Red flags

  • Completion date moved by 62 months
  • 1 extension taken

Clear

  • No litigation declared
  • No complaints on record
  • Separate project account declared
  • Allotment letter follows the model form
  • Recorded completed on MahaRERA

2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Amravati registration emailed to you, free during the pilot beta.
Nov 2029Possession promisedregistration recorded completed
2 of 11Construction stages donefurthest along: Excavation, 90%
0Complaints at MahaRERAon this registration
Jump to the 57 documents Report an error

SHIVAJI SANKUL 5 is a Residential / Group Housing project by SUBHASH DEVIDAS BHARSAKALE in Amravati, Maharashtra, registered with MahaRERA as P50300010727 on 31 Aug 2017. The registration is recorded completed; possession was promised by 1 Nov 2029. The completion date has moved by 62 months from the original filing.

At a glance

Project

  • NameSHIVAJI SANKUL 5
  • TypeResidential / Group Housing
  • Location
    • AMRAVATI
    • Amravati (M Corp.)
    • 444607
  • Pincode444607
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P50300010727
  • ReraGenie IDRG-MH-01029

Builder

  • NameSUBHASH DEVIDAS BHARSAKALE
  • Entity typeIndividual
  • Other registrations2 more →
  • Completed3 of 3
  • Declared earlier projects6 →

Key dates

this monthRegisteredAug 2017First promiseSep 2024Revised toNov 2029Recorded completed

Key facts

Registration and timeline

  • StatusCompleted
  • Registered on31 Aug 2017
  • Promised completion1 Nov 2029
  • Revised completionRevised to 1 Nov 2029 (originally 1 Sep 2024)
  • Buildings1 building record
  • Documents filed57 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
SHIVAJI SANKUL 5NA50000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 11 Aug 2023, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

2 of 11 construction stages are filed complete. The stage furthest along is Excavation, at 90%.

SHIVAJI SANKUL 5: 27% average across the applicable activities

ActivityProgress
Excavation90%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure5%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks2%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 11 Aug 2023, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes2%
Storm Water DrainsNoNot applicable
Landscaping & Tree PlantingYes10%
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterYes5%
Solid Waste Management And DisposalYes0%
Water conservation /Rain water harvestingYes0%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsNoNot applicable
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceYes20%
Open ParkingYes10%

Parking filed117

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots117
Open Space117

Land and ownership

MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area1,440 sq m
Land owned byThe promoter
Named landownersNone

Approvals and building plan

Permissible FSI2592.48
Proposed, not sanctioned1,980 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchBLDG NO 91 B P NO 02 TRIVENI COMPLEX RUKHMINI NAGAR AMRAVATI

Certifying professionals and partners3

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectSUBHASH DEVIDAS BUARSAKALE
EngineerRAVIKANT MADHUSUDAN AGRAWAL
Chartered AccountantHEDA AND KALANI
PartnerRole in project
SUBHASH DEVIDAS BHARSAKALE-

Extensions applied for1

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EXT50300017307Sep 2024 → Nov 2029

Reason as filed by the promoterNo bookings up to this day of uploading the data, hence, the construction of project was slowed down for financial managements corresponding to the progress of project.

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 25 Aug 2017
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 24 Aug 2017
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 24 Aug 2017
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 24 Aug 2017Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateOn the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    uploaded 11 Aug 2023

Documents filed57

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Declaration about Commencement CertificateFile: plinth completion certificate- S5.pdf11 Aug 2023
Declaration about Commencement CertificateFile: AC- S5.pdf11 Aug 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: S5-Form 1.pdf11 Aug 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: S5-Form 2.pdf11 Aug 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: S5-Form 2.pdf11 Aug 2023
Disclosure of sold/ booked inventoryFile: ANNEXURE - A.pdf11 Aug 2023
Certificates of CA (Form 3)File: S5-Form 3.pdf11 Aug 2023
Certificates of CA (Form 5)File: S5-Form5.pdf11 Aug 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: S5-Form5.pdf11 Aug 2023
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: plinth completion certificate- S5.pdf11 Aug 2023
OtherFile: plinth completion certificate- S5.pdf11 Aug 2023
OtherFile: AC- S5.pdf11 Aug 2023
OtherFile: FORM B.pdf11 Aug 2023
OtherFile: FORM B-2.pdf11 Aug 2023
OtherFile: FORM C - CORRECTION.pdf11 Aug 2023
OtherFile: FORM C - TABLE.pdf11 Aug 2023
Other - TechnicalFile: plinth completion certificate- S5.pdf11 Aug 2023
Details of encumbrances concerned to FinanceFile: non encumbrance certificate - S5.pdf13 Nov 2022
Details of encumbrances concerned to LegalFile: non encumbrance certificate - S5.pdf13 Nov 2022
Declaration about Commencement CertificateFile: commencement certificate - S5_compressed.pdf13 Nov 2022
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: form 1 - S5.pdf13 Nov 2022
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: form 2 - S5.pdf13 Nov 2022
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: form 2 - S5.pdf13 Nov 2022
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: form 2 - S5.pdf13 Nov 2022
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: form 5 - S5.pdf13 Nov 2022
Disclosure of sold/ booked inventoryFile: form 3 - S5_compressed.pdf13 Nov 2022
Certificates of CA (Form 3)File: form 3 - S5_compressed.pdf13 Nov 2022
Certificates of CA (Form 5)File: form 5 - S5.pdf13 Nov 2022
Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)File: form 5 - S5.pdf13 Nov 2022
Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: form 5 - S5.pdf13 Nov 2022
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: form 5 - S5.pdf13 Nov 2022
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: form 5 - S5.pdf13 Nov 2022
Proforma of Agreement for saleFile: agreement - S5 (1)_compressed.pdf13 Nov 2022
Proforma of Allotment letterFile: allotment letter - S5_compressed.pdf13 Nov 2022
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: commencement certificate - S5_compressed.pdf13 Nov 2022
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: statement 21-22 - S5 (1).pdf13 Nov 2022
Deviation Report with respect to Allotment letterFile: allotment letter - S5_compressed.pdf13 Nov 2022
Deviation Report with respect to model copy of AgreementFile: deviations to model agreement- S5.pdf13 Nov 2022
Certificates of CA (Form 5)File: FORM 5 Sankul 5.pdf18 Dec 2018
Status of Formation of Legal EntityFile: SHIVAJI SANKUL 5 STATUS OF FORMATION OF LEGAL ENTITY.pdf9 Mar 2018
Status of ConveyanceFile: Shivaji Sankul 5 STATUS OF CONVEYANCE PDF.pdf9 Mar 2018
Copy of the legal title reportFile: Sankul 5-TITLE REPORT.pdf25 Aug 2017
Details of encumbrancesFile: Non Encumbrance certificate.pdf25 Aug 2017
Layout approvalFile: layout plan sankul-5.pdf24 Aug 2017
Building plan approvalFile: SANKUL 5 - SANCTIONED PLAN.pdf24 Aug 2017
PAN CardFile: 1-PAN CARD.pdf24 Aug 2017
Copy of Layout Approval (in case of layout)File: layout plan sankul-5.pdf24 Aug 2017
Building Plan Approval (IOD)File: SANKUL 5 - SANCTIONED PLAN.pdf24 Aug 2017
Commencement Certificates / NA Order for plotted developmentFile: SANKUL 5 - COMENCEMENT CERTIFICATE.pdf24 Aug 2017
Declaration in FORM BFile: DECLARATION sankul 5.pdf24 Aug 2017
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: FORM-1 ARCHITECT'S CERTIFICATE.pdf24 Aug 2017
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: FORM- 2 ENGINEER'S CERTIFICATE.pdf24 Aug 2017
Certificates of CA (Form 3)File: FORM- 3 CA CERTIFICATE.pdf24 Aug 2017
Certificates of CA (Form 5)File: FORM-5 CA CERTIFICATE.pdf24 Aug 2017
Proforma of Allotment letterFile: Sankul -5-Agreement To Sale.pdf24 Aug 2017
Certificates of Architect (Form 4)File: FORM- 4 ARCHITECT'S CERTIFICATE.pdf24 Aug 2017
OtherFile: PROPERTY RECORD 15 A 5 6 7.pdf24 Aug 2017

Promoter's earlier projects6

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

5 delivered on promise1 delivered late
ProjectLocationFlatsStatusPromisedDelivered
SHIVAJI ENCLAVE - 2BEHIND SAINAGAR AKOLI AMRAVATI 44460727CompletedOct 2022Sep 2022
SHIVAJI ENCLAVE - 1BEHIND SAINAGAR AKOLI AMRAVATI 44460728CompletedSep 2017Jul 2017
SHIVAJI SANKUL 2BEHIND SAINAGAR AKOLI AMRAVATI12CompletedMar 2015Mar 2015
SHIVAJI SANKUL 3BEHIND SAINAGAR AKOLI AMRAVATI12CompletedMar 2015Late, Mar 2015
SHIVAJI SANKUL 1BEHIND SAINAGAR AKOLI AMRAVATI23CompletedOct 2014Jun 2014
SHIVAJI APARTMENTSBEHIND SAINAGAR AKOLI AMRAVATI13CompletedOct 2014Jun 2014

How this compares with Amravati

8%of Amravati projects moved their completion datethis one moved by 62 months
33%of Amravati registrations have lapsed or been cancelledthis one is completed

Computed across the 450+ Amravati projects on ReraGenie, from their own filings.

Keep SHIVAJI SANKUL 5 on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near AMRAVATI450+ in Amravati

2 kmSHIVAJI SANKUL 5Completed 9Lapsed / revoked 1Other 6Dot size: filed unitsN

Filed coordinates, straight-line distance. 16 registered projects within 2 km.

Builder: SUBHASH DEVIDAS BHARSAKALE

SUBHASH DEVIDAS BHARSAKALE has 3 registrations on MahaRERA, including SHIVAJI ENCLAVE - 2 and SHIVAJI SANKUL4. Its filings disclose 6 earlier MahaRERA projects: declares 5 of 6 past projects completed on time. Read the full track record. See more projects on the Amravati district page.

Frequently asked questions

What are my rights if SHIVAJI SANKUL 5 is delayed beyond 1 Nov 2029?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of SHIVAJI SANKUL 5?

The registered promoter entity is SUBHASH DEVIDAS BHARSAKALE, an individual as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in SHIVAJI SANKUL 5?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for SHIVAJI SANKUL 5?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at SHIVAJI SANKUL 5?

The professionals named in the filing: Architect: SUBHASH DEVIDAS BUARSAKALE; Engineer: RAVIKANT MADHUSUDAN AGRAWAL; Chartered Accountant: HEDA AND KALANI. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in SHIVAJI SANKUL 5?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About SHIVAJI SANKUL 5. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save SHIVAJI SANKUL 5 to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.