Home / Browse projects / SHEETAL PARK CO-OPERATIVE HOUSING SOCIETY LTD
SHEETAL PARK CO-OPERATIVE HOUSING SOCIETY LTD
RG-MH-05623 · RERA P52100077149 · Last updated on MahaRERA portal: 29 Apr 2026
Source: official MahaRERA filing
Or get an email each time it changes, with the project watch
Red flags
- No red flags in this filing
Clear
- No litigation declared
- No complaints on record
- Completion date never moved
- No encumbrance on the project land
- Separate project account declared
- Allotment letter follows the model form
- All 1 earlier projects delivered on promise
Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against the promoter's 12 other registrations and every project registered within 2 km.
See what the report covers Free either way: .Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
SHEETAL PARK CO-OPERATIVE HOUSING SOCIETY LTD is a Residential / Group Housing project by BELVALKAR HOUSING LLP in YERAWADA, 411006, registered with MahaRERA as P52100077149 on 23 Jul 2024. Possession is promised by 31 Mar 2028. 1 of the 37 units on this registration are recorded sold or booked, and 1 of 11 construction stages are filed complete.
At a glance
Project
- NameSHEETAL PARK CO-OPERATIVE HOUSING SOCIETY LTD
- TypeResidential / Group Housing
- Location
- KALYANI NAGAR
- YERAWADA
- 411006
- Pincode411006
- MapView location on Google Maps (as filed on RERA)
- RERA no.P52100077149
- ReraGenie IDRG-MH-05623
Builder
- NameBELVALKAR HOUSING LLP
- Entity typePartnership
- LLPINAAD-1077
- GSTIN27AAOFB7578A1Z8
- LLPIN and GSTIN are from this promoter's other MahaRERA registrations. This project's own filing does not repeat them.
- Designated PartnersNeel BELVALKAR, Sameer Sharatchandra Belvalkar
- Other registrations12 more →
- Completed1 of 13
- No longer live1 lapsed, de-registered or revoked
- Declared earlier projects1 →
Key dates
Key facts
Registration and timeline
- StatusRegistered
- Registered on23 Jul 2024
- Promised completion31 Mar 2028
- Revised completionNone
- Buildings1 building record
- Documents filed110 files
Current status
Figures as on 29 Apr 2026, this project's latest MahaRERA filing.
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| SHEETAL PARK CO-OPERATIVE HOUSING SOCIETY | NA | 16 | 14 | 37 | 0 | 37 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building1
As on 29 Apr 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
1 of 11 construction stages are filed complete. The stage furthest along is Basement (if any), at 80%.
SHEETAL PARK CO-OPERATIVE HOUSING SOCIETY: 18% average across the applicable activities
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 80% |
| Podiums (if any) | 0% |
| Plinth | 0% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 12% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 0% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 4% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
Progress on shared amenities15
As on 29 Apr 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | No | Not applicable |
| Water Supply | Yes | 0% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | No | Not applicable |
| Storm Water Drains | Yes | 0% |
| Landscaping & Tree Planting | No | Not applicable |
| Street Lighting | No | Not applicable |
| Community Buildings | No | Not applicable |
| Treatment And Disposal Of Sewage And Sullage Water | Yes | 0% |
| Solid Waste Management And Disposal | Yes | 0% |
| Water conservation /Rain water harvesting | Yes | 0% |
| Energy managemcnt | Yes | 0% |
| Fire protection and fire safety requirements | Yes | 0% |
| Electrical meter room, sub-station, receiving station | Yes | 0% |
| Aggregate area of recreational Open Space | No | Not applicable |
| Open Parking | Yes | 0% |
Parking filed71
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
Land and ownership1
MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.
| Landowner | Village | District |
|---|---|---|
| Sheetal Park CO Operative Housing Society Ltd | Pune (M Corp.) | Pune |
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
| Building | Wing | Estimated | Incurred |
|---|---|---|---|
| SHEETAL PARK CO-OPERATIVE HOUSING SOCIETY | NA | Rs 35.23 cr | Rs 2.76 cr |
| - | NA | Rs 3.99 cr | Rs 1.74 cr |
Certifying professionals and partners6
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | MANOJ TATOOSKAR |
| Architect | Siddharth Harischandrakar |
| Engineer | Vivek Chavan |
| Chartered Accountant | PB BILLIMORIA AND ASSCOIATES |
| Chartered Accountant | SPAK & Co. |
| Chartered Accountant | Bogati & Co. |
| Partner | Role in project |
|---|---|
| BELVALKAR HOUSING LLP | - |
Complaints filed with MahaRERA
No complaints on record against this registration.
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 30 Apr 2024 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 4 Apr 2024 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 6 Jul 2024 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 4 Apr 2024Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateNot due yet
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
possession is promised for 31 Mar 2028
Documents filed110
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 110 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Withdrawal Update Form 1File: FORM_01_Sheetal Park_Mar 26.pdf | 29 Apr 2026 |
| Withdrawal Update Form 2File: FORM_02_SHEETAL PARK_MAR 26.pdf | 29 Apr 2026 |
| Withdrawal Update Form 3File: FORM 3 MARCH 26-SHEETAL PARK.pdf | 29 Apr 2026 |
| Withdrawal Update Form 1File: FORM_01_SHEETAL PARK_DEC 25.pdf | 31 Jan 2026 |
| Withdrawal Update Form 2File: FORM_02_SHEETAL PARK_DEC 25.pdf | 31 Jan 2026 |
| Withdrawal Update Form 3File: FORM 3 DEC 2025 SHEETAL PARK.pdf | 31 Jan 2026 |
| Withdrawal Update Form 1File: FORM_01_SHEETAL PARK_SEPTu002725.pdf | 7 Nov 2025 |
| Withdrawal Update Form 1File: FORM_01_SHEETAL PARK_SEPTu002725.pdf | 7 Nov 2025 |
| Withdrawal Update Form 2File: FORM_02_SHEETAL PARK_SEPTu002725.pdf | 7 Nov 2025 |
| Withdrawal Update Form 2File: FORM_02_SHEETAL PARK_SEPTu002725.pdf | 7 Nov 2025 |
| Withdrawal Update Form 3File: FORM 3 SHEETAL PARK SEPT 2025.pdf | 7 Nov 2025 |
| Withdrawal Update Form 3File: FORM 3 SHEETAL PARK SEPT 2025.pdf | 7 Nov 2025 |
| Form 5 (FY 2024-2025)File: Sheetal Park Form 5.pdf | 5 Sep 2025 |
| Withdrawal Update Form 1File: FORM01_SHEETALPARK_Jun’25.pdf | 1 Sep 2025 |
| Withdrawal Update Form 2File: FORM02_SHEETALPARK_JUNu002725.pdf | 1 Sep 2025 |
| Withdrawal Update Form 3File: FORM 3 SHEETAL PARK.pdf | 1 Sep 2025 |
| Form 1File: FORM_01_SHEETALPARK_Sept'24.pdf | 3 Jun 2025 |
| Form 2File: FORM_02_ENGG CERTIFICATE SEPT'24.pdf | 3 Jun 2025 |
| Form 3File: FORM 3- SEPT 24.pdf | 3 Jun 2025 |
| Disclosure of Sold and Booked InventoryFile: DISCOLSURE OF SOLD ON Sep 2024.pdf | 3 Jun 2025 |
| Form 3File: FORM 3- MARCH 2025.pdf | 2 Jun 2025 |
| Disclosure of Sold and Booked InventoryFile: DISCOLSURE OF SOLD -SHEETALPARK 31-03-2025.pdf | 2 Jun 2025 |
| Form 1File: FORM_01_SHEETALPARK_MAR'25.pdf | 2 Jun 2025 |
| Form 2File: FORM 2 SHEETAL PARK MARCH 25.pdf | 2 Jun 2025 |
| Form 1File: FORM_1_SHEETAL_PARK_DEC'24.pdf | 31 May 2025 |
| Form 2File: Form 2 Engi Dec 2024.pdf | 31 May 2025 |
| Form 3File: FORM 3- DEC 24.pdf | 31 May 2025 |
| Disclosure of Sold and Booked InventoryFile: DISCOLSURE OF SOLD ON Dec 2024.pdf | 31 May 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM_01_SHEETALPARK_MAR'25.pdf | 5 May 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM_1_SHEETAL_PARK_DEC'24.pdf | 6 Mar 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Engi Dec 2024.pdf | 6 Mar 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3- SEPT 24.pdf | 10 Feb 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3- DEC 24.pdf | 10 Feb 2025 |
| Disclosure of sold/ booked inventoryFile: DISCOLSURE OF SOLD ON Sep 2024.pdf | 10 Feb 2025 |
| Disclosure of sold/ booked inventoryFile: DISCOLSURE OF SOLD ON Dec 2024.pdf | 10 Feb 2025 |
| Details of encumbrances concerned to FinanceFile: Nil Encumbarance Finance 20th July.pdf | 12 Jul 2024 |
| Details of encumbrances concerned to LegalFile: Nil Encumbarance Finance 20th July.pdf | 12 Jul 2024 |
| CERSAI detailsFile: CERSAI 20th july.pdf | 12 Jul 2024 |
| Other - TechnicalFile: Annexure A.pdf | 12 Jul 2024 |
| Building plan approvalFile: SP.pdf | 6 Jul 2024 |
| Building Plan Approval / NA Order for plotted developmentFile: SP.pdf | 6 Jul 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Sheetal Park_from 1.pdf | 6 Jul 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: sheetal Park Form 2.pdf | 6 Jul 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Sheetal Park Form 2 A.pdf | 6 Jul 2024 |
| Proforma of Agreement for saleFile: RERA ATS Sheetal Park.pdf | 6 Jul 2024 |
| Disclosure of Interest in Other Real Estate OrganizationsFile: Ann A SHITAL PARK_ASB.pdf | 3 Jul 2024 |
| Disclosure of Interest in Other Real Estate OrganizationsFile: ANN A SHITAL PARK_SSB.pdf | 3 Jul 2024 |
| Deviation Report with respect to model copy of AgreementFile: Agr Deviation Report SP.pdf | 3 Jul 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Sheetal Park Form-3.pdf | 22 Jun 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Sheetal Park Form-3.pdf | 22 Jun 2024 |
| Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: SHITAL PARK FORMAT A ACCOUNT.pdf | 20 May 2024 |
| Copy of the legal title reportFile: RERA format TSR Sheetal Park.pdf | 30 Apr 2024 |
| Details of encumbrances concerned to FinanceFile: no encumbrance Sheetal park .pdf | 19 Apr 2024 |
| Details of encumbrances concerned to LegalFile: no encumbrance Sheetal park .pdf | 19 Apr 2024 |
| Declaration about Commencement CertificateFile: shital park fomat d commmencement certificate.pdf | 19 Apr 2024 |
| Declaration in FORM BFile: shital park promoter form b.pdf | 19 Apr 2024 |
| Declaration in FORM BFile: shital park promoter form b.pdf | 19 Apr 2024 |
| Deviation Report with respect to Allotment letterFile: shital park no deviation allotment letter.pdf | 19 Apr 2024 |
| Proforma of Allotment letterFile: Allotment Letter RERA_Sheetal Park.pdf | 10 Apr 2024 |
| Other - LegalFile: Sheetal Park POA _Part1.pdf | 10 Apr 2024 |
| Other - LegalFile: Sheetal Park POA _Part2.pdf | 10 Apr 2024 |
| Other - LegalFile: Sheetal Park POA _Part3.pdf | 10 Apr 2024 |
| Other - LegalFile: Sheetal Park POA _Part4.pdf | 10 Apr 2024 |
| Other - LegalFile: Sheetal Park POA _Part5.pdf | 10 Apr 2024 |
| Other - LegalFile: Sheetal Park POA _Part6.pdf | 10 Apr 2024 |
| Other - LegalFile: Sheetal Park POA _Part8.pdf | 10 Apr 2024 |
| Other - LegalFile: Sheetal Park POA _Part8.pdf | 10 Apr 2024 |
| Other - LegalFile: Sheetal Park POA _Part9.pdf | 10 Apr 2024 |
| Other - LegalFile: Sheetal Park POA _Part10.pdf | 10 Apr 2024 |
| Other - LegalFile: Sheetal Park POA _Part11.pdf | 10 Apr 2024 |
| Other - LegalFile: Sheetal Park POA _Part12.pdf | 10 Apr 2024 |
| Other - LegalFile: Sheetal Park POA _Part13.pdf | 10 Apr 2024 |
| Other - LegalFile: Sheetal Park POA _Part14.pdf | 10 Apr 2024 |
| Other - LegalFile: Sheetal Park POA _Part15.pdf | 10 Apr 2024 |
| Other - LegalFile: Sheetal Park POA _Part16.pdf | 10 Apr 2024 |
| Other - LegalFile: Sheetal Park POA _Part17.pdf | 10 Apr 2024 |
| Other - LegalFile: Sheetal Park POA _Part18.pdf | 10 Apr 2024 |
| Other - LegalFile: Sheetal Park POA _Part19.pdf | 10 Apr 2024 |
| Other - LegalFile: Sheetal Park POA _Part20.pdf | 10 Apr 2024 |
| Other - LegalFile: Sheetal Park POA _Part21.pdf | 10 Apr 2024 |
Promoter's earlier projects1
As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.
| Project | Location | Flats | Registered | Status | Promised | Delivered |
|---|---|---|---|---|---|---|
| Kalpak Co Op Hsg SocietyP52100045697 | Kothrud, Pune | 23 | Jun 2022 | Completed | May 2024 | May 2024 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
Buyer report
Built from this project's filings on the day you order, in plain language.
- Red flags and clear checks, the possession story, sanctions and sales, land and title, who you are dealing with
- Joined against the promoter's 12 other registrations and every project registered within 2 km, which the RERA portal never shows together
- All 110 filed documents as one ZIP, foldered, with a manifest
- The project watch below, included free for 90 days
Project watch
Only want to be told when something changes?
- An email each time this filing moves: new sales, a moved possession date, an extension, a complaint, the occupancy certificate
- Plain words, conditions that have happened marked in red
- A summary of everything that changed when the 90 days end
Keep SHEETAL PARK CO-OPERATIVE HOUSING SOCIETY LT on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near YERAWADA
Filed coordinates, straight-line distance. 19 registered projects within 2 km.
VAISHNAVI OURANOS
VAISHNAVI & OM CONSTRUCTION
Nandanvan
NG Rathi Construction Private Limited
KALPANA CO OP HSG SOC LTD - PHASE 1
Bramhacorp Limited
UTTAM TOWNSCAPE LIFE HUB A,A1,B
FORTUNE DEVELOPERS AND INFRASTRUCTURES
VRUNDAVAN A WING
NG Rathi Promoters
White House A
CITY ETHERNAL LLP
Builder: BELVALKAR HOUSING LLP
BELVALKAR HOUSING LLP has 13 registrations on MahaRERA, including Snehshilp and Kalpak Co Op Hsg Society. Its filings disclose 1 earlier MahaRERA project: declares 1 of 1 past projects completed on time. Read the full track record.
Frequently asked questions
What are my rights if SHEETAL PARK CO-OPERATIVE HOUSING SOCIETY LTD is delayed beyond 31 Mar 2028?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of SHEETAL PARK CO-OPERATIVE HOUSING SOCIETY LTD?
The registered promoter entity is BELVALKAR HOUSING LLP, a partnership as per the filing. Its LLPIN AAD-1077 and GSTIN 27AAOFB7578A1Z8 can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in SHEETAL PARK CO-OPERATIVE HOUSING SOCIETY LTD?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How current is the construction progress shown for SHEETAL PARK CO-OPERATIVE HOUSING SOCIETY LTD?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at SHEETAL PARK CO-OPERATIVE HOUSING SOCIETY LTD?
The professionals named in the filing: Architect: MANOJ TATOOSKAR; Architect: Siddharth Harischandrakar; Engineer: Vivek Chavan; Chartered Accountant: PB BILLIMORIA AND ASSCOIATES; Chartered Accountant: SPAK & Co.; Chartered Accountant: Bogati & Co.. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in SHEETAL PARK CO-OPERATIVE HOUSING SOCIETY LTD?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback