Home / Browse projects / Mumbai Suburban, Maharashtra / SHASHITARA CHS LTD.

Registered No litigation declared Residential / Group Housing project

SHASHITARA CHS LTD.

By S S ENTERPRISES

RG-MH-30106 · RERA P51800029768 · Last updated on MahaRERA portal: 2 Apr 2026

Source: official MahaRERA filing

Red flags

  • Completion date moved by 48 months
  • 2 extensions taken

Clear

  • No litigation declared
  • No complaints on record
  • Separate project account declared
  • Allotment letter follows the model form

2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Mumbai Suburban registration emailed to you, free during the pilot beta.
Dec 2026Possession promisedmoved 48 months from the original
3 of 11Construction stages donefurthest along: Stilt Floor, 80%
0Complaints at MahaRERAon this registration
Jump to the 113 documents Report an error

SHASHITARA CHS LTD. is a Residential / Group Housing project by S S ENTERPRISES in Mumbai Suburban, Maharashtra, registered with MahaRERA as P51800029768 on 29 Jun 2021. Possession is promised by 31 Dec 2026. The completion date has moved by 48 months from the original filing.

At a glance

Project

  • NameSHASHITARA CHS LTD.
  • TypeResidential / Group Housing
  • Location
    • MARATHA COLONY INTERNAL ROAD
    • OFF: WAMANRAO SAWANT ROAD DAHISAR WEST
    • Borivali
    • Mumbai Suburban
    • 400068
  • Pincode400068
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51800029768
  • ReraGenie IDRG-MH-30106

Builder

  • NameS S ENTERPRISES
  • Entity typePartnership
  • PartnersSUBODH HARISH SAWANT, ANIL GANGARAM SAWANT
  • Other registrations8 more →
  • Completed2 of 9
  • No longer live1 lapsed, de-registered or revoked
  • Declared earlier projects1 →

Key dates

this monthRegisteredJun 2021First promiseDec 2022Revised toDec 2026

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on29 Jun 2021
  • Promised completion31 Dec 2026
  • Revised completionRevised to 31 Dec 2026 (originally 31 Dec 2022)
  • Buildings1 building record
  • Documents filed113 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
SHASHITARA CHS LTDNA44000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 2 Apr 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

3 of 11 construction stages are filed complete. The stage furthest along is Stilt Floor, at 80%.

SHASHITARA CHS LTD: 38% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor80%
Slabs of Super Structure40%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities16

As on 2 Apr 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes0%
Street LightingYes0%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterYes0%
Solid Waste Management And DisposalYes0%
Water conservation /Rain water harvestingYes0%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable
OtherNoNot applicable

Parking filed12

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots12
Closed/Covered12

Land and ownership1

MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area484 sq m
Land owned byThe promoter, with other names on the file
Named landowners1
LandownerVillageDistrict
SHASHITARA CO OPERATIVE HOUSING SOCIETIES LIMITEDBorivaliMumbai Suburban

Approvals and building plan

Sanctioning authorityMCGM
Permissible FSI1578.9
Proposed, not sanctioned1,579 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branch1,16,17 PANKAJ PARAG CHS , L T ROAD DAHISAR WEST MUMBAI 400068

Certifying professionals and partners3

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectPROPRIETOR
EngineerBAL GOVIND SHUKLA
Chartered AccountantBHARAT KANTILAL SHAH
PartnerRole in project
S S ENTERPRISES-

Extensions applied for2

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EXT51800013345Dec 2022 → Dec 2023

Reason as filed by the promoterAWAITING PROPOSED COMMENCEMENT CERTIFICATE FOR THE PROJECT. DELAY DUE TO LABOUR AND OTHER RELATED ISSUE

EXT51800019525Dec 2022 → Dec 2026

Reason as filed by the promoterDELAY DUE TO MISTAKE OF CONTRACTORS PLINTH TO BE RECONSTRUCTED AFTER CHANGE OF DESIGN, WHICH RESULTED IN CHANGE OF CONTRACTORS AND SETTLING OF REMARKS RAISED BY PROJECT ARCHITECT.

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 24 Jun 2021
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 23 Dec 2024
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 15 Jun 2021
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 14 Jun 2021Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Dec 2026

Documents filed113

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 113 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Form 1File: FROM 1 SEP 25.pdf2 Apr 2026
Form 2File: FROM 2 SEP 25.pdf2 Apr 2026
Form 3File: FORM 3 NEW 30092025.pdf2 Apr 2026
Disclosure of Sold and Booked InventoryFile: Disclosure of sold Booked Inventory 30092025.pdf2 Apr 2026
OthersFile: FROM 2A SEP 25.pdf2 Apr 2026
Form 1File: FROM 1 DEC 25.pdf2 Apr 2026
Form 2File: FROM 2 DEC 25.pdf2 Apr 2026
Form 3File: FORM 3 NEW 31122025.pdf2 Apr 2026
Disclosure of Sold and Booked InventoryFile: Disclosure of sold Booked Inventory 31122025.pdf2 Apr 2026
OthersFile: FROM 2A DEC 25.pdf2 Apr 2026
Form 1File: FORM 1 30062025.pdf10 Mar 2026
Form 2File: FORM 2 30062025.pdf10 Mar 2026
Form 3File: FORM 3 NEW 30062025.pdf10 Mar 2026
Disclosure of Sold and Booked InventoryFile: Disclosure of sold Booked Inventory 30062025.pdf10 Mar 2026
OthersFile: FORM 2A 30062025.pdf10 Mar 2026
Form 1File: FORM 1 31032025.pdf12 Feb 2026
Form 2File: FORM 2 31032025.pdf12 Feb 2026
Form 3File: FORM 3 NEW 31032025.pdf12 Feb 2026
Disclosure of Sold and Booked InventoryFile: DISCLOSURE OF SOLD BOOKED INVENTARY 310325.pdf12 Feb 2026
OthersFile: FORM 2A 31032025.pdf12 Feb 2026
FORM 2 DEC 202429 Apr 2025
FORM 2 MAR 202529 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 NEW 31122024.pdf21 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 NEW 31032025.pdf21 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 NEW 30092024-Revised.pdf18 Jan 2025
Disclosure of sold/ booked inventoryFile: Sold Book Inventory Final.pdf18 Jan 2025
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: FORM 5 -Revised.pdf15 Jan 2025
Layout approvalFile: 2nd CC 1ST FLOOR TO 3RD FLOOR.pdf23 Dec 2024
Copy of Layout Approval (in case of layout)File: 2nd CC 1ST FLOOR TO 3RD FLOOR.pdf23 Dec 2024
Declaration in FORM BFile: FORM B.pdf23 Dec 2024
Disclosure of sold/ booked inventoryFile: Disclosure of sold-Booked Inventory.pdf23 Dec 2024
Other - TechnicalFile: PERT.pdf23 Dec 2024
Other - TechnicalFile: Flow Chart.pdf5 Dec 2024
Disclosure for secured/unsecured finance availed for the projectFile: unsecured loan.pdf5 Dec 2024
Declaration in FORM BFile: FORM B.pdf30 Nov 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 30092024.pdf30 Nov 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2017-18)File: FORM 5 31032018.pdf30 Nov 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 30092024.pdf30 Nov 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 30062024.pdf30 Nov 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 31032024.pdf30 Nov 2024
Status of Formation of Legal Entity (Society/Co Op etc.)File: SOCIETY REGISTRATION CERTIFICATE.pdf30 Nov 2024
Status of ConveyanceFile: CONVEYANCE DEED DEEMED UNILATERAL.pdf30 Nov 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: FORM 2A 31032020.pdf30 Nov 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)File: FORM 5 31032019.pdf30 Nov 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: FORM 5 31032020.pdf30 Nov 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: FORM 5 31032021.pdf30 Nov 2024
Disclosure of sold/ booked inventoryFile: Disclosure of Sold Booked Inventory.pdf30 Nov 2024
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Separate Bank Account details including no encumbrances on the Bank Account or no escrow o30 Nov 2024
Deviation Report with respect to Allotment letterFile: Allotment Letter.pdf30 Nov 2024
Deviation Report with respect to model copy of AgreementFile: Agreement for Sale.pdf30 Nov 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: DISCLOSURE OF INTEREST IN ANY OTHER PROJECT.pdf30 Nov 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: FORM 2A 31032024.pdf30 Nov 2024
Other - TechnicalFile: Reply to show cause notice.pdf25 Nov 2024
Declaration in FORM BFile: FORM B.pdf30 Oct 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 31032024.pdf30 Oct 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 30092024.pdf30 Oct 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 NEW 31032024.pdf30 Oct 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 NEW 30062024.pdf30 Oct 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 NEW 30092024.pdf30 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 31032024.pdf30 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 30092024.pdf30 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 30062024.pdf30 Oct 2024
Disclosure of sold/ booked inventoryFile: Disclosure of sold-Booked Inventory.pdf30 Oct 2024
CERSAI detailsFile: UNDERTAKING.pdf30 Oct 2024
Other - TechnicalFile: BDASRO.pdf30 Oct 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: FORM 5 31032024.pdf30 Oct 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Architect Certificate.pdf5 Apr 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 ENGINEER CERTIFICATE.pdf5 Apr 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: ANNEXURE C.pdf5 Apr 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 NEW 31122022.pdf5 Apr 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 NEW 31032023.pdf5 Apr 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 NEW 30062023.pdf5 Apr 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 NEW 30092023.pdf5 Apr 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 NEW 31122023.pdf5 Apr 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: FORM 5 31032023.pdf5 Apr 2024
Details of encumbrancesFile: 1.pdf7 Jan 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 NEW 30062021.pdf7 Jan 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 NEW 30092021.pdf7 Jan 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 NEW 31122021.pdf7 Jan 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 NEW 31032022.pdf7 Jan 2023

How this compares with Mumbai Suburban

33%of Mumbai Suburban projects moved their completion datethis one moved by 48 months
21%of Mumbai Suburban registrations have lapsed or been cancelledthis one is on the register

Computed across the 6,700+ Mumbai Suburban projects on ReraGenie, from their own filings.

Free monthly report: Mumbai on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep SHASHITARA CHS LTD. on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near OFF: WAMANRAO SAWANT ROAD DAHISAR WEST6,700+ in Mumbai Suburban

2 kmSHASHITARA CHS LTD.Completed 67Lapsed / revoked 42Other 92Dot size: filed unitsN

Filed coordinates, straight-line distance. 201 registered projects within 2 km.

Builder: S S ENTERPRISES

S S Enterprises has 9 registrations on MahaRERA, including IT Square and APEX PARIJAT PHASE III. Its filings disclose 1 earlier MahaRERA project: declares 1 of 1 past projects completed on time. Read the full track record. See more projects on the Mumbai Suburban district page.

Frequently asked questions

What are my rights if SHASHITARA CHS LTD. is delayed beyond 31 Dec 2026?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of SHASHITARA CHS LTD.?

The registered promoter entity is S S ENTERPRISES, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in SHASHITARA CHS LTD.?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for SHASHITARA CHS LTD.?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at SHASHITARA CHS LTD.?

The professionals named in the filing: Architect: PROPRIETOR; Engineer: BAL GOVIND SHUKLA; Chartered Accountant: BHARAT KANTILAL SHAH. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in SHASHITARA CHS LTD.?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About SHASHITARA CHS LTD.. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save SHASHITARA CHS LTD. to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.