Home / Browse projects / Gandhinagar, Gujarat / SHIKHAR PRIDE

Valid until 30 Jun 2026 Residential/Group Housing project

SHIKHAR PRIDE

By VARDAN CORPORATION

RG-GJ-82961 · RERA PR/GJ/GANDHINAGAR/GANDHINAGAR/AUDA/RAA06856/070320 · Last updated on GujRERA portal: 4 May 2023

Source: official GujRERA filing

Red flags

  • No red flags in this filing

Clear

  • Completion date never moved
Jun 2026Possession promisedno revision filed
27 of 27Construction stages doneacross 3 buildings; every applicable stage filed complete
10 of 60Units unsoldnot recorded sold or booked
Jump to the 43 documents Report an error

SHIKHAR PRIDE is a Residential/Group Housing project by VARDAN CORPORATION in Gandhinagar, Gujarat, registered with GujRERA as PR/GJ/GANDHINAGAR/GANDHINAGAR/AUDA/RAA06856/070320 on 7 Mar 2020. Possession is promised by 30 Jun 2026. 50 of the 60 units on this registration are recorded sold or booked, and 27 of 27 construction stages are filed complete.

At a glance

Project

  • NameSHIKHAR PRIDE
  • TypeResidential/Group Housing
  • Location
    • Survey No 144
    • FP 19
    • TP 48
    • Near Ratnam Coral
    • Behind Shanti Junior
    • Kotheshwar
    • Koteshwar
    • Gandhinagar
  • PincodeNot stated
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.PR/GJ/GANDHINAGAR/GANDHINAGAR/AUDA/RAA06856/070320
  • ReraGenie IDRG-GJ-82961

Builder

  • NameVARDAN CORPORATION
  • Entity typePARTNERSHIP FIRM

Key dates

this monthRegisteredMar 2020PromisedJun 2026

Key facts

Registration and timeline

  • StatusValid until 30 Jun 2026
  • Registered on7 Mar 2020
  • Promised completion30 Jun 2026
  • Revised completionNone
  • Buildings3 building records
  • Documents filed43 files

Current status

83%50 of 60 units booked
114.8%Of the estimated cost spent so far

Figures as on 4 May 2023, this project's latest GujRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Block A---20020
Block B---20020
Block C---20020

The full filing

Everything below is from the project's own GujRERA filing, free to read.

Construction progress by building3

As on 4 May 2023, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

27 of 27 construction stages are filed complete across 3 buildings.

Block A100%
ActivityProgress
Excavation100%
Podiums (if any)Not applicable
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, internal plaster, floorings, doors and windows within flats100%
Sanitary fittings within the flats100%
Staircases, lift wells and lobbies at each floor level, overhead and underground water tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing100%
Installation of lifts, water pumps, fire fighting fittings, electrical fittings and finishing100%
Block B100%
ActivityProgress
Excavation100%
Podiums (if any)Not applicable
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, internal plaster, floorings, doors and windows within flats100%
Sanitary fittings within the flats100%
Staircases, lift wells and lobbies at each floor level, overhead and underground water tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing100%
Installation of lifts, water pumps, fire fighting fittings, electrical fittings and finishing100%
Block C100%
ActivityProgress
Excavation100%
Podiums (if any)Not applicable
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, internal plaster, floorings, doors and windows within flats100%
Sanitary fittings within the flats100%
Staircases, lift wells and lobbies at each floor level, overhead and underground water tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing100%
Installation of lifts, water pumps, fire fighting fittings, electrical fittings and finishing100%

Progress on shared amenities19

As on 4 May 2023, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal roads and footpathsYes100%
Water supplyYes100%
Sewerage (chamber, lines, septic tank, STP)Yes100%
Storm water drainsYes100%
Landscaping and tree plantingYes100%
Street lightingYes100%
Community buildingsNoNot applicable
Treatment and disposal of sewage and sullage waterNoNot applicable
Solid waste management and disposalYes100%
Water conservation, rain water harvestingYes100%
Energy managementNoNot applicable
Fire protection and fire safety requirementsYes100%
Electrical meter room, sub-station, receiving stationYes100%
Fire fightingYes100%
Drinking water facilitiesYes100%
Emergency evacuationNoNot applicable
Use of renewable energyNoNot applicable
SecurityYes100%
Letter boxYes100%

Land and ownership

This page carries no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area3,824 sq m

Project account and cost

70 percent of buyer money must sit in the project account, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountNot declared
Estimated costRs 17.62 cr
Cost incurredRs 20.23 cr
Spent of the estimate114.81%
BuildingWingEstimatedIncurred
Block ANARs 5.88 crRs 6.75 cr
Block BNARs 5.88 crRs 6.75 cr
Block CNARs 5.88 crRs 6.75 cr

Certifying professionals and partners2

Certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectMr. SOURABH VERMA (9th STREET ARCHITECTS)
EngineerACHAL JITENDRA PARIKH

Documents filed43

As listed on the registration, under the names the promoter filed them with. The files themselves are available at source: search the registration number PR/GJ/GANDHINAGAR/GANDHINAGAR/AUDA/RAA06856/070320 on the GujRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Accountant's certificate (Form 3)4 May 2023
Architect's certificate (Form 1)1 May 2023
Engineer's certificate (Form 2)1 May 2023
Engineer's certificate annexure1 May 2023
Site photograph, Block A1 May 2023
Site photograph, Block B1 May 2023
Site photograph, Block C1 May 2023
RERA registration certificate7 Mar 2020
Proforma agreement for sale-
Auditor's report (1 of 3)-
Auditor's report (2 of 3)-
Auditor's report (3 of 3)-
Income tax return (1 of 3)-
Income tax return (2 of 3)-
Income tax return (3 of 3)-
Project specific document-
Directors' report (1 of 3)-
Directors' report (2 of 3)-
Directors' report (3 of 3)-
Commencement certificate-
Approved sanctioned plan-
Approved layout plan-
Agreement-
Land location-
Encumbrance certificate-
Area development document-
Proforma allotment letter-
Brochure-
Project related document-
Declaration in Form B-
Title clearance certificate-
Title report-
Property card-
Project photograph-
Audited balance sheet (1 of 3)-
Audited balance sheet (2 of 3)-
Audited balance sheet (3 of 3)-
Audited profit and loss statement (1 of 3)-
Audited profit and loss statement (2 of 3)-
Audited profit and loss statement (3 of 3)-
Cash flow statement (1 of 3)-
Cash flow statement (2 of 3)-
Cash flow statement (3 of 3)-

How this compares with Gandhinagar

83%of this project is bookeddistrict median 53%
16%of Gandhinagar projects moved their completion datethis one has not

Computed across the 1,600+ Gandhinagar projects on ReraGenie, from their own filings.

Keep SHIKHAR PRIDE on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

Other projects near Koteshwar1,600+ in Gandhinagar

2 kmSHIKHAR PRIDEOther 52Dot size: filed unitsN

Filed coordinates, straight-line distance. 52 registered projects within 2 km.

Builder: VARDAN CORPORATION

VARDAN CORPORATION has 1 registration on GujRERA, including SHIKHAR PRIDE. Read the full track record. See more projects on the Gandhinagar district page.

Frequently asked questions

What are my rights if SHIKHAR PRIDE is delayed beyond 30 Jun 2026?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, at the rate the state's RERA rules prescribe, or exit and claim a full refund with interest. Claims are filed as complaints with GujRERA.

How do I verify and contact the developer of SHIKHAR PRIDE?

The registered promoter entity is VARDAN CORPORATION, a partnership firm as per the filing. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's GujRERA listing and in its filed documents.

Is my payment protected in SHIKHAR PRIDE?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

Who certifies construction progress at SHIKHAR PRIDE?

The professionals named in the filing: Architect: Mr. SOURABH VERMA (9th STREET ARCHITECTS); Engineer: ACHAL JITENDRA PARIKH. Their certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in SHIKHAR PRIDE?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area; that the agreement follows the model agreement under the state's RERA rules, with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on GujRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About SHIKHAR PRIDE. Everything on this page comes from what the promoter filed on GujRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save SHIKHAR PRIDE to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.