Home / Browse projects / Mumbai Suburban, Maharashtra / SHEETAL USHA AND NISHA

Registered No litigation declared Others project

SHEETAL USHA AND NISHA

By D G LAND DEVELOPERS PRIVATE LIMITED

RG-MH-97891 · RERA P51800045746 · Last updated on MahaRERA portal: 7 May 2025

Source: official MahaRERA filing

Red flags

  • 1 complaint at MahaRERA

Clear

  • No litigation declared
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form

1 condition is on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Mumbai Suburban registration emailed to you, free during the pilot beta.
Apr 2027Possession promisedno revision filed
13 of 33Construction stages doneacross 3 buildings; furthest along: Slabs of Super Structure, 80%
1Complaints at MahaRERAon this registration
Jump to the 73 documents Report an error

SHEETAL USHA AND NISHA is a Others project by D G LAND DEVELOPERS PRIVATE LIMITED in Mumbai Suburban, Maharashtra, registered with MahaRERA as P51800045746 on 9 Jun 2022. Possession is promised by 29 Apr 2027. 1 complaint is on record with the regulator.

At a glance

Project

  • NameSHEETAL USHA AND NISHA
  • TypeOthers
  • Location
    • MARVE ROAD
    • MALAD WEST
    • Borivali
    • Mumbai Suburban
    • 400095
  • Pincode400095
  • RERA no.P51800045746
  • ReraGenie IDRG-MH-97891

Builder

  • NameD G LAND DEVELOPERS PRIVATE LIMITED
  • Entity typeCompany
  • DirectorsSURAJDEV DUDHNATH SHUKLA, ISHWARDEV DUDHNATH SHUKLA
  • Other registrations14 more →
  • Completed4 of 15
  • No longer live6 lapsed, de-registered or revoked
  • Declared earlier projects6 →

Key dates

this monthRegisteredJun 2022PromisedApr 2027

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on9 Jun 2022
  • Promised completion29 Apr 2027
  • Revised completionNone
  • Buildings3 building records
  • Documents filed73 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
SHEETAL USHA A WINGNA250000
SHEETAL USHA B WINGNA250000
SHEETAL NISHA C WINGNA240000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building3

As on 7 May 2025, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

13 of 33 construction stages are filed complete across 3 buildings. The stage furthest along is Slabs of Super Structure, at 80%.

SHEETAL USHA A WING75%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure80%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises52%
Sanitary Fittings within the flats / premises35%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks80%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.45%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.35%
SHEETAL USHA B WING59%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor6%
Slabs of Super Structure62%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises39%
Sanitary Fittings within the flats / premises33%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks62%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.40%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.12%
SHEETAL NISHA C WING59%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor0%
Slabs of Super Structure62%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises39%
Sanitary Fittings within the flats / premises33%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks62%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.40%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.12%

Progress on shared amenities15

As on 7 May 2025, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes0%
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalYes0%
Water conservation /Rain water harvestingYes0%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceYes0%
Open ParkingYes0%

Parking filed2

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots2
Closed/Covered2
BuildingClosed/CoveredTotal
SHEETAL USHA A WING11
SHEETAL USHA B WING11

Land and ownership2

MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area3,846 sq m
Land owned byThe promoter, with other names on the file
Named landowners2
LandownerVillageDistrict
USHA JANAKALYANNAGAR CO OP HSG SOCIETYBorivaliMumbai Suburban
NISHA JANKALYAN NAGAR CO-OP HSG SOCIETYBorivaliMumbai Suburban

Approvals and building plan

Permissible FSI6588.75
Proposed, not sanctioned6,589 sq m
Buildings approved3
Buildings sanctioned3

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchSAI ARCADE N S ROAD MULUND WEST MUMBAI 400080

Certifying professionals and partners

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

PartnerRole in project
D G LAND DEVELOPERS PRIVATE LIMITED-

Complaints filed with MahaRERA1

Case no.ComplainantRespondentFiled
CC12503814Hemant Gaurishankar JoshiD G LAND DEVELOPERS PRIVATE LIMITED31/10/2025

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 26 May 2022
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 31 May 2022
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 31 May 2022
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 8 Jul 2023Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 29 Apr 2027

Documents filed73

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 -Dec-24.pdf7 May 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form-3 Dec-24_compressed.pdf7 May 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form-2 -Dec-24.pdf7 May 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form-1 Sept-24.pdf11 Dec 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 Sept-24_compressed.pdf11 Dec 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2- Sept-24.pdf11 Dec 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: usha form 3_01 (10 files merged).pdf8 Nov 2024
Disclosure of sold/ booked inventoryFile: Disclosure of sold_ booked.pdf8 Nov 2024
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Format A.pdf8 Nov 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: 1 Disclosure of Interest in Other Real Estate Organizations (5).pdf8 Nov 2024
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Format A.pdf12 Aug 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1.pdf8 Aug 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2.pdf8 Aug 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Form-5 -fy 23-24.pdf14 Jun 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 - Usha Nisha chsl 08-05-2024.pdf15 May 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM-2 SHEETAL USHA NISHA-31-03-2024.pdf15 May 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: 2-A.pdf15 May 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form-3 Dec-23.pdf15 May 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM-3 March-24_compressed.pdf15 May 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM-2 DEC (2).pdf7 Mar 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 -DEC.pdf6 Mar 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Licensed Surveyors Certificate_001_1 (3 files merged).pdf23 Nov 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Usha 14CR.pdf23 Nov 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 USHA.pdf23 Nov 2023
Details of encumbrances concerned to FinanceFile: 1 Details of encumbrances (34).pdf20 Nov 2023
Details of encumbrances concerned to LegalFile: 1 Details of encumbrances (34).pdf20 Nov 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Form 5 22-23 Sheetal usha Final signed.pdf20 Nov 2023
Proforma of Agreement for saleFile: 1 Proforma of Allotment letter (12).pdf20 Nov 2023
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Format A bank account decla.pdf20 Nov 2023
Deviation Report with respect to Allotment letterFile: deviation-allotment.pdf20 Nov 2023
Deviation Report with respect to model copy of AgreementFile: deviation-draft sale.pdf20 Nov 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Usha.pdf18 Nov 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Form 2A.pdf18 Nov 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: RAJ PUROHIT TIWARI_.pdf30 Aug 2023
Commencement Certificates / NA Order for plotted developmentFile: 2386354_FurtherCC_signed.pdf8 Jul 2023
Commencement Certificates / NA Order for plotted developmentFile: DOC-20230417-WA0044_230506_135843.pdf18 May 2023
Disclosure of sold/ booked inventoryFile: sold unsold (1).pdf23 Jun 2022
Layout approvalFile: USHA PLAN 1.pdf31 May 2022
Layout approvalFile: USHA PLAN 2.pdf31 May 2022
Layout approvalFile: USHA PLAN 3.pdf31 May 2022
Layout approvalFile: USHA PLAN 4.pdf31 May 2022
Layout approvalFile: USHA PLAN 5.pdf31 May 2022
Layout approvalFile: USHA PLAN 6.pdf31 May 2022
Building plan approvalFile: USHA PLAN 1.pdf31 May 2022
Building plan approvalFile: USHA PLAN 2.pdf31 May 2022
Building plan approvalFile: USHA PLAN 3.pdf31 May 2022
Building plan approvalFile: USHA PLAN 4.pdf31 May 2022
Building plan approvalFile: USHA PLAN 5.pdf31 May 2022
Building plan approvalFile: USHA PLAN 6.pdf31 May 2022
Copy of Layout Approval (in case of layout)File: USHA PLAN 1.pdf31 May 2022
Copy of Layout Approval (in case of layout)File: USHA PLAN 2.pdf31 May 2022
Copy of Layout Approval (in case of layout)File: USHA PLAN 3.pdf31 May 2022
Copy of Layout Approval (in case of layout)File: USHA PLAN 4.pdf31 May 2022
Copy of Layout Approval (in case of layout)File: USHA PLAN 5.pdf31 May 2022
Copy of Layout Approval (in case of layout)File: USHA PLAN 6.pdf31 May 2022
Building Plan Approval / NA Order for plotted developmentFile: USHA PLAN 1.pdf31 May 2022
Building Plan Approval / NA Order for plotted developmentFile: USHA PLAN 2.pdf31 May 2022
Building Plan Approval / NA Order for plotted developmentFile: USHA PLAN 3.pdf31 May 2022
Building Plan Approval / NA Order for plotted developmentFile: USHA PLAN 4.pdf31 May 2022
Building Plan Approval / NA Order for plotted developmentFile: USHA PLAN 5.pdf31 May 2022
Building Plan Approval / NA Order for plotted developmentFile: USHA PLAN 6.pdf31 May 2022
CERSAI detailsFile: CERSAI Search Report NEW.pdf31 May 2022
Copy of the legal title reportFile: TITLE-ANUPAM compressed small.pdf26 May 2022
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 revised.pdf19 May 2022
Declaration about Commencement CertificateFile: Declartion of Commencement certificate.pdf14 May 2022
Proforma of Allotment letterFile: RERA Agreement.pdf13 May 2022
Proforma of Allotment letterFile: USHA-PROFORMA OF ALLOTMENT LETTER AS UPLOADED ON RERA.pdf13 May 2022
Declaration in FORM BFile: FORM B (1).pdf12 May 2022
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineers Certificate - Form 2 - Usha.pdf10 May 2022
Details of encumbrancesFile: EMCUMBRANCE REPORT.pdf7 May 2022
Commencement Certificates / NA Order for plotted developmentFile: Commencement certificate.pdf7 May 2022
PAN CardFile: D G LAND PAN CARD.pdf6 May 2022
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1.pdf6 May 2022

How this compares with Mumbai Suburban

33%of Mumbai Suburban projects moved their completion datethis one has not
21%of Mumbai Suburban registrations have lapsed or been cancelledthis one is on the register

Computed across the 6,700+ Mumbai Suburban projects on ReraGenie, from their own filings.

Free monthly report: Mumbai on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep SHEETAL USHA AND NISHA on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near MALAD WEST6,700+ in Mumbai Suburban

Builder: D G LAND DEVELOPERS PRIVATE LIMITED

D.G. LAND DEVELOPERS PRIVATE LIMITED has 15 registrations on MahaRERA, including SHEETAL ANIKET and SHEETAL OM JAY ARADHANA. Its filings disclose 6 earlier MahaRERA projects: declares 3 of 3 past projects completed on time. Read the full track record. See more projects on the Mumbai Suburban district page.

Frequently asked questions

What are my rights if SHEETAL USHA AND NISHA is delayed beyond 29 Apr 2027?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of SHEETAL USHA AND NISHA?

The registered promoter entity is D G LAND DEVELOPERS PRIVATE LIMITED, a company as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in SHEETAL USHA AND NISHA?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How do I read the complaint cases filed against SHEETAL USHA AND NISHA?

Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.

How current is the construction progress shown for SHEETAL USHA AND NISHA?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

What should I check before booking in SHEETAL USHA AND NISHA?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About SHEETAL USHA AND NISHA. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save SHEETAL USHA AND NISHA to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.