Home / Browse projects / Raigarh, Maharashtra / SHIV SAI COMPLEX

Registered No litigation declared Others project

SHIV SAI COMPLEX

By SHIV SAI DEVELOPERS

RG-MH-81274 · RERA P52000015737 · Last updated on MahaRERA portal: 3 Aug 2026

Source: official MahaRERA filing

Red flags

  • Completion date moved by 36 months
  • 3 extensions taken

Clear

  • No litigation declared
  • No complaints on record
  • Separate project account declared
  • Allotment letter follows the model form

2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Raigarh registration emailed to you, free during the pilot beta.
Dec 2026Possession promisedmoved 36 months from the original
48 of 77Construction stages doneacross 7 buildings; furthest along: Installation of Lifts, 97%
124 of 131Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 114 documents Report an error

SHIV SAI COMPLEX is a Others project by SHIV SAI DEVELOPERS in Raigarh, Maharashtra, registered with MahaRERA as P52000015737 on 19 Mar 2018. Possession is promised by 31 Dec 2026. The completion date has moved by 36 months from the original filing. 7 of the 131 units on this registration are recorded sold or booked, and 48 of 77 construction stages are filed complete.

At a glance

Project

  • NameSHIV SAI COMPLEX
  • TypeOthers
  • Location
    • VILLAGE CHINCHAVALI
    • TAL KARJAT
    • Chinchawali
    • Karjat
    • Raigarh
    • 410201
  • Pincode410201
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P52000015737
  • ReraGenie IDRG-MH-81274

Builder

  • NameSHIV SAI DEVELOPERS
  • Entity typePartnership
  • PartnersSUBHAKAR DOMBAYA KOTIAN, JITESH SUKHDEV KATKAR, RUI DACOSTA LUIS, SANDEEP VITHAL SHETTY
  • Other registrations7 more →
  • Completed1 of 8
  • No longer live3 lapsed, de-registered or revoked
  • Declared earlier projects1 →

Key dates

this monthRegisteredMar 2018First promiseDec 2023Revised toDec 2026

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on19 Mar 2018
  • Promised completion31 Dec 2026
  • Revised completionRevised to 31 Dec 2026 (originally 30 Dec 2023)
  • Buildings7 building records
  • Documents filed114 files

Current status

5%7 of 131 units booked
88.2%Work done, per cost certificate

Figures as on 3 Aug 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
BUILDING NO 1-B WINGNA668311
BUILDING NO 4 - H WINGNA6610212
BUILDING NO 3 - G WINGNA5516824
BUILDING NO 3 - F WINGNA8816521
BUILDING NO 2 - E WINGNA6616521
BUILDING NO 2 - D WINGNA6616521
BUILDING NO 2 - C WINGNA7716521

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building7

As on 3 Aug 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

48 of 77 construction stages are filed complete across 7 buildings. The stage furthest along is Installation of Lifts, at 97%.

BUILDING NO 1-B WING82%
ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.97%
BUILDING NO 4 - H WING82%
ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
BUILDING NO 3 - G WING82%
ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.97%
BUILDING NO 3 - F WING82%
ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.97%
BUILDING NO 2 - E WING60%
ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks80%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.75%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
BUILDING NO 2 - D WING60%
ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks80%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.75%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
BUILDING NO 2 - C WING60%
ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks80%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.75%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 3 Aug 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes80%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsYes100%
Landscaping & Tree PlantingYes30%
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes80%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsNoNot applicable
Electrical meter room, sub-station, receiving stationYes50%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingYes0%

Parking filed147

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots147
Closed/Covered7
Open Space140
BuildingClosed/CoveredOpen SpaceTotal
BUILDING NO 1-B WING12021
BUILDING NO 4 - H WING12021
BUILDING NO 3 - G WING12021
BUILDING NO 3 - F WING12021
BUILDING NO 2 - E WING12021
BUILDING NO 2 - D WING12021
BUILDING NO 2 - C WING12021

Land and ownership1

MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area4,600 sq m
Land owned byThe promoter, with other names on the file
Named landowners1
LandownerVillageDistrict
JAIRAM BHAGATChinchawaliRaigarh

Approvals and building plan

Sanctioning authorityMaharashtra Shasan
Permissible FSI4600.0
Proposed, not sanctioned4,600 sq m
Buildings approved7
Buildings sanctioned7

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchLOWER PAREL MUMBAI
Estimated costRs 8.09 cr
Cost incurredRs 7.14 cr
Work done88.23%
BuildingWingEstimatedIncurred
BUILDING NO 3 - G WINGNARs 1.40 crRs 1.39 cr
BUILDING NO 3 - F WINGNARs 1.40 crRs 1.39 cr
BUILDING NO 4 - H WINGNARs 1.09 crRs 1.09 cr
BUILDING NO 2 - E WINGNARs 1.09 crRs 81.55 lakh
BUILDING NO 2 - D WINGNARs 1.09 crRs 81.55 lakh
BUILDING NO 2 - C WINGNARs 1.09 crRs 81.55 lakh
BUILDING NO 1-B WINGNARs 67.89 lakhRs 67.21 lakh
-NARs 26.97 lakhRs 16.18 lakh

Certifying professionals and partners7

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectP K MADHAV
ArchitectVastospati design group
EngineerYATISH TARE
EngineerVastukalp
EngineerVishal Bhagat
Chartered AccountantD P Shejwal and Associates
Chartered AccountantSingh Ranjan & Co
PartnerRole in project
SHIV SAI DEVELOPERS-

Extensions applied for3

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EXT52000017443Dec 2023 → Dec 2024

Reason as filed by the promoterOur Project is almost complete. We just need Extension till 29-12-2024.

EXT52000027414Dec 2023 → Mar 2026

Reason as filed by the promoterWe have details mentioned how we can complete our project till 31-03-2026

EA02072621658Dec 2023 → Dec 2026

Reason as filed by the promoter1) Poor booking response from customer. 2) Because of poor response our work was very slow. 3) Delay from getting Electric Transformer from Government Authority.

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 14 Mar 2018
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 15 Mar 2018
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 14 Mar 2018
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 14 Mar 2018Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Dec 2026

Documents filed114

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 114 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: FORM 1-16 30-06-2026.pdf3 Aug 2026
Withdrawal Update Form 2File: FORM 2-16 30-06-2026.pdf3 Aug 2026
Withdrawal Update Form 3File: FORM 3 Shiv sai developers 30-06-2026.pdf3 Aug 2026
Form 5 (FY 2023-2024)File: Shiv Sai Developers - Form 5.pdf5 Jul 2026
Form 5 (FY 2022-2023)File: Form 5 22-23.pdf5 Jul 2026
Form 5 (FY 2021-2022)File: Form 5 21-22.pdf5 Jul 2026
Form 5 (FY 2020-2021)File: Form 5 20-21.pdf5 Jul 2026
Form 5 (FY 2019-2020)File: Form 5 19-20.pdf5 Jul 2026
Form 5 (FY 2018-2019)File: Form 5 18-19.pdf5 Jul 2026
Form 5 (FY 2017-2018)File: Form 5 17-18.pdf5 Jul 2026
Form 2A (FY 2023-2024)File: Form 2A 2023-24.pdf2 Jul 2026
Form 2A (FY 2024-2025)File: Form 2A 2024-25.pdf2 Jul 2026
Form 2A (FY 2025-2026)File: Form 2A 2025-26.pdf2 Jul 2026
Form 5 (FY 2024-2025)File: Form 5 SHIV SAI DEVELOPERS 24-25.pdf2 Jul 2026
Form 1File: FORM 1-14 31-12-2025.pdf21 May 2026
Form 2File: Form 2 31-12-2025.pdf21 May 2026
Form 3File: FORM 3 Shiv sai developers 31-12-2025.pdf21 May 2026
Disclosure of Sold and Booked InventoryFile: Disclosure Sold Unsold 31-12-2025.pdf21 May 2026
Form 1File: Form 1 31-03-2026.pdf21 May 2026
Form 2File: Form 2 31-03-2026.pdf21 May 2026
Form 3File: FORM 3 Shiv sai developers 31-03-2026.pdf21 May 2026
Disclosure of Sold and Booked InventoryFile: Disclosure Sold Unsold 31-03-2026.pdf21 May 2026
Form 1File: Form 1 30-06-25.pdf5 Dec 2025
Form 2File: Form 2 30-06-25.pdf5 Dec 2025
Form 3File: FORM 3 Shiv sai developers 30-06-2025.pdf5 Dec 2025
Disclosure of Sold and Booked InventoryFile: Disclosure Sold Unsold 30-06-25.pdf5 Dec 2025
Form 1File: FORM 1 30-09-2025.pdf5 Dec 2025
Form 2File: Form 2 30-09-25.pdf5 Dec 2025
Form 3File: FORM 3 Shiv sai developers 30-09-2025 new.pdf5 Dec 2025
Disclosure of Sold and Booked InventoryFile: Disclosure Sold Unsold 30-09-25.pdf5 Dec 2025
Form 1File: Form 1.pdf27 Jun 2025
Form 2File: Form 2.pdf27 Jun 2025
Form 3File: Form 3 - new.pdf27 Jun 2025
Disclosure of Sold and Booked InventoryFile: sold unsold q4.pdf27 Jun 2025
Self-declaration of Quarterly ProgressFile: disc for qpr shiv sai comp.pdf27 Jun 2025
Declaration in FORM BFile: Form B.pdf7 Apr 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: 2A.pdf7 Apr 2025
Disclosure of sold/ booked inventoryFile: Disclosure of Sold - 30-06-2024.pdf1 Mar 2025
Disclosure of sold/ booked inventoryFile: Disclosure of Sold - 30-09-2024.pdf1 Mar 2025
Disclosure of sold/ booked inventoryFile: Disclosure of Sold - 31-12-2024.pdf1 Mar 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1.pdf23 Jan 2025
Certificates of CA (Form 3)File: Form 3 SHIV SAI DEV- converted.pdf23 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2.pdf23 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1.pdf11 Dec 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1.pdf11 Dec 2024
Certificates of CA (Form 3)File: Form 3.pdf11 Dec 2024
Certificates of CA (Form 3)File: FORM 3.pdf11 Dec 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2.pdf11 Dec 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2.pdf11 Dec 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Shiv Sai Developers - Form 5.pdf11 Dec 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 SIGNED.pdf23 Apr 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1.pdf23 Apr 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 SIGNED.pdf23 Apr 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2.pdf23 Apr 2024
Certificates of CA (Form 3)File: FORM 3 SIGNED - converted.pdf23 Apr 2024
Certificates of CA (Form 3)File: FORM-3.pdf23 Apr 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 - Shiv Sai Complex.pdf18 Oct 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form -2 - Shiv Sai Complex.pdf18 Oct 2023
Certificates of CA (Form 3)File: Form 3 30-09-2023 SIGNED.pdf18 Oct 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Form 5 FY 2022-23.pdf12 Oct 2023
Proforma of Agreement for saleFile: AFS.pdf25 Aug 2023
Proforma of Allotment letterFile: ALLOTMENT DRAFT NEW.pdf25 Aug 2023
Declaration in FORM BFile: Form-B.pdf24 Aug 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1.pdf24 Aug 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM2.pdf24 Aug 2023
Certificates of CA (Form 3)File: Form 3.pdf24 Aug 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: Disclouser of Interest in other real estate organization.pdf24 Aug 2023
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Format A bank account decla.pdf24 Aug 2023
Details of encumbrances concerned to FinanceFile: No encumbrances Certificate FINANCE and LEGAL (2).pdf16 Aug 2023
Details of encumbrances concerned to LegalFile: No encumbrances Certificate FINANCE and LEGAL (2).pdf16 Aug 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: Form 2A 2021-22.pdf16 Aug 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Form 2A 2022-23.pdf16 Aug 2023
Deviation Report with respect to Allotment letterFile: deviation-allotment.pdf16 Aug 2023
Deviation Report with respect to model copy of AgreementFile: deviation-draft sale.pdf16 Aug 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: Form 5 FY 2021-22.pdf14 Apr 2023
Other - TechnicalFile: Declaration for deletion of A wing from the project.pdf7 Jan 2023
Declaration about Commencement CertificateFile: FORMAT D.pdf14 Feb 2022
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: FORM 2A 19-20.pdf14 Feb 2022
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: FORM 2A 20-21.pdf14 Feb 2022
CERSAI detailsFile: CERSAI Search Report.pdf14 Feb 2022

How this compares with Raigarh

5%of this project is bookeddistrict median 29%
20%of Raigarh projects moved their completion datethis one moved by 36 months
26%of Raigarh registrations have lapsed or been cancelledthis one is on the register

Computed across the 5,900+ Raigarh projects on ReraGenie, from their own filings.

Free monthly report: Navi Mumbai and Raigad on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep SHIV SAI COMPLEX on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near TAL KARJAT5,900+ in Raigarh

Builder: SHIV SAI DEVELOPERS

SHIV SAI DEVELOPERS has 8 registrations on MahaRERA, including SAIDHAM VASAHAT and SWAPNLOK RESIDENCY PHASE II. Its filings disclose 1 earlier MahaRERA project, none completed yet. Read the full track record. See more projects on the Raigarh district page.

Frequently asked questions

What are my rights if SHIV SAI COMPLEX is delayed beyond 31 Dec 2026?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of SHIV SAI COMPLEX?

The registered promoter entity is SHIV SAI DEVELOPERS, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in SHIV SAI COMPLEX?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for SHIV SAI COMPLEX?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at SHIV SAI COMPLEX?

The professionals named in the filing: Architect: P K MADHAV; Architect: Vastospati design group; Engineer: YATISH TARE; Engineer: Vastukalp; Engineer: Vishal Bhagat; Chartered Accountant: D P Shejwal and Associates. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in SHIV SAI COMPLEX?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About SHIV SAI COMPLEX. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save SHIV SAI COMPLEX to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.