Home / Browse projects / Sangli, Maharashtra / SHIVAM CAMPUS

Registration lapsed No litigation declared Others project

SHIVAM CAMPUS

By SHIVAMDEVELOPERS

RG-MH-16989 · RERA P53100027502 · Last updated on MahaRERA portal: 18 Jun 2025

Source: official MahaRERA filing

Red flags

  • Registration lapsed
  • Possession 4 months past the filed date
  • Completion date moved by 24 months
  • 1 extension taken

Clear

  • No litigation declared
  • No complaints on record
  • Separate project account declared
  • Allotment letter follows the model form
  • All 1 earlier projects delivered on promise

4 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Sangli registration emailed to you, free during the pilot beta.
Jun 2026Possession promised4 months past this date
15 of 22Construction stages doneacross 2 buildings; furthest along: Internal walls, 95%
0Complaints at MahaRERAon this registration
Jump to the 102 documents Report an error

SHIVAM CAMPUS is a Others project by SHIVAMDEVELOPERS in Sangli, Maharashtra, registered with MahaRERA as P53100027502 on 14 Dec 2020. Possession was promised by 30 Jun 2026 and is now 4 months past that date. The completion date has moved by 24 months from the original filing.

At a glance

Project

  • NameSHIVAM CAMPUS
  • TypeOthers
  • Location
    • DHAMANI ROAD
    • NEAR MAHESHWARI GARDEN SFURTI CHOUCK
    • Sangli Miraj Kupwad (M Corp.)
    • Miraj
    • Sangli
    • 416415
  • Pincode416415
  • RERA no.P53100027502
  • ReraGenie IDRG-MH-16989

Builder

  • NameSHIVAMDEVELOPERS
  • Entity typePartnership
  • Other registrations1 more →
  • Completed1 of 2
  • No longer live1 lapsed, de-registered or revoked
  • Declared earlier projects1 →

Key dates

4 months past promisethis monthRegisteredDec 2020First promiseJun 2024Revised toJun 2026

Key facts

Registration and timeline

  • StatusRegistration lapsed
  • Registered on14 Dec 2020
  • Promised completion30 Jun 2026
  • Revised completionRevised to 30 Jun 2026 (originally 30 Jun 2024)
  • Buildings2 building records
  • Documents filed102 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
SHIVAM CAMPUS BUILDING ANA70000
SHIVAM CAMPUS BUILDING BNA60000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building2

As on 18 Jun 2025, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

15 of 22 construction stages are filed complete across 2 buildings. The stage furthest along is Internal walls, at 95%.

SHIVAM CAMPUS BUILDING A83%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises95%
Sanitary Fittings within the flats / premises80%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks85%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.85%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.70%
SHIVAM CAMPUS BUILDING B91%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Progress on shared amenities15

As on 18 Jun 2025, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes75%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes75%
Storm Water DrainsYes75%
Landscaping & Tree PlantingYes0%
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes75%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsNoNot applicable
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Parking filed67

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots67
Closed/Covered46
Open Space21
BuildingClosed/CoveredOpen SpaceTotal
SHIVAM CAMPUS BUILDING A212142
SHIVAM CAMPUS BUILDING B25025

Land and ownership

MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area1,282 sq m
Land owned byThe promoter
Named landownersNone

Approvals and building plan

Permissible FSI1794.98
Proposed, not sanctioned1,795 sq m
Buildings approved2
Buildings sanctioned2

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchC S NO 13501 SANGLI MIRAJ ROAD SANGLI

Certifying professionals and partners3

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectAR VIVEK DESHPANDE
EngineerMr Pritam Dattatray Shinde
Chartered AccountantMr Shriniwas N Bhosale
PartnerRole in project
SHIVAMDEVELOPERS-

Extensions applied for1

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EXT53100018718Jun 2024 → Jun 2026

Reason as filed by the promotershivam campus wing B IS COMPLETED. but shivam campus wing A takan revised sanction also now booking is slow so required extension for wing A

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 7 Dec 2020
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 9 Dec 2020
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 14 Oct 2023
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 14 Oct 2023Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateOn the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    uploaded 1 Nov 2023

Documents filed102

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 102 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architects Certificate Form 1.pdf18 Jun 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Certificate.pdf18 Jun 2025
Disclosure of sold/ booked inventoryFile: Wing A Sold Inventory.pdf18 Jun 2025
Disclosure of sold/ booked inventoryFile: disclosure of sold inventory B wing.pdf18 Jun 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Architecture form-2A.pdf18 Jun 2025
Annual Audit Report of Statutory CA (Form 5) (FY 2024-25)File: Ca Certificate Form- 5.pdf18 Jun 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: campus architecture certificate.pdf3 Feb 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: campus CA Certificate.pdf3 Feb 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: campus engineer certificate.pdf3 Feb 2025
Disclosure of sold/ booked inventoryFile: campus disclosure of sold unit (1).pdf3 Feb 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: campus Form 2A.pdf3 Feb 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1.pdf6 Nov 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3.pdf6 Nov 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2.pdf6 Nov 2024
Disclosure of sold/ booked inventoryFile: DISCLOSURE OF SOLD A AND B WING.pdf6 Nov 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1.pdf19 Oct 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 31 03 2024.pdf19 Oct 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3.pdf19 Oct 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 31 03 2024.pdf19 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2.pdf19 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 31 03 2024.pdf19 Oct 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: FORM 2 A.pdf19 Oct 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: FORM 5 23 TO 24.pdf19 Oct 2024
Disclosure of sold/ booked inventoryFile: DISCLOSURE OF SOLD A B WING.pdf18 Oct 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: FORM -2A.pdf29 Mar 2024
Declaration in FORM BFile: FORM B.pdf11 Mar 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1.pdf11 Mar 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2.pdf11 Mar 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: FORM 2 A.pdf11 Mar 2024
Disclosure of sold/ booked inventoryFile: SOLD UNSOLD WING A SHIVAM CAMPUS 31122023.pdf11 Mar 2024
Disclosure of sold/ booked inventoryFile: SOLD UNSOLD WING B SHIVAM CAMPUS 31122023.pdf11 Mar 2024
CERSAI detailsFile: CERSAI UNDERTAKING.pdf11 Mar 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3.pdf11 Mar 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: DISCLOSURE OF INTEREST IN OTHER REAL ESTATE ORG SACHIN SANKPAL.pdf11 Mar 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: DISCLOSURE OF INTEREST IN OTHER REAL ESTATE ORG D B SHINDE.pdf11 Mar 2024
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: FORMAT A SEPARATE BANK AC.pdf11 Mar 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 - 30062023.pdf8 Jan 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 - 06102023.pdf8 Jan 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2.pdf8 Jan 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 - 30062023.pdf8 Jan 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 - 30092023.pdf8 Jan 2024
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: COMPLITION CERTIFICATE.pdf1 Nov 2023
Building plan approvalFile: DRG NEW MD1.pdf14 Oct 2023
Building plan approvalFile: DRG NEW MD2.pdf14 Oct 2023
Building Plan Approval / NA Order for plotted developmentFile: DRG NEW MD1.pdf14 Oct 2023
Building Plan Approval / NA Order for plotted developmentFile: DRG NEW MD2.pdf14 Oct 2023
Commencement Certificates / NA Order for plotted developmentFile: BANDHKAM PARVANA REVISED.pdf14 Oct 2023
Disclosure of sold/ booked inventoryFile: disclosure of sold 01042021.pdf14 Oct 2023
Disclosure of sold/ booked inventoryFile: disclosure of sold.pdf14 Oct 2023
Disclosure of sold/ booked inventoryFile: discolsure of sold - 05042021.pdf4 Oct 2023
Disclosure of sold/ booked inventoryFile: disclosure of sold -05072021.pdf4 Oct 2023
Disclosure of sold/ booked inventoryFile: discolsure of sold - 10102021.pdf4 Oct 2023
Disclosure of sold/ booked inventoryFile: disclosure of sold - 09032021.pdf4 Oct 2023
Disclosure of sold/ booked inventoryFile: disclosure of sold - 04042022.pdf4 Oct 2023
Disclosure of sold/ booked inventoryFile: disclosure of sold- 02072022.pdf4 Oct 2023
Disclosure of sold/ booked inventoryFile: discolsure of sold - 04102023.pdf4 Oct 2023
Disclosure of sold/ booked inventoryFile: disclosure of sold - 07012023.pdf4 Oct 2023
Disclosure of sold/ booked inventoryFile: disclosure of sold - 06042023.pdf4 Oct 2023
Disclosure of sold/ booked inventoryFile: discolsure of sold - 04072023.pdf4 Oct 2023
Disclosure of sold/ booked inventoryFile: disclosure of sold - 30092023.pdf4 Oct 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: architect certificate - 05042021.pdf30 Sep 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: architect certificate - 07072021.pdf30 Sep 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: architect certificate - 04102021.pdf30 Sep 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: architect certificate - 05012022.pdf30 Sep 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: architect certificate 07042022.pdf30 Sep 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: architect certificate 05072022.pdf30 Sep 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: architect certificate - 03102022.pdf30 Sep 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: architect certificate 6012023.pdf30 Sep 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: architect certificate 04042023.pdf30 Sep 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ENGINEERS CERTIFICATE - 3062021.pdf30 Sep 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ENGINEERS CERIFICATE - 3092021.pdf30 Sep 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ENGINEERS CERTIFICATE - 31122021.pdf30 Sep 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ENGINEERS CERTIFICATE - 3132022.pdf30 Sep 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ENGINEERS CERTIFICATE - 3062022.pdf30 Sep 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ENGINEERS CRTIFICAE - 3092022.pdf30 Sep 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ENGINEERS CERTIFICATE - 30122022.pdf30 Sep 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ENGINEERS CERTIFICATE - 3132023.pdf30 Sep 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ENGINEERS CERTIFICATE - 3062023.pdf30 Sep 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: C A CERTIFICATERS 1012021 31032021.pdf30 Sep 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: C A CERTIFICATE - 142021 TO 3062021.pdf30 Sep 2023

Promoter's earlier projects1

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

1 delivered on promise
ProjectLocationFlatsStatusPromisedDelivered
VARAD VANDANPUNE BYPASS ROAD SANGLI6CompletedDec 2017Mar 2017

How this compares with Sangli

11%of Sangli projects moved their completion datethis one moved by 24 months
29%of Sangli registrations have lapsed or been cancelledthis one is among them

Computed across the 790+ Sangli projects on ReraGenie, from their own filings.

Keep SHIVAM CAMPUS on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near NEAR MAHESHWARI GARDEN SFURTI CHOUCK790+ in Sangli

Builder: SHIVAMDEVELOPERS

SHIVAMDEVELOPERS has 2 registrations on MahaRERA, including SHIVAM IMPERIA and SHIVAM CAMPUS. Its filings disclose 1 earlier MahaRERA project: declares 1 of 1 past projects completed on time. Read the full track record. See more projects on the Sangli district page.

Frequently asked questions

What does it mean that SHIVAM CAMPUS shows as registration lapsed on MahaRERA?

A registration runs until the completion date the promoter declared. If the project is neither completed nor extended by then it lapses, and a de-registration or revocation ends it by order. In every case the promoter may no longer legally advertise, market or sell in the project, and the Authority can act under section 7 against a defaulting promoter. What it does not do is cancel an agreement for sale you have already signed, or extinguish your section 18 right to delay interest or refund; those run from your agreement, not from the registration. Get the current position from the promoter in writing, verify it on the MahaRERA portal, and take legal advice before paying any further instalment.

What are my rights if SHIVAM CAMPUS is delayed beyond 30 Jun 2026?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of SHIVAM CAMPUS?

The registered promoter entity is SHIVAMDEVELOPERS, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in SHIVAM CAMPUS?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for SHIVAM CAMPUS?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at SHIVAM CAMPUS?

The professionals named in the filing: Architect: AR VIVEK DESHPANDE; Engineer: Mr Pritam Dattatray Shinde; Chartered Accountant: Mr Shriniwas N Bhosale. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in SHIVAM CAMPUS?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About SHIVAM CAMPUS. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save SHIVAM CAMPUS to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.