SHRADDHA AUTUMN PARK

By ATHARVA DEVELOPERS

RG-MH-24129 · RERA P51800007651 · Last updated on MahaRERA portal: 11 Jul 2026

Source: official MahaRERA filing

Red flags

  • 1 complaint at MahaRERA
  • Completion date moved by 72 months
  • 1 extension taken

Clear

  • No litigation declared
  • Separate project account declared
  • Allotment letter follows the model form

3 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Mumbai Suburban registration emailed to you, free during the pilot beta.
Dec 2027Possession promisedmoved 72 months from the original
45 of 55Construction stages doneacross 5 buildings; furthest along: Installation of Lifts, 50%
1Complaints at MahaRERAon this registration
Jump to the 96 documents Report an error

SHRADDHA AUTUMN PARK is a Residential / Group Housing project by ATHARVA DEVELOPERS in Mumbai Suburban, Maharashtra, registered with MahaRERA as P51800007651 on 17 Aug 2017. Possession is promised by 31 Dec 2027. The completion date has moved by 72 months from the original filing. 1 complaint is on record with the regulator.

At a glance

Project

  • NameSHRADDHA AUTUMN PARK
  • TypeResidential / Group Housing
  • Location
    • TILAK ROAD
    • Kurla
    • Mumbai Suburban
    • 400042
  • Pincode400042
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51800007651
  • ReraGenie IDRG-MH-24129

Builder

  • NameATHARVA DEVELOPERS
  • Entity typePartnership
  • Other registrations20 more →
  • Completed2 of 21
  • No longer live16 lapsed, de-registered or revoked
  • Declared earlier projects4 →

Key dates

this monthRegisteredAug 2017First promiseDec 2021Revised toDec 2027

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on17 Aug 2017
  • Promised completion31 Dec 2027
  • Revised completionRevised to 31 Dec 2027 (originally 30 Dec 2021)
  • Buildings5 building records
  • Documents filed96 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
BUILDING NO 1NA250000
BUILDING NO 2 WING ANA250000
BUILDING NO 2 WING B REHABNA250000
BUILDING NO 3 WING ANA240000
BUILDING NO 3 WING BNA250000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building5

As on 11 Jul 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

45 of 55 construction stages are filed complete across 5 buildings. The stage furthest along is Installation of Lifts, at 50%.

BUILDING NO 1100%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
BUILDING NO 2 WING A100%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
BUILDING NO 2 WING B REHAB100%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
BUILDING NO 3 WING A95%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.50%
BUILDING NO 3 WING B31%
ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor100%
Slabs of Super Structure50%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises25%
Sanitary Fittings within the flats / premises20%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks45%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities17

As on 11 Jul 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes75%
Water SupplyYes66%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes75%
Storm Water DrainsYes66%
Landscaping & Tree PlantingYes60%
Street LightingYes0%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes50%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes66%
Electrical meter room, sub-station, receiving stationYes80%
Aggregate area of recreational Open SpaceYes0%
Open ParkingYes0%
OTHER SOCIETY OFFICEYes100%
OTHER FITNESS CENTERYes100%

Parking filed93

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots93
Closed/Covered92
Open Space1
BuildingClosed/CoveredOpen SpaceTotal
BUILDING NO 117118
BUILDING NO 2 WING A47047
BUILDING NO 3 WING A14014
BUILDING NO 3 WING B14014

Land and ownership

MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area3,850 sq m
Land owned byThe promoter
Named landownersNone

Approvals and building plan

Sanctioning authoritySlum Rehabilitation Authority
Permissible FSI7139.74
Proposed, not sanctioned5,739 sq m
Buildings approved5
Buildings sanctioned5

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchRUPA PLAZA JAWAHAR ROAD PLOT TPS 1 GHATKOPAR E MUMBAI 400077

Certifying professionals and partners2

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
EngineerRajendra Bankar
Chartered AccountantN B Sayed & Associates
PartnerRole in project
ATHARVA DEVELOPERS-

Extensions applied for1

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EXT51800012104Dec 2021 → Dec 2027

Reason as filed by the promoterWe sincerely apologize for the delay in the project's completion and the submission of this request. The delay has been caused by challenges related to procurement, unforeseen site conditions, coordination issues, and temporary financial constraints. Despite these obstacles, we are making every effort to resolve these matters and finalize the remaining work. We are closely monitoring the progress and taking all necessary measures to ensure the timely completion of the project. As of now, building 1 and building 2 have been successfully completed, and we have obtained the Partial Occupancy Cert

Litigation declared2

CaseCourtStatus
Suit No 1511 of 2016/2016City Civil CourtNotice of Motion taken out by Plaintiff is pending for final hearing
Suit No 2196 of 2016/2016City Civil CourtNotice of Motion taken out by Plaintiff is pending for final hearing

Complaints filed with MahaRERA1

Case no.ComplainantRespondentFiled
CC006000000078653Santosh BhosaleM/s. Atharav Developers through Mr. Sudhir Mehta & others07/04/2019

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 26 Jul 2017
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 14 Feb 2025
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 14 Feb 2025
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 14 Feb 2025Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateOn the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    uploaded 24 Jun 2022

Documents filed96

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 96 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Form 2A (FY 2024-2025)File: FORM 2A FY 24-25 SHRADDHA AUTUMN PARK.pdf11 Jul 2026
Form 2A (FY 2025-2026)File: FORM 2A FY 25-26 SHRADDHA AUTUMN PARK.pdf11 Jul 2026
Form 5 (FY 2024-2025)File: Form 5 of Shraddha Autumn Park - FY 2024-25.pdf6 Jun 2026
Form 1File: Form 1 - Shraddha Autumn Park as on June 2025.pdf2 Jun 2026
Form 2File: Form 2 - Shraddha Autumn Park as on June 2025.pdf2 Jun 2026
Form 3File: Form 3 - Shraddha Autumn Park as on June 2025.pdf2 Jun 2026
Disclosure of Sold and Booked InventoryFile: Circular 29 - Shraddha Autumn Park as on June 2025.pdf2 Jun 2026
Form 1File: Form 1 - Shraddha Autumn Park as on Sept 2025.pdf2 Jun 2026
Form 2File: Form 2 - Shraddha Autumn Park as on Sept 2025.pdf2 Jun 2026
Form 3File: Form 3 - Shraddha Autumn Park as on 30-09-2025.pdf2 Jun 2026
Disclosure of Sold and Booked InventoryFile: Circular 29 - Shraddha Autumn Park as on 30-09-2025.pdf2 Jun 2026
Form 1File: Form 1 - Shraddha Autumn Park as on 31-03-2026.pdf15 May 2026
Form 2File: Form 2 of Shraddha Autumn Park as on 31-03-2026.pdf15 May 2026
Form 3File: Form 3 of Shraddha Autumn Park as on 31-03-2026.pdf15 May 2026
Disclosure of Sold and Booked InventoryFile: Circular 29 - Shraddha Autumn Park as on 31-03-2026.pdf15 May 2026
Form 1File: Form 1 - Shraddha Autumn Park as on Dec 2025.pdf13 May 2026
Form 2File: Form 2 - Shraddha Autumn Park as on Dec 2025.pdf13 May 2026
Form 3File: Form 3 - Shraddha Autumn Park as on Dec 2025.pdf13 May 2026
Disclosure of Sold and Booked InventoryFile: Circular 29 - Shraddha Autumn Park as on Dec 2025.pdf13 May 2026
Form 1File: Form 1 - Shraddha Autumn Park as on March 2025.pdf3 Sep 2025
Form 2File: Form 2 - Shraddha Autumn Park as on MARCH 2025.pdf3 Sep 2025
Form 3File: Form 3 - Shraddha Autumn Park as on MARCH 2025.pdf3 Sep 2025
Disclosure of Sold and Booked InventoryFile: Circular 29 - Shraddha Autumn Park as on MARCH 2025.pdf3 Sep 2025
Declaration in FORM BFile: FORM-B.pdf18 Mar 2025
Other - TechnicalFile: PERT Chart.pdf18 Mar 2025
Layout approvalFile: Plan - Shraddha Autumn Park 1.pdf14 Feb 2025
Building plan approvalFile: Plan - Shraddha Autumn Park 2.pdf14 Feb 2025
Building plan approvalFile: Plan - Shraddha Autumn Park 3.pdf14 Feb 2025
Building plan approvalFile: Plan - Shraddha Autumn Park 4.pdf14 Feb 2025
Building plan approvalFile: Plan - Shraddha Autumn Park 5.pdf14 Feb 2025
Building plan approvalFile: Plan - Shraddha Autumn Park 6.pdf14 Feb 2025
Building plan approvalFile: Plan - Shraddha Autumn Park 7.pdf14 Feb 2025
Building plan approvalFile: Plan - Shraddha Autumn Park 8.pdf14 Feb 2025
Building plan approvalFile: Plan - Shraddha Autumn Park 9.pdf14 Feb 2025
Building plan approvalFile: Plan - Shraddha Autumn Park 10.pdf14 Feb 2025
Copy of Layout Approval (in case of layout)File: Plan - Shraddha Autumn Park 1.pdf14 Feb 2025
Declaration in FORM BFile: FORM -B_.pdf14 Feb 2025
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 - Shraddha Autumn Park as on Dec 2024.pdf14 Feb 2025
Certificates of CA (Form 3)File: Form 3 - Shraddha Autumn Park as on 31-12-2024 New.pdf14 Feb 2025
Certificates of CA (Form 3)File: Form 3 - Shraddha Autumn Park as on Dec 2024.pdf14 Feb 2025
Certificates of CA (Form 3)File: 3 Certificates of CA (Form 3).pdf14 Feb 2025
Certificates of CA (Form 5)File: Form 5 of Shraddha Autumn Park - FY 2017-18.pdf14 Feb 2025
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 - Shraddha Autumn Park as on Dec 2024.pdf14 Feb 2025
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 - Shraddha Autumn Park as on Dec 2024.pdf14 Feb 2025
Commencement Certificates / NA Order for plotted developmentFile: CC - Shraddha Autumn Park.pdf14 Feb 2025
Building Plan Approval (IOD)File: Plan - Shraddha Autumn Park 9.pdf14 Feb 2025
Building Plan Approval (IOD)File: Plan - Shraddha Autumn Park 10.pdf14 Feb 2025
Building Plan Approval (IOD)File: Plan - Shraddha Autumn Park 8.pdf14 Feb 2025
Building Plan Approval (IOD)File: Plan - Shraddha Autumn Park 7.pdf14 Feb 2025
Building Plan Approval (IOD)File: Plan - Shraddha Autumn Park 5.pdf14 Feb 2025
Building Plan Approval (IOD)File: Plan - Shraddha Autumn Park 4.pdf14 Feb 2025
Building Plan Approval (IOD)File: Plan - Shraddha Autumn Park 3.pdf14 Feb 2025
Building Plan Approval (IOD)File: Plan - Shraddha Autumn Park 2.pdf14 Feb 2025
Building Plan Approval (IOD)File: Plan - Shraddha Autumn Park 6.pdf14 Feb 2025
Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)File: Form 5 of Shraddha Autumn Park - FY 2018-19.pdf14 Feb 2025
Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: Form 5 of Shraddha Autumn Park - FY 2019-20.pdf14 Feb 2025
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: Form 5 of Shraddha Autumn Park - FY 2020-21.pdf14 Feb 2025
Disclosure of sold/ booked inventoryFile: CIRCULAR 29.pdf14 Feb 2025
Declaration about Commencement CertificateFile: FORMAT D _.pdf14 Feb 2025
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: Form 5 of Shraddha Autumn Park - FY 2021-22.pdf14 Feb 2025
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Form 5 of Shraddha Autumn Park - FY 2022-23.pdf14 Feb 2025
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Form 5 of Shraddha Autumn Park - FY 2023-24.pdf14 Feb 2025
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 30-09-2024_11zon.pdf23 Oct 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: Form 2A 19-20.pdf23 Oct 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Form 2A 20-21.pdf23 Oct 2024
CERSAI detailsFile: DECLARATION of Cersai.pdf23 Oct 2024
Declaration about all RERA Designated Bank Accounts (Format A)File: Format A - Seperate Bank Account Details.pdf23 Oct 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: Form 2A 21-22.pdf23 Oct 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: Annexure A Format N.pdf23 Oct 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Form 2A 22-23.pdf23 Oct 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Form 2A 23-24.pdf23 Oct 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 - Shraddha Autumn Park as on June 2024.pdf17 Jul 2024
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: KANJUR MARG_OC_A_wing-1 (1).pdf24 Jun 2022
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: KANJUR MARG_OC_Bldg_1-1-2.pdf24 Jun 2022
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: KANJUR MARG_OC_A_wing-1-2.pdf24 Jun 2022
Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: FORM5_Atharva.pdf16 Jun 2021
Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)File: Atharva Developers.pdf6 Mar 2020
Certificates of CA (Form 5)File: FORM 5 - ATHARVA.pdf30 Mar 2019
Proforma of Allotment letterFile: AFS.pdf13 Feb 2018
Layout approvalFile: ATHARVA DEVELOPERS1.pdf31 Jul 2017

How this compares with Mumbai Suburban

33%of Mumbai Suburban projects moved their completion datethis one moved by 72 months
21%of Mumbai Suburban registrations have lapsed or been cancelledthis one is on the register

Computed across the 6,700+ Mumbai Suburban projects on ReraGenie, from their own filings.

Free monthly report: Mumbai on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep SHRADDHA AUTUMN PARK on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Kurla6,700+ in Mumbai Suburban

2 kmSHRADDHA AUTUMN PARKCompleted 39Lapsed / revoked 31Other 108Dot size: filed unitsN

Filed coordinates, straight-line distance. 178 registered projects within 2 km.

Builder: ATHARVA DEVELOPERS

ATHARVA DEVELOPERS has 21 registrations on MahaRERA, including SHWETA CHS and Atharva Heights. Its filings disclose 4 earlier MahaRERA projects: declares 2 of 4 past projects completed on time. Read the full track record. See more projects on the Mumbai Suburban district page.

Frequently asked questions

What are my rights if SHRADDHA AUTUMN PARK is delayed beyond 31 Dec 2027?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of SHRADDHA AUTUMN PARK?

The registered promoter entity is ATHARVA DEVELOPERS, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in SHRADDHA AUTUMN PARK?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How do I read the complaint cases filed against SHRADDHA AUTUMN PARK?

Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.

How current is the construction progress shown for SHRADDHA AUTUMN PARK?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at SHRADDHA AUTUMN PARK?

The professionals named in the filing: Engineer: Rajendra Bankar; Chartered Accountant: N B Sayed & Associates. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in SHRADDHA AUTUMN PARK?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About SHRADDHA AUTUMN PARK. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save SHRADDHA AUTUMN PARK to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.