Home / Browse projects / Pune, Maharashtra / SHINDE GREENS

Registration lapsed No litigation declared Residential / Group Housing project

SHINDE GREENS

By GANPAT VISHWANATH SHINDE

RG-MH-11126 · RERA P52100004765 · Last updated on MahaRERA portal: 22 Jul 2024

Source: official MahaRERA filing

Red flags

  • Registration lapsed
  • Possession 35 months past the filed date

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form
  • All 2 earlier projects delivered on promise

2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.
Nov 2023Possession promised35 months past this date
5 of 11Construction stages donefurthest along: Staircases, 90%
0Complaints at MahaRERAon this registration
Jump to the 99 documents Report an error

SHINDE GREENS is a Residential / Group Housing project by GANPAT VISHWANATH SHINDE in Pune, Maharashtra, registered with MahaRERA as P52100004765 on 9 Aug 2017. Possession was promised by 3 Nov 2023 and is now 35 months past that date.

At a glance

Project

  • NameSHINDE GREENS
  • TypeResidential / Group Housing
  • Location
    • BHIGWAN ROAD
    • BARAMATI
    • JALOCHI
    • Baramati
    • Pune
    • 413102
  • Pincode413102
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P52100004765
  • ReraGenie IDRG-MH-11126

Builder

  • NameGANPAT VISHWANATH SHINDE
  • Entity typeIndividual
  • Declared earlier projects2 →

Key dates

35 months past promisethis monthRegisteredAug 2017PromisedNov 2023

Key facts

Registration and timeline

  • StatusRegistration lapsed
  • Registered on9 Aug 2017
  • Promised completion3 Nov 2023
  • Revised completionNone
  • Buildings1 building record
  • Documents filed99 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
SHINDE GREENSNA70000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 22 Jul 2024, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

5 of 11 construction stages are filed complete. The stage furthest along is Staircases, at 90%.

SHINDE GREENS: 80% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises70%
Sanitary Fittings within the flats / premises80%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks90%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.70%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.70%

Progress on shared amenities19

As on 22 Jul 2024, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes100%
Water SupplyYes100%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsNoNot applicable
Landscaping & Tree PlantingYes100%
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes100%
Energy managemcntYes100%
Fire protection and fire safety requirementsNoNot applicable
Electrical meter room, sub-station, receiving stationYes100%
Aggregate area of recreational Open SpaceYes0%
Open ParkingNoNot applicable
BASEMENT COLUMN BEAM SLAB STAIR LIFT WALLS COMPOUND DRAINAGE LINE WATERLINE COYes100%
BRICK WORKYes100%
RCC SLAB COLUMN BEAMYes100%
STILT GR FLOOR PARKING COLUMN BEAN SLAB LIFT STAIRCASE ETCYes100%

Parking filed16

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots16
Closed/Covered16

Land and ownership

MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area2,100 sq m
Land owned byThe promoter
Named landownersNone

Approvals and building plan

Permissible FSI1606.5
Proposed, not sanctioned1,449 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchNEAR PENCIL CHOWK ,MIDC JALOCHI,BARAMATI

Certifying professionals and partners2

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectSANJAY S KADAM
EngineerSANJAY S KADAM
PartnerRole in project
GANPAT VISHWANATH SHINDE-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 29 Jul 2017
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 26 Jul 2017
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 26 Jul 2017
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 26 Jul 2017Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateOn the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    uploaded 28 Jun 2024

Documents filed99

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 99 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: Engineer Form 2A -31-03-2020.pdf22 Jul 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Engineer Form 2A -31-03-2021.pdf22 Jul 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: Engineer Form 2A -31-03-2022.pdf22 Jul 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: CA form 5 31-03-2020.pdf22 Jul 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: CA form 5 31-03-2021.pdf22 Jul 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: CA form 5 31-03-2022.pdf22 Jul 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: CA form 5 31-03-2023.pdf22 Jul 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: CA form 5 31-03-2024.pdf22 Jul 2024
Details of encumbrances concerned to FinanceFile: No Encumbrance Certificate-19-07-2024.pdf20 Jul 2024
Details of encumbrances concerned to LegalFile: No Encumbrance Certificate-19-07-2024.pdf20 Jul 2024
Disclosure for secured/unsecured finance availed for the projectFile: No Encumbrance Certificate-19-07-2024.pdf20 Jul 2024
CERSAI detailsFile: No Encumbrance Certificate-19-07-2024.pdf20 Jul 2024
Certificates of CA (Form 3)File: CA Form 3 31-03-2022.pdf20 Jul 2024
Certificates of CA (Form 3)File: CA Form 3 30-09-2022.pdf20 Jul 2024
Certificates of CA (Form 3)File: CA Form 3 31-03-2023.pdf20 Jul 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: discloser of non interest and non Encubrance .pdf20 Jul 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Engineer -Supervisor Certificate Rera form 2A March 2023.pdf28 Jun 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Engineer-Supervisor Certificate Rera form 2A March 2024 (2).pdf28 Jun 2024
Disclosure of sold/ booked inventoryFile: Shinde Greens wing A booking Details.pdf28 Jun 2024
Disclosure of sold/ booked inventoryFile: PART OCCUPANCY GREENS.pdf28 Jun 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: C A certificate Rera form 5 March 23.pdf28 Jun 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: C A certificate Rera form 5 March 24.pdf28 Jun 2024
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: Architect Certificate Rera form 4 Shinde.pdf28 Jun 2024
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: part occupancy shinde greens.pdf28 Jun 2024
Proforma of Agreement for saleFile: 01 profarma agreement to sale.pdf19 Jun 2024
Proforma of Agreement for saleFile: 02 profarma agreement to sale.pdf19 Jun 2024
Proforma of Agreement for saleFile: 03 profarma agreement to sale (1).pdf19 Jun 2024
Proforma of Agreement for saleFile: 01 to 10 profarma agreement to sale-compressed.pdf19 Jun 2024
Proforma of Agreement for saleFile: 11 to 20 profarma agreement to sale-compressed.pdf19 Jun 2024
Proforma of Agreement for saleFile: 21 to 25 profarma agreement to sale-compressed (1).pdf19 Jun 2024
Details of encumbrances concerned to FinanceFile: Baramati bank release.pdf18 Jun 2024
Details of encumbrances concerned to LegalFile: Baramati bank release.pdf18 Jun 2024
Declaration about Commencement CertificateFile: shinde Greens commencement certificate .pdf18 Jun 2024
Copy of the legal title reportFile: LEGAL TITLE REPORT2.pdf29 Jul 2017
Copy of the legal title reportFile: LEGAL TITLE REPORT3.pdf29 Jul 2017
Copy of the legal title reportFile: LEGAL TITLE REPORT4.pdf29 Jul 2017
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: CERTIFICATE OF ARCHITECT.pdf29 Jul 2017
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: CERTIFICATE OF ARCHITECT1.pdf29 Jul 2017
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: CERTIFICATE OF ARCHITECT2.pdf29 Jul 2017
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: CERTIFICATE OF ARCHITECT3.pdf29 Jul 2017
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: CERTIFICATE OF ENGINEER.pdf29 Jul 2017
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: CERTIFICATE OF ENGINEER2.pdf29 Jul 2017
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: CERTIFICATE OF ENGINEER3.pdf29 Jul 2017
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: CERTIFICATE OF ENGINEER4.pdf29 Jul 2017
Certificates of CA (Form 3)File: FORM 3 CA 1.pdf29 Jul 2017
Certificates of CA (Form 3)File: FORM 3 CA 2.pdf29 Jul 2017
Certificates of CA (Form 3)File: FORM 3 CA 3.pdf29 Jul 2017
Certificates of CA (Form 3)File: FORM 3 CA 4.pdf29 Jul 2017
Certificates of CA (Form 3)File: FORM 3 CA 5.pdf29 Jul 2017
Proforma of Allotment letterFile: ALLOTMENT LETTER PROFORMA.pdf29 Jul 2017
Proforma of Allotment letterFile: proforma agreement to sale 1.pdf29 Jul 2017
Proforma of Allotment letterFile: proforma agreement to sale 2.pdf29 Jul 2017
Proforma of Allotment letterFile: proforma agreement to sale 3.pdf29 Jul 2017
Proforma of Allotment letterFile: proforma agreement to sale 4.pdf29 Jul 2017
Proforma of Allotment letterFile: proforma agreement to sale 5.pdf29 Jul 2017
Proforma of Allotment letterFile: proforma agreement to sale 6.pdf29 Jul 2017
Proforma of Allotment letterFile: proforma agreement to sale 7.pdf29 Jul 2017
Proforma of Allotment letterFile: proforma agreement to sale 8.pdf29 Jul 2017
Proforma of Allotment letterFile: proforma agreement to sale 9.pdf29 Jul 2017
Proforma of Allotment letterFile: proforma agreement to sale 10.pdf29 Jul 2017
Proforma of Allotment letterFile: proforma agreement to sale 11.pdf29 Jul 2017
Proforma of Allotment letterFile: proforma agreement to sale 12.pdf29 Jul 2017
Proforma of Allotment letterFile: proforma agreement to sale 13.pdf29 Jul 2017
Proforma of Allotment letterFile: proforma agreement to sale 14.pdf29 Jul 2017
Proforma of Allotment letterFile: proforma agreement to sale 15.pdf29 Jul 2017
Proforma of Allotment letterFile: proforma agreement to sale 16.pdf29 Jul 2017
Proforma of Allotment letterFile: proforma agreement to sale 17.pdf29 Jul 2017
Proforma of Allotment letterFile: proforma agreement to sale 18.pdf29 Jul 2017
Proforma of Allotment letterFile: proforma agreement to sale 19.pdf29 Jul 2017
Proforma of Allotment letterFile: proforma agreement to sale 20.pdf29 Jul 2017
Proforma of Allotment letterFile: proforma agreement to sale 21.pdf29 Jul 2017
Proforma of Allotment letterFile: proforma agreement to sale 22.pdf29 Jul 2017
Details of encumbrancesFile: NO ENCUMBRACE AFFIDAVIT 1.pdf27 Jul 2017
Details of encumbrancesFile: NO ENCUMBRACE AFFIDAVIT 2.pdf27 Jul 2017
Declaration in FORM BFile: FORM B 1.pdf27 Jul 2017
Declaration in FORM BFile: FORM B 2.pdf27 Jul 2017
Layout approvalFile: layout plan.pdf26 Jul 2017
Building plan approvalFile: plan sanctioned i.pdf26 Jul 2017
Building plan approvalFile: plan sanctioned ii.pdf26 Jul 2017
Copy of the legal title reportFile: LEGAL TITLE REPORT.pdf26 Jul 2017

Promoter's earlier projects2

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

2 delivered on promise
ProjectLocationFlatsStatusPromisedDelivered
SHARAD PARKKASABA BARAMATI12CompletedJul 2012Dec 2011
SHARAD PRIDEKASABA BARAMATI37CompletedNov 2008May 2008

How this compares with Pune

26%of Pune projects moved their completion datethis one has not
26%of Pune registrations have lapsed or been cancelledthis one is among them

Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.

Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep SHINDE GREENS on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near JALOCHI13,700+ in Pune

2 kmSHINDE GREENSCompleted 20Lapsed / revoked 10Other 33Dot size: filed unitsN

Filed coordinates, straight-line distance. 63 registered projects within 2 km.

Builder: GANPAT VISHWANATH SHINDE

GANPAT VISHWANATH SHINDE has 1 registration on MahaRERA, including SHINDE GREENS. Its filings disclose 2 earlier MahaRERA projects: declares 2 of 2 past projects completed on time. Read the full track record. See more projects on the Pune district page.

Frequently asked questions

What does it mean that SHINDE GREENS shows as registration lapsed on MahaRERA?

A registration runs until the completion date the promoter declared. If the project is neither completed nor extended by then it lapses, and a de-registration or revocation ends it by order. In every case the promoter may no longer legally advertise, market or sell in the project, and the Authority can act under section 7 against a defaulting promoter. What it does not do is cancel an agreement for sale you have already signed, or extinguish your section 18 right to delay interest or refund; those run from your agreement, not from the registration. Get the current position from the promoter in writing, verify it on the MahaRERA portal, and take legal advice before paying any further instalment.

What are my rights if SHINDE GREENS is delayed beyond 3 Nov 2023?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of SHINDE GREENS?

The registered promoter entity is GANPAT VISHWANATH SHINDE, an individual as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in SHINDE GREENS?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for SHINDE GREENS?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at SHINDE GREENS?

The professionals named in the filing: Architect: SANJAY S KADAM; Engineer: SANJAY S KADAM. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in SHINDE GREENS?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About SHINDE GREENS. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save SHINDE GREENS to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.