Red flags
- Completion date moved by 57 months
- 2 extensions taken
Clear
- No litigation declared
- No complaints on record
- Separate project account declared
- Allotment letter follows the model form
2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.
See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
SHIVSAI RESIDANCY is a Others project by SHIVSAI RESIDANCY in Pune, Maharashtra, registered with MahaRERA as P52100018000 on 3 Oct 2018. Possession is promised by 30 Jan 2027. The completion date has moved by 57 months from the original filing.
At a glance
Project
- NameSHIVSAI RESIDANCY
- TypeOthers
- Location
- WADA ROAD
- KHED
- Rajgurunagar (CT)
- Pune
- 410505
- Pincode410505
- RERA no.P52100018000
- ReraGenie IDRG-MH-99879
Builder
- NameSHIVSAI RESIDANCY
- Entity typePartnership
- PartnersKISHOR KISAN MAVALE, OMKAR JITENDRA MAVALE
Key dates
Key facts
Registration and timeline
- StatusRegistered
- Registered on3 Oct 2018
- Promised completion30 Jan 2027
- Revised completionRevised to 30 Jan 2027 (originally 30 Apr 2022)
- Buildings3 building records
- Documents filed73 files
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| WING A | NA | 6 | 4 | 0 | 0 | 0 |
| WING B | NA | 6 | 4 | 0 | 0 | 0 |
| WING C | NA | 6 | 4 | 0 | 0 | 0 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building3
As on 8 May 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
18 of 33 construction stages are filed complete across 3 buildings. The stage furthest along is Internal walls, at 25%.
WING A73%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
WING B52%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 25% |
| Sanitary Fittings within the flats / premises | 25% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 25% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
WING C50%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 25% |
| Sanitary Fittings within the flats / premises | 25% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
Progress on shared amenities15
As on 8 May 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | No | Not applicable |
| Water Supply | Yes | 0% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 0% |
| Storm Water Drains | Yes | 0% |
| Landscaping & Tree Planting | No | Not applicable |
| Street Lighting | Yes | 0% |
| Community Buildings | No | Not applicable |
| Treatment And Disposal Of Sewage And Sullage Water | No | Not applicable |
| Solid Waste Management And Disposal | No | Not applicable |
| Water conservation /Rain water harvesting | Yes | 0% |
| Energy managemcnt | No | Not applicable |
| Fire protection and fire safety requirements | No | Not applicable |
| Electrical meter room, sub-station, receiving station | Yes | 0% |
| Aggregate area of recreational Open Space | No | Not applicable |
| Open Parking | No | Not applicable |
Parking filed3
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
| Building | Closed/Covered | Total |
|---|---|---|
| WING A | 1 | 1 |
| WING B | 1 | 1 |
| WING C | 1 | 1 |
Land and ownership1
MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.
| Landowner | Village | District |
|---|---|---|
| SHISAI RESIDANCY | Rajgurunagar (CT) | Pune |
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
Certifying professionals and partners3
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | SANTOSH RASKAR |
| Engineer | Satyavan Warude |
| Chartered Accountant | Bhushan Kohinkar |
| Partner | Role in project |
|---|---|
| SHIVSAI RESIDANCY | - |
Extensions applied for2
A revised date filed with the regulator does not change the possession date in your agreement for sale.
Reason as filed by the promoter1. Due to COVID-19 pandemic, the regular flow of work is hampered on account of unavailability of labour on regular basis 2. Lack of manpower and labour supply post covid time. Most of the North Indian labourers were away and hence we had a very bad time to re establish the work momentum.
Reason as filed by the promoterShortage of Funds due to low demand: The real estate project, situated in a remote area, has faced significant challenges due to limited customer bookings, resulting in a lower-than-anticipated response from prospective buyers. This lack of adequate buyer interest adversely impacted the financial inflow required for the timely completion of the project, as the anticipated funding from customer bookings could not be realized. Despite these challenges, the promoters have demonstrated unwavering commitment to the project's completion by arranging the necessary funds through the liquidation of per
Complaints filed with MahaRERA
No complaints on record against this registration.
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 22 Sep 2018 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 22 Sep 2018 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 22 Sep 2018 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 12 May 2023Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateNot due yet
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
possession is promised for 30 Jan 2027
Documents filed73
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Form 1File: FORM 1_ SEP 25_ SHIV SAI RESIDENCY.pdf | 8 May 2026 |
| Form 2File: FORM 2_ SEP 25_ SHIVSAI RESIDENCY.pdf | 8 May 2026 |
| Form 3File: FORM 3_ SEP 25_ SHIVSAI RESIDENCY.pdf | 8 May 2026 |
| Disclosure of Sold and Booked InventoryFile: SOLD UNSOLD_ SEP 25_ SHIVSAI RESIDENCY.pdf | 8 May 2026 |
| Form 1File: FORM 1_ DEC 25_ SHIVSAI RESIDENCY.pdf | 8 May 2026 |
| Form 2File: FORM 2_ DEC 25_ SHIVSAI RESIDENCY.pdf | 8 May 2026 |
| Form 3File: FORM 3_ DEC 25_ SHIV SAI RESIDENCY.pdf | 8 May 2026 |
| Disclosure of Sold and Booked InventoryFile: SOLD UNSOLD_ DEC 25_ SHIVSAI RESIDENCY.pdf | 8 May 2026 |
| Form 1File: FORM 1_ JUNE 25_ SHIVSAI RESIDENCY.pdf | 22 Jul 2025 |
| Form 2File: FORM 2_ JUNE 25_ SHIVSAI RESIDENCY.pdf | 22 Jul 2025 |
| Form 3File: FORM 3_ JUNE 25_ SHIVSAI RESIDENCY.pdf | 22 Jul 2025 |
| Disclosure of Sold and Booked InventoryFile: SOLD UNSOLD_ JUNE 25_ SHIV SAI RESIDENCY.pdf | 22 Jul 2025 |
| Certificates of CA (Form 3)File: FORM 3_ MARCH 25_ SHIVSAI RESIDENCY.pdf | 2 Jun 2025 |
| Disclosure for secured/unsecured finance availed for the projectFile: DECLARATION FOR DISCLOSURE.pdf | 2 Jun 2025 |
| Declaration in FORM BFile: 8 FORM B.pdf | 30 May 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1_Shivsai Residancy_SHIVSAI RESIDANCY_ MARCH 24.pdf | 30 May 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1_ MARCH 25_ SHIVSAI RESIDENCY.pdf | 30 May 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 1 FORM 1_ Shivsai Residancy_SHIVSAI RESIDANCY_DEC 24_compressed.pdf | 30 May 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1_ Shivsai Residancy_SHIVSAI RESIDANCY_SEP 24_compressed.pdf | 30 May 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1_ Shivsai Residancy_SHIVSAI RESIDANCY_JUNE 24.pdf | 30 May 2025 |
| Certificates of CA (Form 3)File: FORM 3_Shivsai Residancy_SHIVSAI RESIDANCY_ MARCH 24_compressed.pdf | 30 May 2025 |
| Certificates of CA (Form 3)File: FORM 3_ Shivsai Residancy_SHIVSAI RESIDANCY_JUNE 24_compressed.pdf | 30 May 2025 |
| Certificates of CA (Form 3)File: FORM 3_Shivsai Residancy_SHIVSAI RESIDANCY_ SEP 24.pdf | 30 May 2025 |
| Certificates of CA (Form 3)File: 3 FORM 3_ Shivsai Residancy_SHIVSAI RESIDANCY_DEC 24.pdf | 30 May 2025 |
| Certificates of CA (Form 3)File: FORM 3_ MARCH 25_ SHIVSAI RESIDENCY_compressed.pdf | 30 May 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2_Shivsai Residancy_SHIVSAI RESIDANCY_ MARCH 24.pdf | 30 May 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2_ Shivsai Residancy_SHIVSAI RESIDANCY_JUNE 24.pdf | 30 May 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2_ Shivsai Residancy_SHIVSAI RESIDANCY_SEP 24.pdf | 30 May 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 2 FORM 2_Shivsai Residancy_SHIVSAI RESIDANCY_ DEC 24.pdf | 30 May 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2_ MARCH 25_ SHIVSAI RESIDENCY.pdf | 30 May 2025 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: FORM 2A_ MARCH 20.pdf | 30 May 2025 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)File: 18-19.pdf | 30 May 2025 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: 19-20.pdf | 30 May 2025 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: 20-21.pdf | 30 May 2025 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: FORM 2A_ MARCH 21.pdf | 30 May 2025 |
| Disclosure of sold/ booked inventoryFile: SOLD UNSOLD_Shivsai Residancy_SHIVSAI RESIDANCY_MARCH 24_compressed.pdf | 30 May 2025 |
| Disclosure of sold/ booked inventoryFile: SOLD UNSOLD_ Shivsai Residancy_SHIVSAI RESIDANCY_JUNE 24_compressed.pdf | 30 May 2025 |
| Disclosure of sold/ booked inventoryFile: SOLD UNSOLD_Shivsai Residancy_SHIVSAI RESIDANCY_ SEP 24_compressed.pdf | 30 May 2025 |
| Disclosure of sold/ booked inventoryFile: 4 SOLD UNSOLD_ Shivsai Residancy_SHIVSAI RESIDANCY_DEC 24_compressed.pdf | 30 May 2025 |
| Disclosure of sold/ booked inventoryFile: SOLD UNSOLD_ MARCH 25.pdf | 30 May 2025 |
| Disclosure of sold/ booked inventoryFile: SOLD UNSOLD_ MARCH 25.pdf | 30 May 2025 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: FORM 2A_ MARCH 22.pdf | 30 May 2025 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: FORM 2A_ MARCH 23.pdf | 30 May 2025 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: FORM 5_ MARCH 23.pdf | 30 May 2025 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: FORM 2A_ MARCH 24.pdf | 30 May 2025 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: FORM 5_ MARCH 24.pdf | 30 May 2025 |
| Declaration in FORM BFile: Form B.pdf | 12 Jun 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate.pdf | 12 Jun 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Certificate.pdf | 12 Jun 2023 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: Form 2A (1).pdf | 12 Jun 2023 |
| Commencement Certificates / NA Order for plotted developmentFile: Renew CC.pdf | 12 May 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: RERA Audit Report FY 21-22 -.pdf | 3 Apr 2023 |
| Details of encumbrances concerned to FinanceFile: EC-Legal.pdf | 21 Mar 2023 |
| Details of encumbrances concerned to LegalFile: EC-Legal.pdf | 21 Mar 2023 |
| Declaration about Commencement CertificateFile: Form D.pdf | 21 Mar 2023 |
| Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Separate Bank.pdf | 21 Mar 2023 |
| Deviation Report with respect to Allotment letterFile: Deviation-Allotment.pdf | 21 Mar 2023 |
| Deviation Report with respect to model copy of AgreementFile: Deviation-AFS.pdf | 21 Mar 2023 |
| Disclosure of sold/ booked inventoryFile: Disclosure.pdf | 21 Feb 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)File: Shivsai residency (18-19).pdf | 21 Feb 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: Shivsai residency (19-20).pdf | 21 Feb 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: Shivsai residency (20-21).pdf | 21 Feb 2023 |
| Building plan approvalFile: Building Plan.pdf | 22 Sep 2018 |
| Layout approvalFile: Layout Plan.pdf | 22 Sep 2018 |
| PAN CardFile: shivsai pan no.pdf | 22 Sep 2018 |
| Copy of the legal title reportFile: Legal Title.pdf | 22 Sep 2018 |
| Details of encumbrancesFile: shivsai self declartion.pdf | 22 Sep 2018 |
| Copy of Layout Approval (in case of layout)File: Layout Plan.pdf | 22 Sep 2018 |
| Building Plan Approval (IOD)File: Building Plan.pdf | 22 Sep 2018 |
| Commencement Certificates / NA Order for plotted developmentFile: Commencemnt Certificate.pdf | 22 Sep 2018 |
| Declaration in FORM BFile: SHIVSAI R AFFIDIVIT.pdf | 22 Sep 2018 |
| Certificates of CA (Form 3)File: CA Certitificate Shivsai Residancy.pdf | 22 Sep 2018 |
| Proforma of Allotment letterFile: Agreement To Sales Proforma.pdf | 22 Sep 2018 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Pune
Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.
Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Built from this project's filings on the day you order, in plain language.
- 2 conditions on this project's record read and explained, with the clear checks alongside
- All 73 filed documents as one ZIP, foldered, with a manifest
- The project watch below, included free for 90 days
Project watch
Only want to be told when something changes?
- An email each time this filing moves: new sales, a moved possession date, an extension, a complaint, the occupancy certificate
- Plain words, conditions that have happened marked in red
- A summary of everything that changed when the 90 days end
Keep SHIVSAI RESIDANCY on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near KHED13,700+ in Pune
First City
Xrbia Developers Ltd
SURAJ EKYUM
SURAJ INFRA
Shankeshwar World
Nitin Chhaganlal Jain
Escape City Ph 1
Gajendra Patil , Pramod Patil , Vinod Pati
YESAI PARK
SIDDHIVINAYAK DEVELOPERS
Escape City Ph 2
Gajendra Patil , Pramod Patil , Vinod Pati
Builder: SHIVSAI RESIDANCY
SHIVSAI RESIDANCY has 1 registration on MahaRERA, including SHIVSAI RESIDANCY. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Pune district page.
Frequently asked questions
What are my rights if SHIVSAI RESIDANCY is delayed beyond 30 Jan 2027?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of SHIVSAI RESIDANCY?
The registered promoter entity is SHIVSAI RESIDANCY, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in SHIVSAI RESIDANCY?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How current is the construction progress shown for SHIVSAI RESIDANCY?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at SHIVSAI RESIDANCY?
The professionals named in the filing: Architect: SANTOSH RASKAR; Engineer: Satyavan Warude; Chartered Accountant: Bhushan Kohinkar. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in SHIVSAI RESIDANCY?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback