SHREE AANGAN - A WING
RG-MH-07189 · RERA P52000054469 · Last updated on MahaRERA portal: 27 Apr 2026
Source: official MahaRERA filing
Or get an email each time it changes, with the project watch
Red flags
- No red flags in this filing
Clear
- No litigation declared
- No complaints on record
- Completion date never moved
- No encumbrance on the project land
- Separate project account declared
- Allotment letter follows the model form
Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against every project registered within 2 km.
See what the report covers Free either way: or have every new Raigarh registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
SHREE AANGAN - A WING is a Residential / Group Housing project by SHIV CREATORS LLP in Raigarh, Maharashtra, registered with MahaRERA as P52000054469 on 25 Jan 2024. Possession is promised by 31 Dec 2027. 41 of the 89 units on this registration are recorded sold or booked, and 4 of 11 construction stages are filed complete.
At a glance
Project
- NameSHREE AANGAN - A WING
- TypeResidential / Group Housing
- Location
- SURVEY NO 23/5
- MOHOPADA
- Talegaon
- Khalapur
- Raigarh
- 410222
- Pincode410222
- MapView location on Google Maps (as filed on RERA)
- RERA no.P52000054469
- ReraGenie IDRG-MH-07189
Builder
- NameSHIV CREATORS LLP
- Entity typePartnership
- PartnersHEMANT MOHANLAL DIWANI, SANDEEP NAMDEV KADGE, ARVINDBHAI CHHAGANBHAI PATEL, PRAVINBHAI MAVJI CHOPRA, SACHIN BALIRAM JADHAV
Key dates
Key facts
Registration and timeline
- StatusRegistered
- Registered on25 Jan 2024
- Promised completion31 Dec 2027
- Revised completionNone
- Buildings1 building record
- Documents filed84 files
Current status
Figures as on 27 Apr 2026, this project's latest MahaRERA filing.
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| A WING | NA | 14 | 13 | 89 | 0 | 89 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building1
As on 27 Apr 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
4 of 11 construction stages are filed complete. The stage furthest along is Internal walls, at 35%.
A WING: 40% average across the applicable activities
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 0% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 35% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
Progress on shared amenities15
As on 27 Apr 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | Yes | 0% |
| Water Supply | Yes | 0% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 0% |
| Storm Water Drains | Yes | 0% |
| Landscaping & Tree Planting | Yes | 0% |
| Street Lighting | Yes | 0% |
| Community Buildings | No | Not applicable |
| Treatment And Disposal Of Sewage And Sullage Water | No | Not applicable |
| Solid Waste Management And Disposal | No | Not applicable |
| Water conservation /Rain water harvesting | Yes | 0% |
| Energy managemcnt | Yes | 0% |
| Fire protection and fire safety requirements | Yes | 0% |
| Electrical meter room, sub-station, receiving station | Yes | 0% |
| Aggregate area of recreational Open Space | No | Not applicable |
| Open Parking | Yes | 0% |
Parking filed69
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
Land and ownership
Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
| Building | Wing | Estimated | Incurred |
|---|---|---|---|
| A WING | NA | Rs 11.01 cr | Rs 6.99 cr |
| - | NA | Rs 78.00 lakh | - |
Certifying professionals and partners4
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | ANIL HASTIMAL SAKARIA |
| Engineer | VIJAY KUMAR SINGH KUMAR SINGH |
| Chartered Accountant | PATEL SENGHANI AND PARVADIYA |
| Chartered Accountant | R. D. Patel & Co |
| Partner | Role in project |
|---|---|
| SHIV CREATORS LLP | - |
Complaints filed with MahaRERA
No complaints on record against this registration.
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 29 Nov 2023 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 30 Nov 2023 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 12 Dec 2023 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 30 Nov 2023Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateNot due yet
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
possession is promised for 31 Dec 2027
Documents filed84
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 84 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Withdrawal Update Form 1File: Form 1.pdf | 27 Apr 2026 |
| Withdrawal Update Form 2File: Form 2.pdf | 27 Apr 2026 |
| Withdrawal Update Form 3File: Shiv Creators LLP_Form 3_Q4.pdf | 27 Apr 2026 |
| Withdrawal Update Form 1File: Form 1.pdf | 30 Jan 2026 |
| Withdrawal Update Form 2File: form2 Dec 2025.pdf | 30 Jan 2026 |
| Withdrawal Update Form 3File: Shiv Creator LLP Form 3 Q3.pdf | 30 Jan 2026 |
| Withdrawal Update Form 1File: Form 1.pdf | 21 Jan 2026 |
| Withdrawal Update Form 2File: form2 Sep 2025.pdf | 21 Jan 2026 |
| Withdrawal Update Form 3File: Shiv Creator LLP Form 3 Q2.pdf | 21 Jan 2026 |
| Form 5 (FY 2023-2024)File: Form 5 _AUDIT_Shree Aangan A Wing_ Worki_23-24V1.pdf | 20 Nov 2025 |
| Form 1File: Form 1.pdf | 4 Oct 2025 |
| Form 2File: form2 March 2025.pdf | 4 Oct 2025 |
| Form 3File: Shiv Form 3 for 24-25 Q4.pdf | 4 Oct 2025 |
| Disclosure of Sold and Booked InventoryFile: Disclosure of Sold -Booked Inventory Mar 25.pdf | 4 Oct 2025 |
| Withdrawal Update Form 1File: Shiv Creators LLP_Form 1.pdf | 4 Oct 2025 |
| Withdrawal Update Form 2File: Shiv Creators LLP_Form 2.pdf | 4 Oct 2025 |
| Withdrawal Update Form 3File: Shiv Creators LLP Form 3 Q1 Signed C.pdf | 4 Oct 2025 |
| Form 5 (FY 2024-2025)File: Shiv Creators LLP_Form 5_2024-25.pdf | 30 Sep 2025 |
| Form 1File: Form 1.pdf | 24 Sep 2025 |
| Form 2File: form2 SEP 2024.pdf | 24 Sep 2025 |
| Form 3File: Form 3_Q2.pdf | 24 Sep 2025 |
| Disclosure of Sold and Booked InventoryFile: 5 Disclosure of sold_ booked inventory.pdf | 24 Sep 2025 |
| Form 1File: 4 Architect’s Certificate of Percentage of Completion of Work (Form 1) (2).pdf | 24 Sep 2025 |
| Form 2File: 3 Engineer’s Certificate on Cost Incurred on Project (Form 2) (1).pdf | 24 Sep 2025 |
| Form 3File: Form 3_Q1_C.pdf | 24 Sep 2025 |
| Disclosure of Sold and Booked InventoryFile: Shiv_Circular No 29 Sold Unsold Invetory_Q1.pdf | 24 Sep 2025 |
| Form 1File: 6 Architect’s Certificate of Percentage of Completion of Work (Form 1).pdf | 23 Sep 2025 |
| Form 2File: 3 Engineer’s Certificate on Cost Incurred on Project (Form 2).pdf | 23 Sep 2025 |
| Form 3File: 3 CA Certificate on Project Cost & Fund withdrawal (Form 3).pdf | 23 Sep 2025 |
| Disclosure of Sold and Booked InventoryFile: 3 Disclosure of sold_ booked inventory.pdf | 23 Sep 2025 |
| Form 1File: 2 Architect’s Certificate of Percentage of Completion of Work (Form 1).pdf | 23 Sep 2025 |
| Form 2File: 2 Engineer’s Certificate on Cost Incurred on Project (Form 2).pdf | 23 Sep 2025 |
| Form 3File: 2 CA Certificate on Project Cost & Fund withdrawal (Form 3).pdf | 23 Sep 2025 |
| Disclosure of Sold and Booked InventoryFile: 2 Disclosure of sold_ booked inventory.pdf | 23 Sep 2025 |
| Disclosure of sold/ booked inventoryFile: Shiv creator LLP unsold inventory 2025.pdf | 21 Feb 2025 |
| Disclosure of sold/ booked inventoryFile: Shiv creator LLP unsold inventory 2025_Q2.pdf | 21 Feb 2025 |
| Disclosure of sold/ booked inventoryFile: Shiv_Circular No 29 Sold Unsold Invetory.pdf | 21 Feb 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form-1.pdf | 18 Feb 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1.pdf | 18 Feb 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1.pdf | 18 Feb 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3_Q1_C.pdf | 18 Feb 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3_Q2_C.pdf | 18 Feb 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 _Q3_C.pdf | 18 Feb 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: form2 JUNE 2024.pdf | 18 Feb 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: form2 SEP 2024.pdf | 18 Feb 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2.pdf | 18 Feb 2025 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Form 5 _AUDIT_Shree Aangan A Wing_ Worki_23-24V1.pdf | 5 Dec 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form - 1.pdf | 20 Jun 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Form - 2A.pdf | 20 Jun 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Shiv 310324.pdf | 22 Apr 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Shiv 310324.pdf | 22 Apr 2024 |
| Disclosure of sold/ booked inventoryFile: Inventory Status Shiv 310324.pdf | 22 Apr 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Shiv 310324.pdf | 22 Apr 2024 |
| Other - LegalFile: Mail Proof.pdf | 6 Jan 2024 |
| Proforma of Agreement for saleFile: RERA AFS_New Draft.pdf | 28 Dec 2023 |
| Building plan approvalFile: AMINETY AREA 5.pdf | 12 Dec 2023 |
| Building Plan Approval / NA Order for plotted developmentFile: AMINETY AREA 5.pdf | 12 Dec 2023 |
| Layout approvalFile: LAYOUT PLAN 1.pdf | 30 Nov 2023 |
| Layout approvalFile: SERVICES LAYOUT 2.pdf | 30 Nov 2023 |
| Building plan approvalFile: LAYOUT PLAN 3.pdf | 30 Nov 2023 |
| Building plan approvalFile: LAYOUT PLAN 4.pdf | 30 Nov 2023 |
| Building plan approvalFile: LAYOUT PLAN 4.pdf | 30 Nov 2023 |
| Copy of Layout Approval (in case of layout)File: LAYOUT PLAN 1.pdf | 30 Nov 2023 |
| Copy of Layout Approval (in case of layout)File: SERVICES LAYOUT 2.pdf | 30 Nov 2023 |
| Building Plan Approval / NA Order for plotted developmentFile: LAYOUT PLAN 3.pdf | 30 Nov 2023 |
| Building Plan Approval / NA Order for plotted developmentFile: LAYOUT PLAN 4.pdf | 30 Nov 2023 |
| Building Plan Approval / NA Order for plotted developmentFile: LAYOUT PLAN 4.pdf | 30 Nov 2023 |
| Commencement Certificates / NA Order for plotted developmentFile: CC.pdf | 30 Nov 2023 |
| Copy of the legal title reportFile: Legal Title Report_compressed.pdf | 29 Nov 2023 |
| Declaration in FORM BFile: Form B.pdf | 29 Nov 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM3.pdf | 29 Nov 2023 |
| Proforma of Allotment letterFile: Rera Allotment Letter.pdf | 29 Nov 2023 |
| PAN CardFile: Shiv Creators LLP_PAN.pdf | 28 Nov 2023 |
| Details of encumbrances concerned to FinanceFile: Encumbarance Letter.pdf | 28 Nov 2023 |
| Details of encumbrances concerned to LegalFile: Encumbarance Letter.pdf | 28 Nov 2023 |
| Declaration about Commencement CertificateFile: Decleration of CC.pdf | 28 Nov 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM-1.pdf | 28 Nov 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM-2.pdf | 28 Nov 2023 |
| Disclosure of sold/ booked inventoryFile: Sold Unsold Inventory.pdf | 28 Nov 2023 |
| CERSAI detailsFile: declaration of cersai.pdf | 28 Nov 2023 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Raigarh
Computed across the 5,900+ Raigarh projects on ReraGenie, from their own filings.
Free monthly report: Navi Mumbai and Raigad on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Built from this project's filings on the day you order, in plain language.
- Red flags and clear checks, the possession story, sanctions and sales, land and title, who you are dealing with
- Joined against every project registered within 2 km, which the RERA portal never shows together
- All 84 filed documents as one ZIP, foldered, with a manifest
- The project watch below, included free for 90 days
Project watch
Only want to be told when something changes?
- An email each time this filing moves: new sales, a moved possession date, an extension, a complaint, the occupancy certificate
- Plain words, conditions that have happened marked in red
- A summary of everything that changed when the 90 days end
Keep SHREE AANGAN - A WING on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near MOHOPADA5,900+ in Raigarh
Filed coordinates, straight-line distance. 15 registered projects within 2 km.
MASS DREAM CITY
Mass Developers
Greenfield
Persipina Developers Private Limited
Grandstand
Persipina Developers Private Limited
Olympus
Persipina Developers Private Limited
RIYASAT BLISS
Riyasat Infra Developers Private Limited
DWARIKA MAJESTICA
NAMASTEY GROUP
See every Raigarh project, with the district possession charts
Builder: SHIV CREATORS LLP
SHIV CREATORS LLP has 1 registration on MahaRERA, including SHREE AANGAN - A WING. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Raigarh district page.
Frequently asked questions
What are my rights if SHREE AANGAN - A WING is delayed beyond 31 Dec 2027?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of SHREE AANGAN - A WING?
The registered promoter entity is SHIV CREATORS LLP, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in SHREE AANGAN - A WING?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How current is the construction progress shown for SHREE AANGAN - A WING?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at SHREE AANGAN - A WING?
The professionals named in the filing: Architect: ANIL HASTIMAL SAKARIA; Engineer: VIJAY KUMAR SINGH KUMAR SINGH; Chartered Accountant: PATEL SENGHANI AND PARVADIYA; Chartered Accountant: R. D. Patel & Co. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in SHREE AANGAN - A WING?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback