ReraGenieLog inGet a buyer report

Home / Browse projects / Mysore, Karnataka / SHREE ENCLAVE MYSORE (iT PARK) 5

Registration approved No litigation declared Plotted Development project

SHREE ENCLAVE MYSORE (iT PARK) 5

By ESS AND ESS INFRASTRUCTURE PRIVATE LIMITED

RG-KA-84813 · RERA PRM/KA/RERA/1268/378/PR/020323/005758 · Last updated on RERA Karnataka portal: 15 Oct 2026

Source: official RERA Karnataka filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • Separate project account declared
Sep 2026Possession promisedno revision filed
0Complaints at RERA Karnatakaon this registration
Jump to the 100 documents Report an error

SHREE ENCLAVE MYSORE (iT PARK) 5 is a Plotted Development project by ESS AND ESS INFRASTRUCTURE PRIVATE LIMITED in Mysore, Karnataka, registered with RERA Karnataka as PRM/KA/RERA/1268/378/PR/020323/005758 on 2 Mar 2023. Possession is promised by 16 Sep 2026.

At a glance

Project

  • NameSHREE ENCLAVE MYSORE (iT PARK) 5
  • TypePlotted Development
  • Location
    • MYSORE
  • PincodeNot stated
  • RERA no.PRM/KA/RERA/1268/378/PR/020323/005758
  • ReraGenie IDRG-KA-84813

Builder

  • NameESS AND ESS INFRASTRUCTURE PRIVATE LIMITED
  • Entity typeCompany
  • CINU70101KA2005PTC037964
  • Authorized SignatoryShreekaanth Daas
  • Managing DirectorShreekaanth Daas
  • DirectorsShreekaanth Daas, Prathibha B
  • Project HeadShreekaanth Daas
  • Other registrations24 more →
  • Declared earlier projects84 →

Key dates

this monthRegisteredMar 2023PromisedSep 2026

Key facts

Registration and timeline

  • StatusRegistration approved
  • Registered on2 Mar 2023
  • Promised completion16 Sep 2026
  • Revised completionNone
  • BuildingsNot stated in filing
  • Documents filed100 files

Current status

22.1%Of the estimated cost spent so far

Figures as on 15 Oct 2026, this project's latest RERA Karnataka filing.

The full filing

Everything below is from the project's own RERA Karnataka filing, free to read.

Land and ownership2

This page carries no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Named landowners2
LandownerVillageDistrict
Sri SM Darshan--
Sri Shreekaanth Daas The Director for Ess and Ess Infrastructure Pvt.Ltd--

Project account and cost

70 percent of buyer money must sit in the project account, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Estimated costRs 1.97 cr
Cost incurredRs 43.58 lakh
Spent of the estimate22.1%
Cost lineEstimatedIncurred
Estimated Cost of Construction as certified by EngineerRs 1.08 crRs 16.04 lakh
On-site expenditure-Salaries of workersRs 43.38 lakhRs 19.07 lakh
On-site expenditure-Site OverheadRs 35.49 lakhRs 8.32 lakh
On-site expenditure-Cost Of Services(Water, Electricity, Sewage)Rs 5.91 lakhRs 13,976
On-site expenditure-Consultants FeesRs 3.94 lakh-

Certifying professionals and partners2

Certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
EngineerC B Lakshman Rao
Chartered AccountantA Vishwanatha

Complaints filed with RERA Karnataka

No complaints on record against this registration.

Documents filed100

As listed on the registration, under the names the promoter filed them with; the newest 80 of 100 are shown. The files themselves are available at source: search the registration number PRM/KA/RERA/1268/378/PR/020323/005758 on the RERA Karnataka portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Q2 2026-27 Form-4 Certificate issued by Chartered AccountantFile: 1 Certificate Issued by Chartered Accountant Form 4.PDF15 Oct 2026
Q2 2026-27 Form-6 Certificate issued by Structural EngineerFile: 2 Certificate Issued by Engineer Form 6.PDF15 Oct 2026
Q2 2026-27 Engineering Department (PWD) for completion of development works15 Oct 2026
Q2 2026-27 Horticulture department15 Oct 2026
Q1 2026-27 Form-4 Certificate issued by Chartered AccountantFile: 1 Certificate issued by Chartered Account Form 4.PDF14 Jul 2026
Q1 2026-27 Form-6 Certificate issued by Structural EngineerFile: 2 Certificate Issued by Engineer Form 6.PDF14 Jul 2026
Q1 2026-27 Horticulture department14 Jul 2026
Q4 2025-26 Form-4 Certificate issued by Chartered AccountantFile: 1 Certificate issued by Chartered Account Form 4.PDF15 Apr 2026
Q4 2025-26 Form-6 Certificate issued by Structural EngineerFile: 2 Certificate Issued by Engineer Form 6.PDF15 Apr 2026
Q4 2025-26 Horticulture department15 Apr 2026
Q3 2025-26 Form-4 Certificate issued by Chartered AccountantFile: 1 Certificate issued by Chartered Account Form 4.PDF13 Jan 2026
Q3 2025-26 Form-6 Certificate issued by Structural EngineerFile: 2 Certificate Issued by Engineer Form 6.PDF13 Jan 2026
Q3 2025-26 Horticulture department13 Jan 2026
Query & ReplyFile: Query & Reply.pdf27 Feb 2023
1. Certified Copy obtained by the concerned Sub-registrar regarding value of the property on the basFile: 1 Certified Copy of Guidance Value.pdf27 Feb 2023
2. Hissa Pody Copy has been Uploaded.File: 2 Hissa Pody Copy.pdf27 Feb 2023
3. Project Status fromFile: 3 Project Status Updated.pdf27 Feb 2023
4. Estimated cost of construction for civil works certified by the Engineer has been Uploaded.File: 4 Estimated Cost of Construction Certified by the Engineer.PDF27 Feb 2023
5. Proforma of Allotment Letter (Declaration)File: 5 Proforma of Allotment Letter (Declaration).PDF27 Feb 2023
6. The STP/Septic Tank, Soak pit and sewer line demarcation drawing has been Uploaded.File: 6 Demarcated drawing of STP, Soak Pit & Sewer Line.pdf27 Feb 2023
RTC, survey 200/3-
Mutation, survey 200/3-
Encumbrance Certificate, survey 200/3-
Conversion/Alienation Order, survey 200/3-
Sale/Title/Gift Deed, survey 200/3-
JDA, survey 200/3-
Khatha, survey 200/3-
RTC, survey 201/1-
Mutation, survey 201/1-
Encumbrance Certificate, survey 201/1-
Conversion/Alienation Order, survey 201/1-
Sale/Title/Gift Deed, survey 201/1-
Khatha, survey 201/1-
Registration CertificateFile: Registration Certificate.pdf-
Organization StructureFile: Organisation Structure.pdf-
Certificate issued by CA Form 1File: Form 1 - Certificate issued by Chartered Account.pdf-
Certificate issued by Engineer Form 3File: Engineer Certificate Form 3.PDF-
Project Chartered Accountant-
Project Engineer-
AffidavitFile: No Case Affidavit.PDF-
Certificate from Chartered AccountFile: Form 1 - Certificate issued by Chartered Account.pdf-
Balance Sheet 2021 - 2022File: 1 Balance Sheet FY 2021-22.pdf-
Balance Sheet 2020 - 2021File: 1 Balance Sheet FY 2020-21.pdf-
Balance Sheet 2019 - 2020File: 1 Balance Sheet FY 2019-20.pdf-
Audited Profit and Loss Statement 2021 - 2022File: 2 Profit and Loss Statement FY 2021-22.pdf-
Audited Profit and Loss Statement 2020 - 2021File: 2 Profit and Loss Account Fy 2020-21.pdf-
Audited Profit and Loss Statement 2019 - 2020File: 2 Profit and Loss Statement FY 2019-20.pdf-
Director's Report 2021 - 2022File: 3 Directors Report FY 2021-22.pdf-
Director's Report 2020 - 2021File: 3 Directors Report FY 2020-21.pdf-
Director's Report 2019 - 2020File: 3 Directors Report FY 2019-20.pdf-
Cash Flow Statement 2021 - 2022File: 4 Cash Flow Statement FY 2021-22.pdf-
Cash Flow Statement 2020 - 2021File: 4 Cash Flow Statement FY 2020-21.pdf-
Auditor's Report 2021 - 2022File: 5 Auditors Report FY 2021-22.pdf-
Auditor's Report 2020 - 2021File: 5 Auditors Report FY 2020-21.pdf-
Auditor's Report 2019 - 2020File: 5 Auditors Report FY 2019-20.pdf-
Income Tax Return Acknowledgement 2021 - 2022File: 6 Income Tax Return Acknowledgement FY 2021-22.pdf-
Income Tax Return Acknowledgement 2020 - 2021File: 6 Income Tax Return Acknowledgement FY 2020-21.pdf-
Income Tax Return Acknowledgement 2019 - 2020File: 6 Income Tax Return Acknowledgement FY 2019-20.pdf-
PLAN APPROVAL LETTER-
CESCOM NOC along with the receipt-
KUWS&DB NOC-
Approved Plan-
Approved Plan-
Approved Plan-
Approved Plan-
Signed Project Specifications along with Project Name and Address-
Approved Plan-
Demarcated Plan-
ADVOCATE TITLE SEARCH-
Conversion Order-
Tittle Deeds of all Survey Numbers-
Proforma of Agreement for Sale-
Allotment letter-
Brochure-
FORM B-
AFFIDAVIT 3(1)-
Joint Affidavit Cum Declaration-
CESCOM NOC along with the receipt-
KUWS&DB NOC-
Unnamed document-

Promoter's earlier projects40

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

27 not delivered by the promised date4 under way, not due yet31 declared completed, no finish date filed
ProjectLocationStatusPromisedDelivered
JSS 4TH SAGE BLOCK BMadapura Village and Aragowdanahalli Village, Varuna Hobli, Mysore Taluk,OngoingJun 2028Not due yet
AmruthasagaraHuyilalu village, Ilwala Hobli, Mysore Taluk & Mysore DistrictOngoingNov 2027Not due yet
JSS 4TH STAGE BLOCK AMadapura Village, Varuna Hobli, Mysuru Taluk & Mysuru DistrictOngoingMar 2027Not due yet
SREE SAPTHAMATHRUKA 5 & NANDI NAGARAMadapura Village, Varuna Hobli, Mysuru Taluk & Mysuru DistrictOngoingOct 2026Not due yet
KUBERANANDHASAGARA 12BMaidanahalli Village, Ilwala Hobli, Mysore Taluk & Mysore DistrictOngoingJun 2026Not delivered
SAHA GRANDEURMaidanahalli Village , Ilwala Hobli, Mysore TalukOngoingJun 2026Not delivered
Sree Sapthamathruka 1BMadapura Village, Varuna Hobli, Mysuru Taluk & Mysuru DistrictOngoingDec 2025Not delivered
Kuberanandhasagara Layout Phase 8Maidhanahalli Village, Ilwala Hobli, Mysore Taluk, Mysore DistrictOngoingMay 2025Not delivered
Kuberanandhasagara Layout Phase 3Maidhanahalli Village, Ilwala Hobli, Mysore Taluk, Mysore DistrictOngoingMay 2025Not delivered
Kuberanandhasagara Layout Phase 2Maidhanahalli Village, Ilwala Hobli, Mysore Taluk, Mysore DistrictOngoingMay 2025Not delivered
Kuberanandhasagara Layout Phase 1Maidhanahalli Village, Ilwala Hobli, Mysore Taluk, Mysore DistrictOngoingMay 2025Not delivered
Kuberanandhasagara Layout 11Maidhanahalli Village, Ilwala Hobli, Mysore Taluk, Mysore DistrictOngoingMay 2025Not delivered
Kuberanandhasagara Layout 10Maidhanahalli Village, Ilwala Hobli, Mysore Taluk, Mysore DistrictOngoingMay 2025Not delivered
Athmanandhasagara Layout Phase 4Nagawala Village, Ilwala Hobli, Mysore Taluk, Mysore DistrictOngoingMay 2025Not delivered
Athmanandhasagara Layout Phase 3Nagawala Village, Ilwala Hobli, Mysore Taluk, Mysore DistrictOngoingMay 2025Not delivered
Athmanandhasagara Layout Phase 2Nagawala Village, Ilwala Hobli, Mysore Taluk, Mysore DistrictOngoingMay 2025Not delivered
Athmanandhasagara Layout Phase 1Nagawala Village, Ilwala Hobli, Mysore Taluk, Mysore DistrictOngoingMay 2025Not delivered
Athmanandhasagara 5CNagawala Village , Ilwala Hobli , Mysuru Taluk,OngoingDec 2024Not delivered
Athmanandhasagara 5BNagawala Village , Ilwala Hobli , Mysuru Taluk,OngoingDec 2024Not delivered
Athmanandhasagara 5ANagawala Village, Ilwala Hobli, Mysore Taluk, Mysore DistrictOngoingDec 2024Not delivered
Shreesha Hill View Layout Phase 3Sarkari Utthanahalli Village, Varuna Hobli, Mysore Taluk and Mysore DistrictOngoingJan 2023Not delivered
Shreesha Hill View Layout Phase 2Sarkari Utthanahalli Village, Varuna Hobli, Mysore Taluk and Mysore DistrictOngoingJan 2023Not delivered
Athmanandhasgara 6Nagawala Village, Ilwala Hobli, Mysore Taluk, Mysore DistrictOngoingJun 2022Not delivered
Stavya LayoutHuyilalu Village, Ilawala Hobli, Mysore Taluk and Mysore DistrictOngoingMay 2022Not delivered
Sree Sapthamathruka Layout Phase 4Marashettihalli Village, Varuna Hobli, Mysore Taluk, Mysore DistrictOngoingMay 2022Not delivered
Paramanandhasagara and Sukhanandhasagara Layout Phase 1Huyilalu Village, Ilawala Hobli, Mysore Taluk and Mysore DistrictOngoingMay 2022Not delivered
Paramanandhasagara Layout Phase 2Huyilalu village, Ilwala hobli,, Mysore taluk & districtOngoingMay 2022Not delivered
Nithyanandhasagara Layout Phase 3Huyilalu Village, Ilawala Hobli, Mysore Taluk and Mysore DistrictOngoingMay 2022Not delivered
Nithyanandhasagara Layout Phase 2Huyilalu Village, Ilawala Hobli, Mysore Taluk and Mysore DistrictOngoingMay 2022Not delivered
Nithyanandhasagara Layout Phase 1Huyilalu Village, Ilawala Hobli, Mysore Taluk and Mysore DistrictOngoingMay 2022Not delivered
Sukhanandhasagara 4Bommanhalli Village, Ilawala Hobli, Mysore Taluk & Mysore DistrictOngoingApr 2022Not delivered
Venkatagiri LayoutGoruru Village, Kasaba Hobli, Mysore Taluk, Mysore DistrictCompleted-No date filed
Venkatadri LayoutBelawadi Village, Ilawala Hobli, Mysore Taluk and Mysore DistrictCompleted-No date filed
Svasthi RetreatMarashettihalli Village, Varuna Hobli, Mysuru Taluk & Mysuru DistrictCompleted-No date filed
Sree Sapthamathruka Layout Phase 3Yandahalli & Madapura Village, Varuna Hobli, Mysore Taluk and Mysore DistrictCompleted-No date filed
Sree Sapthamathruka Layout Phase 2Yandahalli & Madapura Village, Varuna Hobli, Mysore Taluk and Mysore DistrictCompleted-No date filed
Sree Sapthamathruka Layout Phase 1/AYandahalli Village, Varuna Hobli, Mysore Taluk and Mysore DistrictCompleted-No date filed
Sree Sapthamathruka Layout Phase 1Yandahalli Village, Varuna Hobli, Mysore Taluk and Mysore DistrictCompleted-No date filed
Sree Sapthamathruka 6Janthagalli Village, Varuna Hobli, Mysuru Taluk & Mysuru DistrictCompleted-No date filed
Sourish LayoutMadagalli Village, Ilawala Hobli, Mysore Taluk and Mysore DistrictCompleted-No date filed

How this compares with Mysore

28%of Mysore projects moved their completion datethis one has not
0%of Mysore registrations are shown as withdrawn or revokedthis one is not

Computed across the 700+ Mysore projects on ReraGenie, from their own filings.

Keep SHREE ENCLAVE MYSORE (iT PARK) 5 on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

Other projects near Mysore700+ in Mysore

Builder: ESS AND ESS INFRASTRUCTURE PRIVATE LIMITED

ESS AND ESS INFRASTRUCTURE PRIVATE LIMITED has 25 registrations on RERA Karnataka, including SHREE ENCLAVE MYSORE (iT PARK) 5 and JSS 4TH SAGE BLOCK B. Its filings declare 84 earlier projects, 37 of them declared completed. Litigation is declared on 6 of its registrations. Read the full track record. See more projects on the Mysore district page.

Frequently asked questions

What are my rights if SHREE ENCLAVE MYSORE (iT PARK) 5 is delayed beyond 16 Sep 2026?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, at the rate the state's RERA rules prescribe, or exit and claim a full refund with interest. Claims are filed as complaints with RERA Karnataka.

How do I verify and contact the developer of SHREE ENCLAVE MYSORE (iT PARK) 5?

The registered promoter entity is ESS AND ESS INFRASTRUCTURE PRIVATE LIMITED, a company as per the filing. Its CIN U70101KA2005PTC037964 can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's RERA Karnataka listing and in its filed documents.

Is my payment protected in SHREE ENCLAVE MYSORE (iT PARK) 5?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

Who certifies construction progress at SHREE ENCLAVE MYSORE (iT PARK) 5?

The professionals named in the filing: Engineer: C B Lakshman Rao; Chartered Accountant: A Vishwanatha. Their certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in SHREE ENCLAVE MYSORE (iT PARK) 5?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area; that the agreement follows the model agreement under the state's RERA rules, with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on RERA Karnataka, and we read every report.

Report an error Share feedback

Report an error or share feedback

About SHREE ENCLAVE MYSORE (iT PARK) 5. Everything on this page comes from what the promoter filed on RERA Karnataka, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save SHREE ENCLAVE MYSORE (iT PARK) 5 to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.