Shiv Krupa
By M/s. J. V. Constructions & Developers
RG-MH-06939 · RERA P51800056181 · Last updated on MahaRERA portal: 18 Jun 2026
Source: official MahaRERA filing
Or get an email each time it changes, with the project watch
Red flags
- No red flags in this filing
Clear
- No litigation declared
- No complaints on record
- Completion date never moved
- Separate project account declared
- Allotment letter follows the model form
Nothing adverse is on this record. The buyer report still reads the filed documents themselves.
See what the report covers Free either way: or have every new Mumbai Suburban registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
Shiv Krupa is a Residential / Group Housing project by M/s. J. V. Constructions & Developers in Mumbai Suburban, Maharashtra, registered with MahaRERA as P51800056181 on 16 May 2024. Possession is promised by 25 Dec 2028. 24 of the 108 units on this registration are recorded sold or booked, and 7 of 22 construction stages are filed complete.
At a glance
Project
- NameShiv Krupa
- TypeResidential / Group Housing
- Location
- Dattapada Road
- Borivali (East)
- Kanheri
- Borivali
- Mumbai Suburban
- 400066
- Pincode400066
- RERA no.P51800056181
- ReraGenie IDRG-MH-06939
Builder
- NameM/s. J. V. Constructions & Developers
- Entity typePartnership
- PartnersJayantilal Arjanbhai Patel, Vasant Anandji Patel
Key dates
Key facts
Registration and timeline
- StatusRegistered
- Registered on16 May 2024
- Promised completion25 Dec 2028
- Revised completionNone
- Buildings2 building records
- Documents filed62 files
Current status
Figures as on 18 Jun 2026, this project's latest MahaRERA filing.
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| Rehab Building Wing-A | NA | 20 | 20 | 31 | 16 | 47 |
| Sale Wing-B | NA | 15 | 15 | 61 | 0 | 61 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building2
As on 18 Jun 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
7 of 22 construction stages are filed complete across 2 buildings. The stage furthest along is Slabs of Super Structure, at 50%.
Rehab Building Wing-A32%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 50% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 0% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
Sale Wing-B36%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 0% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 0% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
Progress on shared amenities15
As on 18 Jun 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | Yes | 0% |
| Water Supply | Yes | 0% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 0% |
| Storm Water Drains | Yes | 0% |
| Landscaping & Tree Planting | Yes | 0% |
| Street Lighting | Yes | 0% |
| Community Buildings | Yes | 0% |
| Treatment And Disposal Of Sewage And Sullage Water | Yes | 0% |
| Solid Waste Management And Disposal | Yes | 0% |
| Water conservation /Rain water harvesting | Yes | 0% |
| Energy managemcnt | Yes | 0% |
| Fire protection and fire safety requirements | Yes | 0% |
| Electrical meter room, sub-station, receiving station | Yes | 0% |
| Aggregate area of recreational Open Space | Yes | 0% |
| Open Parking | No | Not applicable |
Parking filed56
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
| Building | Closed/Covered | Total |
|---|---|---|
| Rehab Building Wing-A | 15 | 15 |
| Sale Wing-B | 41 | 41 |
Land and ownership2
MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.
| Landowner | Village | District |
|---|---|---|
| Shri Manubhai Kuberbhai Pandya | Magathane | Mumbai Suburban |
| Shri Prakash Kuberbhai Pandya | Magathane | Mumbai Suburban |
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
| Building | Wing | Estimated | Incurred |
|---|---|---|---|
| Rehab Building Wing-A | NA | Rs 42.09 cr | Rs 8.20 cr |
| Sale Wing-B | NA | Rs 42.09 cr | Rs 8.20 cr |
| - | NA | Rs 3.55 cr | - |
Certifying professionals and partners5
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | DOT Architect |
| Engineer | Minesh Shah |
| Engineer | N D Rathod & Associates |
| Chartered Accountant | H. P. Jadeja & Associates |
| Chartered Accountant | Anita A Yadav & Associates |
| Partner | Role in project |
|---|---|
| M/s. J. V. Constructions & Developers | - |
Complaints filed with MahaRERA
No complaints on record against this registration.
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 28 Feb 2024 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 4 Mar 2024 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 15 Mar 2024 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 8 Nov 2023Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateNot due yet
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
possession is promised for 25 Dec 2028
Documents filed62
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Withdrawal Update Form 1File: FORM 1 Q4 25-26 Shiv Krupa.pdf | 18 Jun 2026 |
| Withdrawal Update Form 2File: FORM 2 Q4 25-26 Shiv Krupa.pdf | 18 Jun 2026 |
| Withdrawal Update Form 3File: FORM 3 Q4 25-26 Shiv Krupa.pdf | 18 Jun 2026 |
| Withdrawal Update Form 1File: FORM 1 Q1 25-26 Shiv Krupa.pdf | 25 May 2026 |
| Withdrawal Update Form 1File: FORM 1 Q2 25-26 Shiv Krupa.pdf | 25 May 2026 |
| Withdrawal Update Form 1File: FORM 1 Q3 25-26 Shiv Krupa.pdf | 25 May 2026 |
| Withdrawal Update Form 1File: FORM 1 Q4 25-26 Shiv Krupa.pdf | 25 May 2026 |
| Withdrawal Update Form 2File: FORM 2 Q1 25-26 Shiv Krupa.pdf | 25 May 2026 |
| Withdrawal Update Form 2File: FORM 2 Q2 25-26 Shiv Krupa.pdf | 25 May 2026 |
| Withdrawal Update Form 2File: FORM 2 Q2 25-26 Shiv Krupa.pdf | 25 May 2026 |
| Withdrawal Update Form 2File: FORM 2 Q4 25-26 Shiv Krupa.pdf | 25 May 2026 |
| Withdrawal Update Form 3File: FORM 3 Q1 25-26 Shiv Krupa.pdf | 25 May 2026 |
| Withdrawal Update Form 3File: FORM 3 Q2 25-26 Shiv Krupa.pdf | 25 May 2026 |
| Withdrawal Update Form 3File: FORM 3 Q2 25-26 Shiv Krupa.pdf | 25 May 2026 |
| Withdrawal Update Form 3File: FORM 3 Q4 25-26 Shiv Krupa.pdf | 25 May 2026 |
| Form 2A (FY 2024-2025)File: Form 2A 24-25 Shiv Krupa new.pdf | 25 May 2026 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 Q1 24-25.pdf | 1 Apr 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 Q2 24-25.pdf | 1 Apr 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 Q3 24-25.pdf | 1 Apr 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Q1 2425.pdf | 17 Feb 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Q2 2425.pdf | 17 Feb 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate - Q1.pdf | 17 Jan 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate - Q2.pdf | 17 Jan 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate - Q3.pdf | 17 Jan 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form-3 Master.pdf | 23 Apr 2024 |
| Building plan approvalFile: DRW 1-compressed marking.pdf | 15 Mar 2024 |
| Building Plan Approval / NA Order for plotted developmentFile: DRW 1-compressed marking.pdf | 15 Mar 2024 |
| Declaration about Commencement CertificateFile: CC Declaration -Format D Revised.pdf | 15 Mar 2024 |
| Other - TechnicalFile: CC of Comp Bldg Uploading in RERA Dtd 06 03 2024.pdf | 7 Mar 2024 |
| Layout approvalFile: DRW 1-compressed.pdf | 4 Mar 2024 |
| Layout approvalFile: DRW 2-compressed.pdf | 4 Mar 2024 |
| Layout approvalFile: DRW 3-compressed.pdf | 4 Mar 2024 |
| Layout approvalFile: DRW 4-compressed.pdf | 4 Mar 2024 |
| Layout approvalFile: DRW 5-compressed.pdf | 4 Mar 2024 |
| Layout approvalFile: DRW 6 and 7-compressed.pdf | 4 Mar 2024 |
| Copy of Layout Approval (in case of layout)File: DRW 1-compressed.pdf | 4 Mar 2024 |
| Copy of Layout Approval (in case of layout)File: DRW 2-compressed.pdf | 4 Mar 2024 |
| Copy of Layout Approval (in case of layout)File: DRW 3-compressed.pdf | 4 Mar 2024 |
| Copy of Layout Approval (in case of layout)File: DRW 4-compressed.pdf | 4 Mar 2024 |
| Copy of Layout Approval (in case of layout)File: DRW 5-compressed.pdf | 4 Mar 2024 |
| Copy of Layout Approval (in case of layout)File: DRW 6 and 7-compressed.pdf | 4 Mar 2024 |
| Other - TechnicalFile: Annexure -A -Standalone Building Order-50-shivkrupa.pdf | 2 Mar 2024 |
| Copy of the legal title reportFile: LEGAL TITLE REPORT-REVISED.pdf | 28 Feb 2024 |
| Details of encumbrances concerned to FinanceFile: New Details of encumbrances concerned to Finance (1).pdf | 20 Feb 2024 |
| Details of encumbrances concerned to LegalFile: New Details of encumbrances concerned to Finance (1).pdf | 20 Feb 2024 |
| CERSAI detailsFile: CERSAI Undertaking With Report FNL.pdf | 20 Feb 2024 |
| Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: New Bank Declaration.pdf | 20 Feb 2024 |
| Proforma of Agreement for saleFile: Agreement for Sale (MahaRERA) 12 02 2024.pdf | 15 Feb 2024 |
| Proforma of Allotment letterFile: 1 Allotment Letter (Order 31).pdf | 15 Feb 2024 |
| Declaration in FORM BFile: Affidavit cum Declaration promoter .pdf | 31 Jan 2024 |
| Disclosure of Interest in Other Real Estate OrganizationsFile: ilovepdf_merged.pdf | 12 Jan 2024 |
| Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Seperate Bank Account -Format-A.pdf | 12 Jan 2024 |
| Deviation Report with respect to Allotment letterFile: Deviation Allotment Letter.pdf | 4 Jan 2024 |
| Deviation Report with respect to model copy of AgreementFile: Deviation Agreement for Sale.pdf | 4 Jan 2024 |
| Details of encumbrances concerned to FinanceFile: Encumbrance Finance.pdf | 26 Dec 2023 |
| Details of encumbrances concerned to FinanceFile: Encumbrance Legal.pdf | 26 Dec 2023 |
| Details of encumbrances concerned to LegalFile: Encumbrance Finance.pdf | 26 Dec 2023 |
| Details of encumbrances concerned to LegalFile: Encumbrance Legal.pdf | 26 Dec 2023 |
| Building plan approvalFile: IOA.pdf | 8 Nov 2023 |
| PAN CardFile: J V Construction PAN.pdf | 8 Nov 2023 |
| Building Plan Approval / NA Order for plotted developmentFile: IOA.pdf | 8 Nov 2023 |
| Commencement Certificates / NA Order for plotted developmentFile: CC.pdf | 8 Nov 2023 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Mumbai Suburban
Computed across the 6,700+ Mumbai Suburban projects on ReraGenie, from their own filings.
Free monthly report: Mumbai on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Built from this project's filings on the day you order, in plain language.
- Red flags and clear checks, the possession story, sanctions and sales, land and title, who you are dealing with
- All 62 filed documents as one ZIP, foldered, with a manifest
- The project watch below, included free for 90 days
Project watch
Only want to be told when something changes?
- An email each time this filing moves: new sales, a moved possession date, an extension, a complaint, the occupancy certificate
- Plain words, conditions that have happened marked in red
- A summary of everything that changed when the 90 days end
Keep Shiv Krupa on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near Borivali (East)6,700+ in Mumbai Suburban
Shraddha Park City
Shraddha Prime Projects Limited
GREENAIRY
SAROJ LANDMARK REALTY LLP
Sky City Tower H
Incline Realty Private Limited
Sky City Tower G
Incline Realty Private Limited
SHEETAL REGALIA
D G S TOWNSHIP PRIVATE LIMITED
JANGID ELYSIUM
IMPRINT CONSTRUCTION PRIVATE LIMITED
See every Mumbai Suburban project, with the district possession charts
Builder: M/s. J. V. Constructions & Developers
M/s. J. V. Constructions & Developers has 1 registration on MahaRERA, including Shiv Krupa. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Mumbai Suburban district page.
Frequently asked questions
What are my rights if Shiv Krupa is delayed beyond 25 Dec 2028?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of Shiv Krupa?
The registered promoter entity is M/s. J. V. Constructions & Developers, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in Shiv Krupa?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How current is the construction progress shown for Shiv Krupa?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at Shiv Krupa?
The professionals named in the filing: Architect: DOT Architect; Engineer: Minesh Shah; Engineer: N D Rathod & Associates; Chartered Accountant: H. P. Jadeja & Associates; Chartered Accountant: Anita A Yadav & Associates. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in Shiv Krupa?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback