ReraGenieLog inGet a buyer report

Home / Browse projects / Gandhinagar, Gujarat / SHIKSHAPATRI THE 18TH STOREY

Valid until 30 Aug 2028 Mixed Development project

SHIKSHAPATRI THE 18TH STOREY

By SHIKSHAPATRI INFRA BUILD

RG-GJ-25058 · RERA PR/GJ/GANDHINAGAR/GANDHINAGAR/Others/MAA12170/240823 · Last updated on GujRERA portal: 7 Oct 2024

Source: official GujRERA filing

Red flags

  • No red flags in this filing

Clear

  • Completion date never moved
Aug 2028Possession promisedno revision filed
2 of 9Construction stages donefurthest along: Slabs of Super Structure, 50%
64 of 94Units unsoldnot recorded sold or booked
Jump to the 37 documents Report an error

SHIKSHAPATRI THE 18TH STOREY is a Mixed Development project by SHIKSHAPATRI INFRA BUILD in Gandhinagar, Gujarat, registered with GujRERA as PR/GJ/GANDHINAGAR/GANDHINAGAR/Others/MAA12170/240823 on 24 Aug 2023. Possession is promised by 30 Aug 2028. 30 of the 94 units on this registration are recorded sold or booked, and 2 of 9 construction stages are filed complete.

At a glance

Project

  • NameSHIKSHAPATRI THE 18TH STOREY
  • TypeMixed Development
  • Location
    • SHIKSHAPTRI THE 18TH STOREY
    • Beside city pulse cinema
    • Kudasan
    • Gandhinagar
  • PincodeNot stated
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.PR/GJ/GANDHINAGAR/GANDHINAGAR/Others/MAA12170/240823
  • ReraGenie IDRG-GJ-25058

Builder

  • NameSHIKSHAPATRI INFRA BUILD
  • Entity typePARTNERSHIP FIRM

Key dates

this monthRegisteredAug 2023PromisedAug 2028

Key facts

Registration and timeline

  • StatusValid until 30 Aug 2028
  • Registered on24 Aug 2023
  • Promised completion30 Aug 2028
  • Revised completionNone
  • Buildings1 building record
  • Documents filed37 files

Current status

32%30 of 94 units booked
7.9%Of the estimated cost spent so far

Figures as on 7 Oct 2024, this project's latest GujRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
A+B---643094

The full filing

Everything below is from the project's own GujRERA filing, free to read.

Construction progress by building1

As on 7 Oct 2024, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

2 of 9 construction stages are filed complete. The stage furthest along is Slabs of Super Structure, at 50%.

A+B: 38% average across the applicable activities

ActivityProgress
Excavation100%
Podiums (if any)Not applicable
Plinth100%
Stilt Floor0%
Slabs of Super Structure50%
Internal walls, internal plaster, floorings, doors and windows within flats39%
Sanitary fittings within the flats0%
Staircases, lift wells and lobbies at each floor level, overhead and underground water tanks50%
External plumbing and external plaster, elevation, completion of terraces with waterproofing0%
Installation of lifts, water pumps, fire fighting fittings, electrical fittings and finishing0%

Progress on shared amenities23

As on 7 Oct 2024, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal roads and footpathsYes0%
Water supplyYes0%
Sewerage (chamber, lines, septic tank, STP)Yes0%
Storm water drainsYes0%
Landscaping and tree plantingYes0%
Street lightingYes0%
Community buildingsNoNot applicable
Treatment and disposal of sewage and sullage waterNoNot applicable
Solid waste management and disposalNoNot applicable
Water conservation, rain water harvestingYes0%
Energy managementNoNot applicable
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Fire fightingYes0%
Drinking water facilitiesNoNot applicable
Emergency evacuationNoNot applicable
Use of renewable energyNoNot applicable
SecurityYes0%
Letter boxYes0%
Compound wallYes0%
Plinth protectionYes0%
Water tankYes0%
Other requirementsYes0%

Land and ownership

This page carries no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area4,349 sq m

Project account and cost

70 percent of buyer money must sit in the project account, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountNot declared
Estimated costRs 70.00 cr
Cost incurredRs 5.50 cr
Spent of the estimate7.86%
BuildingWingEstimatedIncurred
A+BNARs 70.00 crRs 5.50 cr

Certifying professionals and partners2

Certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectSAPACE EDGE DESIGN STUDIO
EngineerP CUBE CONSTRUCTION LLP

Documents filed37

As listed on the registration, under the names the promoter filed them with. The files themselves are available at source: search the registration number PR/GJ/GANDHINAGAR/GANDHINAGAR/Others/MAA12170/240823 on the GujRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Engineer's certificate (Form 2)7 Oct 2024
Engineer's certificate annexure7 Oct 2024
RERA registration certificate24 Aug 2023
Proforma agreement for sale-
Auditor's report (1 of 3)-
Auditor's report (2 of 3)-
Auditor's report (3 of 3)-
Income tax return (1 of 3)-
Income tax return (2 of 3)-
Income tax return (3 of 3)-
Project specific document-
Directors' report (1 of 3)-
Directors' report (2 of 3)-
Directors' report (3 of 3)-
Commencement certificate-
Approved sanctioned plan-
Approved layout plan-
Agreement-
Land location-
Area development document-
Proforma allotment letter-
Brochure-
Project related document-
Title clearance certificate-
Title report-
Property card-
Project photograph-
Proforma sale deed-
Audited balance sheet (1 of 3)-
Audited balance sheet (2 of 3)-
Audited balance sheet (3 of 3)-
Audited profit and loss statement (1 of 3)-
Audited profit and loss statement (2 of 3)-
Audited profit and loss statement (3 of 3)-
Cash flow statement (1 of 3)-
Cash flow statement (2 of 3)-
Cash flow statement (3 of 3)-

How this compares with Gandhinagar

32%of this project is bookeddistrict median 53%
16%of Gandhinagar projects moved their completion datethis one has not

Computed across the 1,600+ Gandhinagar projects on ReraGenie, from their own filings.

Keep SHIKSHAPATRI THE 18TH STOREY on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

Other projects near Gandhinagar1,600+ in Gandhinagar

2 kmSHIKSHAPATRI THE 18TH STOther 236Dot size: filed unitsN

Filed coordinates, straight-line distance. 236 registered projects within 2 km.

Builder: SHIKSHAPATRI INFRA BUILD

SHIKSHAPATRI INFRA BUILD has 1 registration on GujRERA, including SHIKSHAPATRI THE 18TH STOREY. Read the full track record. See more projects on the Gandhinagar district page.

Frequently asked questions

What are my rights if SHIKSHAPATRI THE 18TH STOREY is delayed beyond 30 Aug 2028?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, at the rate the state's RERA rules prescribe, or exit and claim a full refund with interest. Claims are filed as complaints with GujRERA.

How do I verify and contact the developer of SHIKSHAPATRI THE 18TH STOREY?

The registered promoter entity is SHIKSHAPATRI INFRA BUILD, a partnership firm as per the filing. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's GujRERA listing and in its filed documents.

Is my payment protected in SHIKSHAPATRI THE 18TH STOREY?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

Who certifies construction progress at SHIKSHAPATRI THE 18TH STOREY?

The professionals named in the filing: Architect: SAPACE EDGE DESIGN STUDIO; Engineer: P CUBE CONSTRUCTION LLP. Their certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in SHIKSHAPATRI THE 18TH STOREY?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area; that the agreement follows the model agreement under the state's RERA rules, with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on GujRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About SHIKSHAPATRI THE 18TH STOREY. Everything on this page comes from what the promoter filed on GujRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save SHIKSHAPATRI THE 18TH STOREY to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.