SHILP ALASKA
By DEVSAN INFRASTUCTURE PRIVATE LIMITED
RG-MH-45220 · RERA P51600048075 · Last updated on MahaRERA portal: 20 Aug 2026
Source: official MahaRERA filing
Or get an email each time it changes, with the project watch
Red flags
- No red flags in this filing
Clear
- No litigation declared
- No complaints on record
- Completion date never moved
- No encumbrance on the project land
- Separate project account declared
- Allotment letter follows the model form
Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against every project registered within 2 km.
See what the report covers Free either way: or have every new Nashik registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
SHILP ALASKA is a Residential / Group Housing project by DEVSAN INFRASTUCTURE PRIVATE LIMITED in Nashik, Maharashtra, registered with MahaRERA as P51600048075 on 8 Dec 2022. Possession is promised by 30 Jun 2028. 7 of the 44 units on this registration are recorded sold or booked, and 3 of 11 construction stages are filed complete.
At a glance
Project
- NameSHILP ALASKA
- TypeResidential / Group Housing
- Location
- JAIL ROAD
- DASAK SHIWAR
- Nashik
- 422006
- Pincode422006
- MapView location on Google Maps (as filed on RERA)
- RERA no.P51600048075
- ReraGenie IDRG-MH-45220
Builder
- NameDEVSAN INFRASTUCTURE PRIVATE LIMITED
- Entity typeCompany
- GSTIN27AAICD8407F1ZM
- DirectorsSANDEEP BHOJRAJ KARNAWAT, PINAL AMULAKH VORA, PRAMOD KEDARNATH AGARWAL
Key dates
Key facts
Registration and timeline
- StatusRegistered
- Registered on8 Dec 2022
- Promised completion30 Jun 2028
- Revised completionNone
- Buildings1 building record
- Documents filed92 files
Current status
Figures as on 20 Aug 2026, this project's latest MahaRERA filing.
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| C WING | NA | 13 | 11 | 44 | 0 | 44 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building1
As on 20 Aug 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
3 of 11 construction stages are filed complete. The stage furthest along is Slabs of Super Structure, at 90%.
C WING: 48% average across the applicable activities
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 90% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 70% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 70% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
Progress on shared amenities15
As on 20 Aug 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | Yes | 0% |
| Water Supply | Yes | 0% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 0% |
| Storm Water Drains | No | Not applicable |
| Landscaping & Tree Planting | Yes | 0% |
| Street Lighting | No | Not applicable |
| Community Buildings | No | Not applicable |
| Treatment And Disposal Of Sewage And Sullage Water | No | Not applicable |
| Solid Waste Management And Disposal | No | Not applicable |
| Water conservation /Rain water harvesting | Yes | 0% |
| Energy managemcnt | No | Not applicable |
| Fire protection and fire safety requirements | No | Not applicable |
| Electrical meter room, sub-station, receiving station | Yes | 0% |
| Aggregate area of recreational Open Space | No | Not applicable |
| Open Parking | Yes | 0% |
Parking filed33
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
Land and ownership
Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
| Building | Wing | Estimated | Incurred |
|---|---|---|---|
| C WING | NA | Rs 6.69 cr | Rs 3.44 cr |
Certifying professionals and partners4
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | Tejas More |
| Engineer | KISHOR CHOPDA |
| Chartered Accountant | PRITAM BAGMAR |
| Chartered Accountant | Nitesh Wankhede |
| Partner | Role in project |
|---|---|
| DEVSAN INFRASTUCTURE PRIVATE LIMITED | - |
Complaints filed with MahaRERA
No complaints on record against this registration.
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 17 Aug 2022 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 17 Aug 2022 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 17 Aug 2022 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 22 May 2024Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateNot due yet
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
possession is promised for 30 Jun 2028
Documents filed92
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 92 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Withdrawal Update Form 1File: FORM 1 C Q1 30062026.pdf | 20 Aug 2026 |
| Withdrawal Update Form 2File: FORM 2 C Q1 30062026.pdf | 20 Aug 2026 |
| Withdrawal Update Form 3File: FORM 3 C Q1 30062026.pdf | 20 Aug 2026 |
| Withdrawal Update Form 1File: Form 1.pdf | 22 May 2026 |
| Withdrawal Update Form 2File: Form 2 C Q4 31032026.pdf | 22 May 2026 |
| Withdrawal Update Form 3File: Form 3 C Q4 31032026.pdf | 22 May 2026 |
| Form 1File: Form 1 devsans C Q2 30092025.pdf | 6 Feb 2026 |
| Form 2File: Form 2 devsans C Q2 30092025.pdf | 6 Feb 2026 |
| Form 3File: Form 3 devsans C Q2 30092025.pdf | 6 Feb 2026 |
| Disclosure of Sold and Booked InventoryFile: Disclosure of sold inventory C Q2.pdf | 6 Feb 2026 |
| OthersFile: Form 2A devsans C Q2 30092025.pdf | 6 Feb 2026 |
| Form 1File: Form 1 C Q3 31122025.pdf | 6 Feb 2026 |
| Form 2File: Form 2 C Q3 31122025.pdf | 6 Feb 2026 |
| Form 3File: Form 3 C Q3 31122025.pdf | 6 Feb 2026 |
| Disclosure of Sold and Booked InventoryFile: Disclosure of sold inventory C Q3.pdf | 6 Feb 2026 |
| OthersFile: Form 2A C Q3 31122025.pdf | 6 Feb 2026 |
| Form 1File: Form1Q130062025devsanc.pdf | 20 Jul 2025 |
| Form 2File: Form2Q130062025devsanc.pdf | 20 Jul 2025 |
| Form 3File: Form3Q130062025devsanc.pdf | 20 Jul 2025 |
| Disclosure of Sold and Booked InventoryFile: Disclosure of sold inventory.pdf | 20 Jul 2025 |
| OthersFile: Form2AQ130062025devsanc.pdf | 20 Jul 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form1CQ431032025.pdf | 25 Apr 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form3CQ431032025.pdf | 25 Apr 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form2CQ431032025.pdf | 25 Apr 2025 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Form2AC431032025.pdf | 25 Apr 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 C 311224.pdf | 25 Jan 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3C 311224 compressed.pdf | 25 Jan 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 C 311124.pdf | 25 Jan 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form3Q12425c.pdf | 19 Dec 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: form3Q22425c.pdf | 19 Dec 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FOMR 2 C WING Q1.pdf | 19 Dec 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FOMR 2 C WING Q2.pdf | 19 Dec 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FOrm 1 WING C Q1.pdf | 10 Dec 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 WING C Q2.pdf | 10 Dec 2024 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Form 5 DEVSAN INFRA_CERTIFICATE_C.pdf | 10 Dec 2024 |
| Commencement Certificates / NA Order for plotted developmentFile: COMMENCEMENT CERTIFICATE - NEW.pdf | 22 May 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1.pdf | 22 May 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2.pdf | 22 May 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Devsan Infrastructure Form 3 C Wing.pdf | 22 May 2024 |
| Other - LegalFile: Seld Declaration- C.pdf | 22 May 2024 |
| Other - FinanceFile: Annexure - A - P51600048075.pdf | 22 May 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1.pdf | 14 Mar 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2.pdf | 14 Mar 2024 |
| Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Format A- C.pdf | 14 Mar 2024 |
| Other - FinanceFile: Annexure A- C.pdf | 14 Mar 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Q3 C wing 23-24.pdf | 7 Feb 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Q3 C wing 23-24.pdf | 7 Feb 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Q3 C wing 23-24.pdf | 7 Feb 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 30-09-23 WING C RERA UPDATE FORM A.pdf | 3 Nov 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form -3 - C- 30-09-23.pdf | 3 Nov 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Form 5 Wing C.pdf | 15 Oct 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form-1.pdf | 8 Aug 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form-2.pdf | 8 Aug 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form-3.pdf | 8 Aug 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1.pdf | 23 May 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form2.pdf | 23 May 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Final.pdf | 5 May 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: merge_11zon.pdf | 4 Mar 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 23-02-27 WING C RERA UPDATE FORM A.pdf | 27 Feb 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 FINAL.pdf | 27 Feb 2023 |
| Details of encumbrances concerned to FinanceFile: Affidavit Regarding NO Encumbrances.pdf | 30 Nov 2022 |
| Details of encumbrances concerned to LegalFile: Affidavit Regarding NO Encumbrances.pdf | 30 Nov 2022 |
| CERSAI detailsFile: CERSAI Search Report.pdf | 30 Nov 2022 |
| CERSAI detailsFile: ReplyClarification to Queries.pdf | 30 Nov 2022 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: ReplyClarification to Queries.pdf | 30 Nov 2022 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Final.pdf | 18 Nov 2022 |
| Proforma of Agreement for saleFile: Allotement letter - Wing C.pdf | 10 Sep 2022 |
| Proforma of Allotment letterFile: Allotement letter - Wing C.pdf | 10 Sep 2022 |
| Proforma of Allotment letterFile: Agreement Final_1.pdf | 10 Sep 2022 |
| Proforma of Agreement for saleFile: Agreement Final_1.pdf | 10 Sep 2022 |
| Deviation Report with respect to Allotment letterFile: Deviation Report Allotement letter -Wing C.pdf | 10 Sep 2022 |
| Deviation Report with respect to model copy of AgreementFile: Deviation - Final-.pdf | 10 Sep 2022 |
| Other - LegalFile: ALASKA building Plan Part1.pdf | 1 Sep 2022 |
| Other - LegalFile: ALASKA building Plan Part 2.pdf | 1 Sep 2022 |
| Other - LegalFile: Devsan-Explaination of total plot.pdf | 1 Sep 2022 |
| Other - LegalFile: Proforma Building Plan Part1.pdf | 1 Sep 2022 |
| Other - LegalFile: Proforma Building plan part 2.pdf | 1 Sep 2022 |
| Details of encumbrances concerned to FinanceFile: Encumbrance Letter-Finance-C Wing.pdf | 30 Aug 2022 |
| Details of encumbrances concerned to LegalFile: Encumbrance Letter-Legal-C Wing.pdf | 30 Aug 2022 |
| Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Declaration about seperate Bank Account.pdf | 30 Aug 2022 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Nashik
Computed across the 4,100+ Nashik projects on ReraGenie, from their own filings.
Free monthly report: Nashik on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Built from this project's filings on the day you order, in plain language.
- Red flags and clear checks, the possession story, sanctions and sales, land and title, who you are dealing with
- Joined against every project registered within 2 km, which the RERA portal never shows together
- All 92 filed documents as one ZIP, foldered, with a manifest
- The project watch below, included free for 90 days
Project watch
Only want to be told when something changes?
- An email each time this filing moves: new sales, a moved possession date, an extension, a complaint, the occupancy certificate
- Plain words, conditions that have happened marked in red
- A summary of everything that changed when the 90 days end
Keep SHILP ALASKA on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near DASAK SHIWAR4,100+ in Nashik
Filed coordinates, straight-line distance. 61 registered projects within 2 km.
SIGNIFICANT
IND DEVELOPERS
Shree Parshwanath
Darshan Anil Lodha
Anandsagar Annex Phase 1 ( L and M Wing )
Ravi Mahajan Builders & Developers Pvt. Lt
SHREEJI INSPERIA
Shreeji Landmarks LLP
Pawa Blossom
Pawa Construction
Bait E Muhammad Phase 1
Onyx Constructions
See every Nashik project, with the district possession charts
Builder: DEVSAN INFRASTUCTURE PRIVATE LIMITED
DEVSAN INFRASTUCTURE PRIVATE LIMITED has 1 registration on MahaRERA, including SHILP ALASKA. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Nashik district page.
Frequently asked questions
What are my rights if SHILP ALASKA is delayed beyond 30 Jun 2028?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of SHILP ALASKA?
The registered promoter entity is DEVSAN INFRASTUCTURE PRIVATE LIMITED, a company as per the filing. Its GSTIN 27AAICD8407F1ZM can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in SHILP ALASKA?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How current is the construction progress shown for SHILP ALASKA?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at SHILP ALASKA?
The professionals named in the filing: Architect: Tejas More; Engineer: KISHOR CHOPDA; Chartered Accountant: PRITAM BAGMAR; Chartered Accountant: Nitesh Wankhede. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in SHILP ALASKA?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback