Home / Browse projects / Aurangabad, Maharashtra / SHREE BALAJI HEIGHTS

Registered No litigation declared Others project

SHREE BALAJI HEIGHTS

By ARJUN NITIN PATIL

RG-MH-74797 · RERA P51500055587 · Last updated on MahaRERA portal: 18 Apr 2026

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form

Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against every project registered within 2 km.

See what the report covers Free either way: or have every new Aurangabad registration emailed to you, free during the pilot beta.
Mar 2028Possession promisedno revision filed
12 of 33Construction stages doneacross 3 buildings; furthest along: Staircases, 70%
0Complaints at MahaRERAon this registration
Jump to the 76 documents Report an error

SHREE BALAJI HEIGHTS is a Others project by ARJUN NITIN PATIL in Aurangabad, Maharashtra, registered with MahaRERA as P51500055587 on 4 Apr 2024. Possession is promised by 31 Mar 2028.

At a glance

Project

  • NameSHREE BALAJI HEIGHTS
  • TypeOthers
  • Location
    • GOKUL SWEET TO SHIVAJI NAGAR ROAD
    • RAJMATA JIJAU HOUSING SOCIETY
    • GARKHEDA AURANGABAD
    • Aurangabad (M Corp.)
    • Aurangabad
    • 431009
  • Pincode431009
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51500055587
  • ReraGenie IDRG-MH-74797

Builder

  • NameARJUN NITIN PATIL
  • Entity typeIndividual

Key dates

this monthRegisteredApr 2024PromisedMar 2028

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on4 Apr 2024
  • Promised completion31 Mar 2028
  • Revised completionNone
  • Buildings3 building records
  • Documents filed76 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
WING ANA88000
WING BNA80000
WING CNA80000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building3

As on 18 Apr 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

12 of 33 construction stages are filed complete across 3 buildings. The stage furthest along is Staircases, at 70%.

WING A46%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises40%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks70%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
WING B46%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises40%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks70%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
WING C46%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises40%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks70%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 18 Apr 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsNoNot applicable
Landscaping & Tree PlantingNoNot applicable
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes0%
Energy managemcntYes0%
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Parking filed20

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots20
Closed/Covered20
BuildingClosed/CoveredTotal
WING A66
WING B88
WING C66

Land and ownership

MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area1,071 sq m
Land owned byThe promoter
Named landownersNone

Approvals and building plan

Permissible FSI3341.84
Proposed, not sanctioned3,342 sq m
Buildings approved3
Buildings sanctioned3

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchCITY SURVEY NO 14478 HALL NO 02, NEAR KALASH MANGAL KARYALAYA , OSMANPURA, CH SAMBHAJINAGAR-431 001

Certifying professionals and partners7

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectPRAMOD NARALE
EngineerCORE CONSULTANT
EngineerNiranjan Mule
EngineerADITYA KHARE
Chartered AccountantCA VISHWAS SOMVANSHI
Chartered AccountantVISHWAS SARJERAO SOMVANSHI
Chartered AccountantCA KEDAR JOSHI
PartnerRole in project
ARJUN NITIN PATIL-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 27 Jan 2024
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 30 Jan 2024
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 7 Dec 2023
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 7 Dec 2023Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Mar 2028

Documents filed76

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Form 1File: FORM-1.pdf18 Apr 2026
Form 2File: FORM-2.pdf18 Apr 2026
Form 3File: FORM-3.pdf18 Apr 2026
Disclosure of Sold and Booked InventoryFile: Sold unsold Inventory.pdf18 Apr 2026
Form 1File: Architech Cereficat Q1.pdf15 Apr 2026
Form 2File: Engineer Form 2 Cereficate.pdf15 Apr 2026
Form 3File: From 3 Scan Copy.pdf15 Apr 2026
Disclosure of Sold and Booked InventoryFile: Sold Unsold InventoryQ1.pdf15 Apr 2026
Form 1File: Architech Cereficat Form 1 Q-2.pdf15 Apr 2026
Form 2File: ENGINEERS CERTIFICATE Form 2 Q2.pdf15 Apr 2026
Form 3File: Form 3 Scan copy.pdf15 Apr 2026
Disclosure of Sold and Booked InventoryFile: Sold Unsold Inventory.pdf15 Apr 2026
Form 1File: Architect Certificate Form 1.pdf15 Apr 2026
Form 2File: Engineer Certificate Form 2.pdf15 Apr 2026
Form 3File: Form 3.pdf15 Apr 2026
Disclosure of Sold and Booked InventoryFile: Sold Unsold Inventory Q3 Scan Copy.pdf15 Apr 2026
Form 1File: form no 01-ARCHITECTS CERTIFICATE.pdf15 Apr 2026
Form 2File: FORM NO 02-ENGINEERS CERTIFICATE.pdf15 Apr 2026
Form 3File: Form 3 FINAL.pdf15 Apr 2026
Disclosure of Sold and Booked InventoryFile: Sold Unsold Inventory.pdf15 Apr 2026
Form 1File: Form 1.pdf14 Jan 2026
Form 2File: Form 2.pdf14 Jan 2026
Form 3File: FORM 3 Scan Copy.pdf14 Jan 2026
Disclosure of Sold and Booked InventoryFile: Sold Unsold Inventory Q 3 Scan Copy.pdf14 Jan 2026
Form 2A (FY 2024-2025)File: FORM 2A As Per Rera Side.pdf2 Dec 2025
Form 5 (FY 2024-2025)File: FORM 5.pdf25 Nov 2025
Form 1File: Form 1.pdf18 Oct 2025
Form 2File: Form 2.pdf18 Oct 2025
Form 3File: Form 3.pdf18 Oct 2025
Disclosure of Sold and Booked InventoryFile: Sold Unsold Inventory Q 2.pdf18 Oct 2025
Form 1File: Form 1.pdf20 Jul 2025
Form 2File: Form 2.pdf20 Jul 2025
Form 3File: Form3.pdf20 Jul 2025
Disclosure of Sold and Booked InventoryFile: Stock Inventory.pdf20 Jul 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: form no 01-ARCHITECTS CERTIFICATE.pdf20 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 FINAL.pdf20 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2A.pdf20 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ENGINEER'S CERTIFICATE.pdf20 Apr 2025
Disclosure of sold/ booked inventoryFile: Sold Unsold Inventory.pdf20 Apr 2025
Disclosure of sold/ booked inventoryFile: Meghdoot Realities Letter.pdf20 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3.pdf17 Jan 2025
Disclosure of sold/ booked inventoryFile: Sold Unsold Inventory.pdf17 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate.pdf13 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Certificate.pdf13 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architech Cereficat Q-2.pdf25 Dec 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ENGINEER'S CERTIFICATE-Q2.pdf25 Dec 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Scan copy.pdf17 Dec 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: From 3.pdf16 Dec 2024
Details of encumbrances concerned to FinanceFile: Details of encumbrances concerned to finances.pdf9 Dec 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architech Cereficat Q1.pdf9 Dec 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Form 2 Cereficate.pdf9 Dec 2024
Disclosure of sold/ booked inventoryFile: Sold Unsold InventoryQ1.pdf9 Dec 2024
Details of encumbrances concerned to LegalFile: Details of encumbrances concerned to finances.pdf9 Dec 2024
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: 9 Bank Declaration.pdf21 Mar 2024
CERSAI detailsFile: 5CERSAI Search Report.pdf26 Feb 2024
CERSAI detailsFile: 5 Cersai Declaration.pdf26 Feb 2024
Proforma of Agreement for saleFile: Agreement To Sale NEW 11zon.pdf26 Feb 2024
Proforma of Allotment letterFile: Model form of allotment letter_11zon.pdf18 Feb 2024
Details of encumbrances concerned to FinanceFile: 1a 1b mrged finance and legal.pdf7 Feb 2024
Details of encumbrances concerned to LegalFile: 1a 1b mrged finance and legal.pdf7 Feb 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM3 CA CERTIFICATE_11zon.pdf7 Feb 2024
Other - TechnicalFile: Declaration Regrading Sanction Floors.pdf3 Feb 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: 8INTEREST IN OTHER REAL ESTATE PROJECT.pdf2 Feb 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: ANNEXURE 'A'.pdf2 Feb 2024
Layout approvalFile: Layout copy FINAL.pdf30 Jan 2024
Copy of Layout Approval (in case of layout)File: Layout copy FINAL.pdf30 Jan 2024
Other - TechnicalFile: screenshot for email send to maharera authority.pdf30 Jan 2024
Declaration about Commencement CertificateFile: 3 Declaration about Commencement Certificate FORMAT Form_D.pdf29 Jan 2024
Declaration in FORM BFile: Form B Affidavit Cum Declaration on Bond.pdf29 Jan 2024
Deviation Report with respect to Allotment letterFile: 6Deviation Report with respect to Allotment letter.pdf29 Jan 2024
Deviation Report with respect to model copy of AgreementFile: 7Deviation in the Agreement to sale Format.pdf29 Jan 2024
Copy of the legal title reportFile: LEGAL TITLE REPORT_11zon.pdf27 Jan 2024
Building plan approvalFile: BUILDING PLAN FINAL1.pdf7 Dec 2023
PAN CardFile: 1-PAN CARD.pdf7 Dec 2023
Building Plan Approval / NA Order for plotted developmentFile: BUILDING PLAN FINAL1.pdf7 Dec 2023
Commencement Certificates / NA Order for plotted developmentFile: COMMENCEMENT CERTIFICATE.pdf7 Dec 2023

How this compares with Aurangabad

14%of Aurangabad projects moved their completion datethis one has not
32%of Aurangabad registrations have lapsed or been cancelledthis one is on the register

Computed across the 1,400+ Aurangabad projects on ReraGenie, from their own filings.

Keep SHREE BALAJI HEIGHTS on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near RAJMATA JIJAU HOUSING SOCIETY , GARKHEDA AURANGABAD1,400+ in Aurangabad

2 kmSHREE BALAJI HEIGHTSCompleted 14Lapsed / revoked 10Other 17Dot size: filed unitsN

Filed coordinates, straight-line distance. 41 registered projects within 2 km.

Builder: ARJUN NITIN PATIL

ARJUN NITIN PATIL has 1 registration on MahaRERA, including SHREE BALAJI HEIGHTS. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Aurangabad district page.

Frequently asked questions

What are my rights if SHREE BALAJI HEIGHTS is delayed beyond 31 Mar 2028?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of SHREE BALAJI HEIGHTS?

The registered promoter entity is ARJUN NITIN PATIL, an individual as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in SHREE BALAJI HEIGHTS?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for SHREE BALAJI HEIGHTS?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at SHREE BALAJI HEIGHTS?

The professionals named in the filing: Architect: PRAMOD NARALE; Engineer: CORE CONSULTANT; Engineer: Niranjan Mule; Engineer: ADITYA KHARE; Chartered Accountant: CA VISHWAS SOMVANSHI; Chartered Accountant: VISHWAS SARJERAO SOMVANSHI. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in SHREE BALAJI HEIGHTS?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About SHREE BALAJI HEIGHTS. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save SHREE BALAJI HEIGHTS to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.