village | District |
|---|---|---|
| Sri SM Darshan | - | - |
| Sri Shreekaanth Daas The Director for Ess and Ess Infrastructure Pvt.Ltd | - | - |
Project account and cost
70 percent of buyer money must sit in the project account, so check that your agreement for sale names a designated account for this project and pay into that account only.
| Cost line | Estimated | Incurred |
|---|---|---|
| Estimated Cost of Construction as certified by Engineer | Rs 1.08 cr | Rs 16.04 lakh |
| On-site expenditure-Salaries of workers | Rs 43.38 lakh | Rs 19.07 lakh |
| On-site expenditure-Site Overhead | Rs 35.49 lakh | Rs 8.32 lakh |
| On-site expenditure-Cost Of Services(Water, Electricity, Sewage) | Rs 5.91 lakh | Rs 13,976 |
| On-site expenditure-Consultants Fees | Rs 3.94 lakh | - |
Certifying professionals and partners2
Certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Engineer | C B Lakshman Rao |
| Chartered Accountant | A Vishwanatha |
Complaints filed with RERA Karnataka
No complaints on record against this registration.
Documents filed100
As listed on the registration, under the names the promoter filed them with; the newest 80 of 100 are shown. The files themselves are available at source: search the registration number PRM/KA/RERA/1268/378/PR/020323/005758 on the RERA Karnataka portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Q2 2026-27 Form-4 Certificate issued by Chartered AccountantFile: 1 Certificate Issued by Chartered Accountant Form 4.PDF | 15 Oct 2026 |
| Q2 2026-27 Form-6 Certificate issued by Structural EngineerFile: 2 Certificate Issued by Engineer Form 6.PDF | 15 Oct 2026 |
| Q2 2026-27 Engineering Department (PWD) for completion of development works | 15 Oct 2026 |
| Q2 2026-27 Horticulture department | 15 Oct 2026 |
| Q1 2026-27 Form-4 Certificate issued by Chartered AccountantFile: 1 Certificate issued by Chartered Account Form 4.PDF | 14 Jul 2026 |
| Q1 2026-27 Form-6 Certificate issued by Structural EngineerFile: 2 Certificate Issued by Engineer Form 6.PDF | 14 Jul 2026 |
| Q1 2026-27 Horticulture department | 14 Jul 2026 |
| Q4 2025-26 Form-4 Certificate issued by Chartered AccountantFile: 1 Certificate issued by Chartered Account Form 4.PDF | 15 Apr 2026 |
| Q4 2025-26 Form-6 Certificate issued by Structural EngineerFile: 2 Certificate Issued by Engineer Form 6.PDF | 15 Apr 2026 |
| Q4 2025-26 Horticulture department | 15 Apr 2026 |
| Q3 2025-26 Form-4 Certificate issued by Chartered AccountantFile: 1 Certificate issued by Chartered Account Form 4.PDF | 13 Jan 2026 |
| Q3 2025-26 Form-6 Certificate issued by Structural EngineerFile: 2 Certificate Issued by Engineer Form 6.PDF | 13 Jan 2026 |
| Q3 2025-26 Horticulture department | 13 Jan 2026 |
| Query & ReplyFile: Query & Reply.pdf | 27 Feb 2023 |
| 1. Certified Copy obtained by the concerned Sub-registrar regarding value of the property on the basFile: 1 Certified Copy of Guidance Value.pdf | 27 Feb 2023 |
| 2. Hissa Pody Copy has been Uploaded.File: 2 Hissa Pody Copy.pdf | 27 Feb 2023 |
| 3. Project Status fromFile: 3 Project Status Updated.pdf | 27 Feb 2023 |
| 4. Estimated cost of construction for civil works certified by the Engineer has been Uploaded.File: 4 Estimated Cost of Construction Certified by the Engineer.PDF | 27 Feb 2023 |
| 5. Proforma of Allotment Letter (Declaration)File: 5 Proforma of Allotment Letter (Declaration).PDF | 27 Feb 2023 |
| 6. The STP/Septic Tank, Soak pit and sewer line demarcation drawing has been Uploaded.File: 6 Demarcated drawing of STP, Soak Pit & Sewer Line.pdf | 27 Feb 2023 |
| RTC, survey 200/3 | - |
| Mutation, survey 200/3 | - |
| Encumbrance Certificate, survey 200/3 | - |
| Conversion/Alienation Order, survey 200/3 | - |
| Sale/Title/Gift Deed, survey 200/3 | - |
| JDA, survey 200/3 | - |
| Khatha, survey 200/3 | - |
| RTC, survey 201/1 | - |
| Mutation, survey 201/1 | - |
| Encumbrance Certificate, survey 201/1 | - |
| Conversion/Alienation Order, survey 201/1 | - |
| Sale/Title/Gift Deed, survey 201/1 | - |
| Khatha, survey 201/1 | - |
| Registration CertificateFile: Registration Certificate.pdf | - |
| Organization StructureFile: Organisation Structure.pdf | - |
| Certificate issued by CA Form 1File: Form 1 - Certificate issued by Chartered Account.pdf | - |
| Certificate issued by Engineer Form 3File: Engineer Certificate Form 3.PDF | - |
| Project Chartered Accountant | - |
| Project Engineer | - |
| AffidavitFile: No Case Affidavit.PDF | - |
| Certificate from Chartered AccountFile: Form 1 - Certificate issued by Chartered Account.pdf | - |
| Balance Sheet 2021 - 2022File: 1 Balance Sheet FY 2021-22.pdf | - |
| Balance Sheet 2020 - 2021File: 1 Balance Sheet FY 2020-21.pdf | - |
| Balance Sheet 2019 - 2020File: 1 Balance Sheet FY 2019-20.pdf | - |
| Audited Profit and Loss Statement 2021 - 2022File: 2 Profit and Loss Statement FY 2021-22.pdf | - |
| Audited Profit and Loss Statement 2020 - 2021File: 2 Profit and Loss Account Fy 2020-21.pdf | - |
| Audited Profit and Loss Statement 2019 - 2020File: 2 Profit and Loss Statement FY 2019-20.pdf | - |
| Director's Report 2021 - 2022File: 3 Directors Report FY 2021-22.pdf | - |
| Director's Report 2020 - 2021File: 3 Directors Report FY 2020-21.pdf | - |
| Director's Report 2019 - 2020File: 3 Directors Report FY 2019-20.pdf | - |
| Cash Flow Statement 2021 - 2022File: 4 Cash Flow Statement FY 2021-22.pdf | - |
| Cash Flow Statement 2020 - 2021File: 4 Cash Flow Statement FY 2020-21.pdf | - |
| Auditor's Report 2021 - 2022File: 5 Auditors Report FY 2021-22.pdf | - |
| Auditor's Report 2020 - 2021File: 5 Auditors Report FY 2020-21.pdf | - |
| Auditor's Report 2019 - 2020File: 5 Auditors Report FY 2019-20.pdf | - |
| Income Tax Return Acknowledgement 2021 - 2022File: 6 Income Tax Return Acknowledgement FY 2021-22.pdf | - |
| Income Tax Return Acknowledgement 2020 - 2021File: 6 Income Tax Return Acknowledgement FY 2020-21.pdf | - |
| Income Tax Return Acknowledgement 2019 - 2020File: 6 Income Tax Return Acknowledgement FY 2019-20.pdf | - |
| PLAN APPROVAL LETTER | - |
| CESCOM NOC along with the receipt | - |
| KUWS&DB NOC | - |
| Approved Plan | - |
| Approved Plan | - |
| Approved Plan | - |
| Approved Plan | - |
| Signed Project Specifications along with Project Name and Address | - |
| Approved Plan | - |
| Demarcated Plan | - |
| ADVOCATE TITLE SEARCH | - |
| Conversion Order | - |
| Tittle Deeds of all Survey Numbers | - |
| Proforma of Agreement for Sale | - |
| Allotment letter | - |
| Brochure | - |
| FORM B | - |
| AFFIDAVIT 3(1) | - |
| Joint Affidavit Cum Declaration | - |
| CESCOM NOC along with the receipt | - |
| KUWS&DB NOC | - |
| Unnamed document | - |
Promoter's earlier projects40
As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.
| Project | Location | Status | Promised | Delivered |
|---|---|---|---|---|
| JSS 4TH SAGE BLOCK B | Madapura Village and Aragowdanahalli Village, Varuna Hobli, Mysore Taluk, | Ongoing | Jun 2028 | Not due yet |
| Amruthasagara | Huyilalu village, Ilwala Hobli, Mysore Taluk & Mysore District | Ongoing | Nov 2027 | Not due yet |
| JSS 4TH STAGE BLOCK A | Madapura Village, Varuna Hobli, Mysuru Taluk & Mysuru District | Ongoing | Mar 2027 | Not due yet |
| SREE SAPTHAMATHRUKA 5 & NANDI NAGARA | Madapura Village, Varuna Hobli, Mysuru Taluk & Mysuru District | Ongoing | Oct 2026 | Not due yet |
| KUBERANANDHASAGARA 12B | Maidanahalli Village, Ilwala Hobli, Mysore Taluk & Mysore District | Ongoing | Jun 2026 | Not delivered |
| SAHA GRANDEUR | Maidanahalli Village , Ilwala Hobli, Mysore Taluk | Ongoing | Jun 2026 | Not delivered |
| Sree Sapthamathruka 1B | Madapura Village, Varuna Hobli, Mysuru Taluk & Mysuru District | Ongoing | Dec 2025 | Not delivered |
| Kuberanandhasagara Layout Phase 8 | Maidhanahalli Village, Ilwala Hobli, Mysore Taluk, Mysore District | Ongoing | May 2025 | Not delivered |
| Kuberanandhasagara Layout Phase 3 | Maidhanahalli Village, Ilwala Hobli, Mysore Taluk, Mysore District | Ongoing | May 2025 | Not delivered |
| Kuberanandhasagara Layout Phase 2 | Maidhanahalli Village, Ilwala Hobli, Mysore Taluk, Mysore District | Ongoing | May 2025 | Not delivered |
| Kuberanandhasagara Layout Phase 1 | Maidhanahalli Village, Ilwala Hobli, Mysore Taluk, Mysore District | Ongoing | May 2025 | Not delivered |
| Kuberanandhasagara Layout 11 | Maidhanahalli Village, Ilwala Hobli, Mysore Taluk, Mysore District | Ongoing | May 2025 | Not delivered |
| Kuberanandhasagara Layout 10 | Maidhanahalli Village, Ilwala Hobli, Mysore Taluk, Mysore District | Ongoing | May 2025 | Not delivered |
| Athmanandhasagara Layout Phase 4 | Nagawala Village, Ilwala Hobli, Mysore Taluk, Mysore District | Ongoing | May 2025 | Not delivered |
| Athmanandhasagara Layout Phase 3 | Nagawala Village, Ilwala Hobli, Mysore Taluk, Mysore District | Ongoing | May 2025 | Not delivered |
| Athmanandhasagara Layout Phase 2 | Nagawala Village, Ilwala Hobli, Mysore Taluk, Mysore District | Ongoing | May 2025 | Not delivered |
| Athmanandhasagara Layout Phase 1 | Nagawala Village, Ilwala Hobli, Mysore Taluk, Mysore District | Ongoing | May 2025 | Not delivered |
| Athmanandhasagara 5C | Nagawala Village , Ilwala Hobli , Mysuru Taluk, | Ongoing | Dec 2024 | Not delivered |
| Athmanandhasagara 5B | Nagawala Village , Ilwala Hobli , Mysuru Taluk, | Ongoing | Dec 2024 | Not delivered |
| Athmanandhasagara 5A | Nagawala Village, Ilwala Hobli, Mysore Taluk, Mysore District | Ongoing | Dec 2024 | Not delivered |
| Shreesha Hill View Layout Phase 3 | Sarkari Utthanahalli Village, Varuna Hobli, Mysore Taluk and Mysore District | Ongoing | Jan 2023 | Not delivered |
| Shreesha Hill View Layout Phase 2 | Sarkari Utthanahalli Village, Varuna Hobli, Mysore Taluk and Mysore District | Ongoing | Jan 2023 | Not delivered |
| Athmanandhasgara 6 | Nagawala Village, Ilwala Hobli, Mysore Taluk, Mysore District | Ongoing | Jun 2022 | Not delivered |
| Stavya Layout | Huyilalu Village, Ilawala Hobli, Mysore Taluk and Mysore District | Ongoing | May 2022 | Not delivered |
| Sree Sapthamathruka Layout Phase 4 | Marashettihalli Village, Varuna Hobli, Mysore Taluk, Mysore District | Ongoing | May 2022 | Not delivered |
| Paramanandhasagara and Sukhanandhasagara Layout Phase 1 | Huyilalu Village, Ilawala Hobli, Mysore Taluk and Mysore District | Ongoing | May 2022 | Not delivered |
| Paramanandhasagara Layout Phase 2 | Huyilalu village, Ilwala hobli,, Mysore taluk & district | Ongoing | May 2022 | Not delivered |
| Nithyanandhasagara Layout Phase 3 | Huyilalu Village, Ilawala Hobli, Mysore Taluk and Mysore District | Ongoing | May 2022 | Not delivered |
| Nithyanandhasagara Layout Phase 2 | Huyilalu Village, Ilawala Hobli, Mysore Taluk and Mysore District | Ongoing | May 2022 | Not delivered |
| Nithyanandhasagara Layout Phase 1 | Huyilalu Village, Ilawala Hobli, Mysore Taluk and Mysore District | Ongoing | May 2022 | Not delivered |
| Sukhanandhasagara 4 | Bommanhalli Village, Ilawala Hobli, Mysore Taluk & Mysore District | Ongoing | Apr 2022 | Not delivered |
| Venkatagiri Layout | Goruru Village, Kasaba Hobli, Mysore Taluk, Mysore District | Completed | - | No date filed |
| Venkatadri Layout | Belawadi Village, Ilawala Hobli, Mysore Taluk and Mysore District | Completed | - | No date filed |
| Svasthi Retreat | Marashettihalli Village, Varuna Hobli, Mysuru Taluk & Mysuru District | Completed | - | No date filed |
| Sree Sapthamathruka Layout Phase 3 | Yandahalli & Madapura Village, Varuna Hobli, Mysore Taluk and Mysore District | Completed | - | No date filed |
| Sree Sapthamathruka Layout Phase 2 | Yandahalli & Madapura Village, Varuna Hobli, Mysore Taluk and Mysore District | Completed | - | No date filed |
| Sree Sapthamathruka Layout Phase 1/A | Yandahalli Village, Varuna Hobli, Mysore Taluk and Mysore District | Completed | - | No date filed |
| Sree Sapthamathruka Layout Phase 1 | Yandahalli Village, Varuna Hobli, Mysore Taluk and Mysore District | Completed | - | No date filed |
| Sree Sapthamathruka 6 | Janthagalli Village, Varuna Hobli, Mysuru Taluk & Mysuru District | Completed | - | No date filed |
| Sourish Layout | Madagalli Village, Ilawala Hobli, Mysore Taluk and Mysore District | Completed | - | No date filed |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Mysore
Computed across the 700+ Mysore projects on ReraGenie, from their own filings.
Keep SHREE ENCLAVE MYSORE (iT PARK) 5 on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near Mysore700+ in Mysore
Construction of 2446 Dus at Mandakalli Mysore
MCC
Construction of 1440 houses at lalithadripura
City Corporation Myuru
Construction of 843 G+2 Houses
Chief Officer
JAL VAYU TOWERS
AIR FORCE NAVAL HOUSING BOARD
Sanaklp Temple Tree
Sankalp Constructions private limited
SANKALP CROWN PHASE 1
SANKALP CONSTRUCTIONS PRIVATE LIMITED
See every Mysore project, with the district possession charts
Builder: ESS AND ESS INFRASTRUCTURE PRIVATE LIMITED
ESS AND ESS INFRASTRUCTURE PRIVATE LIMITED has 25 registrations on RERA Karnataka, including SHREE ENCLAVE MYSORE (iT PARK) 5 and JSS 4TH SAGE BLOCK B. Its filings declare 84 earlier projects, 37 of them declared completed. Litigation is declared on 6 of its registrations. Read the full track record. See more projects on the Mysore district page.
Frequently asked questions
What are my rights if SHREE ENCLAVE MYSORE (iT PARK) 5 is delayed beyond 16 Sep 2026?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, at the rate the state's RERA rules prescribe, or exit and claim a full refund with interest. Claims are filed as complaints with RERA Karnataka.
How do I verify and contact the developer of SHREE ENCLAVE MYSORE (iT PARK) 5?
The registered promoter entity is ESS AND ESS INFRASTRUCTURE PRIVATE LIMITED, a company as per the filing. Its CIN U70101KA2005PTC037964 can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's RERA Karnataka listing and in its filed documents.
Is my payment protected in SHREE ENCLAVE MYSORE (iT PARK) 5?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
Who certifies construction progress at SHREE ENCLAVE MYSORE (iT PARK) 5?
The professionals named in the filing: Engineer: C B Lakshman Rao; Chartered Accountant: A Vishwanatha. Their certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in SHREE ENCLAVE MYSORE (iT PARK) 5?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area; that the agreement follows the model agreement under the state's RERA rules, with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters.