Completed No litigation declared Residential / Group Housing project

SHIVAY CONSTRUCTION

By Shivay Construction

RG-MH-38416 · RERA P52100049999 · Last updated on MahaRERA portal: 27 May 2026

Source: official MahaRERA filing

Red flags

  • Completion date moved by 6 months
  • 1 extension taken

Clear

  • No litigation declared
  • No complaints on record
  • Separate project account declared
  • Allotment letter follows the model form
  • Recorded completed on MahaRERA

2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.
Dec 2025Possession promisedregistration recorded completed
11 of 11Construction stages doneevery applicable stage filed complete
36 of 68Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 208 documents Report an error

SHIVAY CONSTRUCTION is a Residential / Group Housing project by Shivay Construction in Pune, Maharashtra, registered with MahaRERA as P52100049999 on 6 Mar 2023. The registration is recorded completed; possession was promised by 31 Dec 2025. The completion date has moved by 6 months from the original filing. 32 of the 68 units on this registration are recorded sold or booked, and 11 of 11 construction stages are filed complete.

At a glance

Project

  • NameSHIVAY CONSTRUCTION
  • TypeResidential / Group Housing
  • Location
    • AMBEGAON BUDRUK
    • AMBEGAON BK
    • Haveli
    • Pune
    • 411046
  • Pincode411046
  • RERA no.P52100049999
  • ReraGenie IDRG-MH-38416

Builder

  • NameShivay Construction
  • Entity typeOthers
  • Named personsGanesh Tukaram Khade, Ankush Mahadev Khopade, Nanda Ankush Khopade, Gajrabai Shivaji Shete, Dhananjay Shivaji Shete

Key dates

this monthRegisteredMar 2023First promiseJun 2025Revised toDec 2025Recorded completed

Key facts

Registration and timeline

  • StatusCompleted
  • Registered on6 Mar 2023
  • Promised completion31 Dec 2025
  • Revised completionRevised to 31 Dec 2025 (originally 30 Jun 2025)
  • Buildings1 building record
  • Documents filed208 files

Current status

47%32 of 68 units booked
93.3%Work done, per cost certificate

Figures as on 27 May 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
SHIVAY CONSTRUCTIONNA6666268

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 27 May 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

11 of 11 construction stages are filed complete.

SHIVAY CONSTRUCTION: 100% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Progress on shared amenities15

As on 27 May 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes100%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsYes100%
Landscaping & Tree PlantingYes100%
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes100%
Energy managemcntYes100%
Fire protection and fire safety requirementsYes100%
Electrical meter room, sub-station, receiving stationYes100%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Land and ownership5

MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area1,340 sq m
Land owned byThe promoter, with other names on the file
Named landowners5
LandownerVillageDistrict
GANESH TUKARAM KHADEPune (M Corp.)Pune
ANKUSH MAHADU KHOPADEPune (M Corp.)Pune
NANDA ANKUSH KHOPADEPune (M Corp.)Pune
GAJRABAI SHIVAJI SHETEPune (M Corp.)Pune
DHANANJAY SHIVAJI SHETEPune (M Corp.)Pune

Approvals and building plan

Sanctioning authorityPune Municipal Corporation
Permissible FSI3470.97
Proposed, not sanctioned3,471 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchMARKET YARD PUNE 411043
Estimated costRs 9.45 cr
Cost incurredRs 8.82 cr
Work done93.29%
BuildingWingEstimatedIncurred
SHIVAY CONSTRUCTIONNARs 9.25 crRs 8.70 cr
-NARs 20.12 lakhRs 12.07 lakh

Certifying professionals and partners5

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectRUSHIKESH G ZAGADE
EngineerRUSHIKESH ZAGADE
EngineerABHIJEET NAVPUTE
Chartered AccountantSACHIN RASKAR Bhagwan Raskar
Chartered AccountantGIRISH BHANDWALKAR Suresh Bhandwalkar
PartnerRole in project
Shivay Construction-

Extensions applied for1

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EA28082502456Jun 2025 → Dec 2025

Reason as filed by the promoterThe project was initially sanctioned for 44 residential units and 4 commercial shops, aggregating to 48 units with a total built-up area of 2,358.35 sq. mtrs. Subsequently, the project scope was revised through two sanctioned modifications. The first revision enhanced the configuration to 57 residential units and 4 commercial shops (total 61 units, built-up area 3,016.58 sq. mtrs.), while the second revision further expanded it to 66 residential units and 2 commercial shops, aggregating to 68 units with a built-up area of 3,469.02 sq. mtrs. We respectfully submit that the delay in completion,

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 6 Aug 2022
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 6 Aug 2022
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 6 Aug 2022
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 7 Jul 2022Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot on the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

Documents filed208

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 208 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Occupational CertificateFile: Shivay Completion.pdf27 May 2026
Occupational CertificateFile: Form 2A.pdf27 May 2026
Occupational CertificateFile: Form 4.pdf27 May 2026
Occupational CertificateFile: Sanction Plan_11zon.pdf27 May 2026
Withdrawal Update Form 1File: Form-01.pdf29 Apr 2026
Withdrawal Update Form 2File: Form-02.pdf29 Apr 2026
Withdrawal Update Form 3File: Form-03.pdf29 Apr 2026
Withdrawal Update Form 1File: Form 1 Scan Copy.pdf22 Apr 2026
Withdrawal Update Form 2File: Form 2 Scan Copy.pdf22 Apr 2026
Withdrawal Update Form 3File: Form 3 Scan Copy.pdf22 Apr 2026
Withdrawal Update Form 1File: Form 1.pdf28 Aug 2025
Withdrawal Update Form 2File: Form 2.pdf28 Aug 2025
Withdrawal Update Form 3File: Form 3_11zon.pdf28 Aug 2025
Withdrawal Update Form 1File: FORM 1.pdf25 Aug 2025
Withdrawal Update Form 1File: FORM 1 Q1.pdf25 Aug 2025
Withdrawal Update Form 1File: FORM 1 Q2.pdf25 Aug 2025
Withdrawal Update Form 1File: FORM 1 Q3.pdf25 Aug 2025
Withdrawal Update Form 1File: FORM -1 Q-4.pdf25 Aug 2025
Withdrawal Update Form 1File: Form 1.pdf25 Aug 2025
Withdrawal Update Form 1File: Form 1.pdf25 Aug 2025
Withdrawal Update Form 1File: Form 1.pdf25 Aug 2025
Withdrawal Update Form 1File: Form 1.pdf25 Aug 2025
Withdrawal Update Form 2File: FORM 2.pdf25 Aug 2025
Withdrawal Update Form 2File: FORM 2 Q2.pdf25 Aug 2025
Withdrawal Update Form 2File: FORM 2 Q2.pdf25 Aug 2025
Withdrawal Update Form 2File: FORM 2 Q3.pdf25 Aug 2025
Withdrawal Update Form 2File: FORM 2 Q3.pdf25 Aug 2025
Withdrawal Update Form 2File: Form 2.pdf25 Aug 2025
Withdrawal Update Form 2File: Form 2.pdf25 Aug 2025
Withdrawal Update Form 2File: Form 2.pdf25 Aug 2025
Withdrawal Update Form 2File: Form 2.pdf25 Aug 2025
Withdrawal Update Form 3File: FORM 3.pdf25 Aug 2025
Withdrawal Update Form 3File: FORM 3.pdf25 Aug 2025
Withdrawal Update Form 3File: FORM 3.pdf25 Aug 2025
Withdrawal Update Form 3File: FORM 2 Q3.pdf25 Aug 2025
Withdrawal Update Form 3File: Form 3_11zon.pdf25 Aug 2025
Withdrawal Update Form 3File: Form 3.pdf25 Aug 2025
Withdrawal Update Form 3File: Form 3.pdf25 Aug 2025
Withdrawal Update Form 3File: Form 3.pdf25 Aug 2025
Withdrawal Update Form 3File: Form 3.pdf25 Aug 2025
Form 2A (FY 2024-2025)File: 2A New Format.pdf20 Aug 2025
Form 5 (FY 2024-2025)File: Form 5 FY 2024-25.pdf18 Aug 2025
Form 1File: Form 1.pdf14 Aug 2025
Form 2File: Form 2.pdf14 Aug 2025
Form 3File: Form 3.pdf14 Aug 2025
Disclosure of Sold and Booked InventoryFile: Disclosure of Inventory.pdf14 Aug 2025
OthersFile: CERSAI.pdf14 Aug 2025
Form 1File: Form 1.pdf14 Aug 2025
Form 2File: Form 2.pdf14 Aug 2025
Form 3File: Form 3.pdf14 Aug 2025
Disclosure of Sold and Booked InventoryFile: Disclosure of Inventory.pdf14 Aug 2025
OthersFile: CERSAI.pdf14 Aug 2025
Form 1File: Form 1.pdf14 Aug 2025
Form 2File: Form 2.pdf14 Aug 2025
Form 3File: Form 3.pdf14 Aug 2025
Disclosure of Sold and Booked InventoryFile: Disclosure of Inventory.pdf14 Aug 2025
OthersFile: Cersai.pdf14 Aug 2025
Form 1File: Form 1.pdf14 Aug 2025
Form 2File: Form 2.pdf14 Aug 2025
Form 3File: Form 3.pdf14 Aug 2025
Disclosure of Sold and Booked InventoryFile: Disclosure of Inventory.pdf14 Aug 2025
OthersFile: CERSAI.pdf14 Aug 2025
Form 1File: FORM -1 Q-4.pdf14 Aug 2025
Form 2File: FORM -2 Q-4.pdf14 Aug 2025
Form 3File: Form 3_11zon.pdf14 Aug 2025
Disclosure of Sold and Booked InventoryFile: Discolsure of Sold Booked Inventory.pdf14 Aug 2025
OthersFile: CERSAI.pdf14 Aug 2025
Form 1File: FORM 1 Q3.pdf14 Aug 2025
Form 2File: FORM 2 Q3.pdf14 Aug 2025
Form 3File: FORM 3.pdf14 Aug 2025
Disclosure of Sold and Booked InventoryFile: Inventoy.pdf14 Aug 2025
OthersFile: Cersai.pdf14 Aug 2025
Form 1File: FORM 1 Q2.pdf14 Aug 2025
Form 2File: FORM 2 Q2.pdf14 Aug 2025
Form 3File: FORM 3.pdf14 Aug 2025
Disclosure of Sold and Booked InventoryFile: Inventoy.pdf14 Aug 2025
OthersFile: Cersai.pdf14 Aug 2025
Form 1File: FORM 1 Q1.pdf14 Aug 2025
Form 2File: FORM 2 Q2.pdf14 Aug 2025
Form 3File: FORM 3.pdf14 Aug 2025

How this compares with Pune

47%of this project is bookeddistrict median 31%
26%of Pune projects moved their completion datethis one moved by 6 months
26%of Pune registrations have lapsed or been cancelledthis one is completed

Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.

Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep SHIVAY CONSTRUCTION on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near AMBEGAON BK13,700+ in Pune

Builder: Shivay Construction

Shivay Construction has 1 registration on MahaRERA, including SHIVAY CONSTRUCTION. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Pune district page.

Frequently asked questions

What are my rights if SHIVAY CONSTRUCTION is delayed beyond 31 Dec 2025?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of SHIVAY CONSTRUCTION?

The registered promoter entity is Shivay Construction, an others as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in SHIVAY CONSTRUCTION?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for SHIVAY CONSTRUCTION?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at SHIVAY CONSTRUCTION?

The professionals named in the filing: Architect: RUSHIKESH G ZAGADE; Engineer: RUSHIKESH ZAGADE; Engineer: ABHIJEET NAVPUTE; Chartered Accountant: SACHIN RASKAR Bhagwan Raskar; Chartered Accountant: GIRISH BHANDWALKAR Suresh Bhandwalkar. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in SHIVAY CONSTRUCTION?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About SHIVAY CONSTRUCTION. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save SHIVAY CONSTRUCTION to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.