ReraGenieLog inGet a buyer report

Home / Browse projects / Mumbai Suburban, Maharashtra / SHARAD APARTMENTS CHS LTD

Completed No litigation declared Residential / Group Housing project

SHARAD APARTMENTS CHS LTD

By AAKAR CONSTRUCTIONS

RG-MH-19698 · RERA P51800003282 · Last updated on MahaRERA portal: 20 Jan 2025

Source: official MahaRERA filing

Red flags

  • 1 complaint at MahaRERA
  • Completion date moved by 52 months
  • 2 extensions taken

Clear

  • No litigation declared
  • Separate project account declared
  • Allotment letter follows the model form
  • Recorded completed on MahaRERA

3 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Mumbai Suburban registration emailed to you, free during the pilot beta.
Apr 2022Possession promisedregistration recorded completed
10 of 11Construction stages donefurthest along: Podiums (if any), 0%
1Complaints at MahaRERAon this registration
Jump to the 50 documents Report an error

SHARAD APARTMENTS CHS LTD is a Residential / Group Housing project by AAKAR CONSTRUCTIONS in Mumbai Suburban, Maharashtra, registered with MahaRERA as P51800003282 on 5 Aug 2017. The registration is recorded completed; possession was promised by 5 Apr 2022. The completion date has moved by 52 months from the original filing. 1 complaint is on record with the regulator.

At a glance

Project

  • NameSHARAD APARTMENTS CHS LTD
  • TypeResidential / Group Housing
  • Location
    • Borivali
    • Mumbai Suburban
    • 400104
  • Pincode400104
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51800003282
  • ReraGenie IDRG-MH-19698

Builder

  • NameAAKAR CONSTRUCTIONS
  • Entity typePartnership
  • PartnersKANTILAL GUNSHI GADA, ARUNA RAJENDRA SHAH
  • Other registrations4 more →
  • Completed4 of 5
  • Declared earlier projects5 →

Key dates

this monthRegisteredAug 2017First promiseDec 2017Revised toApr 2022Recorded completed

Key facts

Registration and timeline

  • StatusCompleted
  • Registered on5 Aug 2017
  • Promised completion5 Apr 2022
  • Revised completionRevised to 5 Apr 2022 (originally 31 Dec 2017)
  • Buildings1 building record
  • Documents filed50 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
SHARAD APARTMENTSNA170000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 20 Jan 2025, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

10 of 11 construction stages are filed complete. The stage furthest along is Podiums (if any), at 0%.

SHARAD APARTMENTS: 91% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Progress on shared amenities15

As on 20 Jan 2025, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes100%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsYes100%
Landscaping & Tree PlantingYes100%
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalYes100%
Water conservation /Rain water harvestingYes100%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes100%
Electrical meter room, sub-station, receiving stationYes100%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingYes100%

Parking filed20

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots20
Closed/Covered1
Open Space19

Land and ownership1

MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area884 sq m
Land owned byThe promoter, with other names on the file
Named landowners1
LandownerVillageDistrict
SHARAD APARTMENTS CHS LTDBorivaliMumbai Suburban

Approvals and building plan

Permissible FSI2382.14
Proposed, not sanctioned2,382 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchEVERSHINE ANGAN PLOT NO 4 JAWAHAR NAGAR S V ROAD GOREGAON WEST MUMBAI 400104

Certifying professionals and partners2

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectMR ASHIM KHATRI
EngineerMR VATSAL HARSHAD GOKANI
PartnerRole in project
AAKAR CONSTRUCTIONS-

Extensions applied for2

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EXT51800002309Dec 2017 → Apr 2020

Reason as filed by the promoterMATTER PENDING AT ARBITRATION DUE TO DISPUTE AMONGST PATRNERS/PROMOTERS

EXT51800009063Dec 2017 → Apr 2022

Reason as filed by the promoterWe have successfully obtained Occupation certificate dated 05-04-2022.

Litigation declared1

CaseCourtStatus
1402/2014CITY CIVIL COURT DINDOSHI GOREGAON EAST MUMBAIHEARING IN PROGRESS

Complaints filed with MahaRERA1

Case no.ComplainantRespondentFiled
CC006000000055478Rajesh Mistry & othersAakar Construction23/07/2018

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 22 Jul 2017
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 29 Jul 2017
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 29 Jul 2017
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 28 Jul 2017Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateOn the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    uploaded 8 Nov 2024

Documents filed50

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Architect’s Certificate on Completion of Project (Form 4)File: -SHARAD APARTMENT-0345 Form 4.pdf20 Jan 2025
Architect’s Certificate on Completion of Project (Form 4)File: -SHARAD APARTMENT-0345 Form 4.pdf25 Dec 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: form 2 01 04 2021 to 31 03 2022.pdf24 Dec 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 1 4 2020 to 31 03 21.pdf24 Dec 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 1 04 2019 to 31 03 2020.pdf24 Dec 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 01 04 18 to 31 03 19.pdf24 Dec 2024
Certificates of CA (Form 3)File: AAKAR CONSTRUCTIONS- FORM 3 2018-19_compressed.pdf21 Dec 2024
Certificates of CA (Form 3)File: AAKAR CONSTRUCTIONS- FORM 3 -2019-20_compressed.pdf21 Dec 2024
Certificates of CA (Form 3)File: AAKAR CONSTRUCTIONS- FORM 3-2020-21_compressed.pdf21 Dec 2024
Certificates of CA (Form 3)File: AAKAR CONSTRUCTIONS- FORM 3-2021-22_compressed.pdf21 Dec 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)File: FORM NO 05 AAKAR CONSTRUCTIONS FY 2018 19.pdf21 Dec 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: FORM NO 05 AAKAR CONSTRUCTIONS FY 2019 20.pdf21 Dec 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: FORM NO 05 AAKAR CONSTRUCTIONS FY 2020 21.pdf21 Dec 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: FORM NO 05 AAKAR CONSTRUCTIONS F Y 2021 22.pdf21 Dec 2024
Disclosure of sold/ booked inventoryFile: Disclosure of Sols Unsold Inventory.pdf13 Dec 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Sharad - Form 1.pdf4 Dec 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Sharad- 2A quality assurance 20-21.pdf4 Dec 2024
Disclosure of sold/ booked inventoryFile: Disclosure - sold unsold inventory.pdf4 Dec 2024
Declaration about Commencement CertificateFile: Sharad- Declaration about CC.pdf4 Dec 2024
CERSAI detailsFile: Aakar constructions- cersai.pdf4 Dec 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: Sharad- 2A- Quality assurance- 21-22.pdf4 Dec 2024
Architect’s Certificate on Completion of Project (Form 4)File: -SHARAD APARTMENT-0345 Form 4.pdf10 Nov 2024
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: SHARAD -OC_signed.pdf8 Nov 2024
Certificates of CA (Form 5)File: SHARAD FORM 5.pdf15 Oct 2018
Proforma of Allotment letterFile: ALLOTTMENT LETTER SHARAD.pdf30 Jul 2017
Proforma of Allotment letterFile: SALE AGREEMENT RERA SHARAD.pdf30 Jul 2017
Building plan approvalFile: comp plan 1.pdf29 Jul 2017
Layout approvalFile: comp plan 4.pdf29 Jul 2017
Building plan approvalFile: comp plan 4.pdf29 Jul 2017
Building plan approvalFile: comp plan 2.pdf29 Jul 2017
Layout approvalFile: comp plan 1.pdf29 Jul 2017
Layout approvalFile: comp plan 2.pdf29 Jul 2017
Layout approvalFile: comp plan 3.pdf29 Jul 2017
Building plan approvalFile: comp plan 3.pdf29 Jul 2017
Details of encumbrancesFile: ENCUMBRANCE LETTER.pdf29 Jul 2017
Copy of Layout Approval (in case of layout)File: comp plan 1.pdf29 Jul 2017
Copy of Layout Approval (in case of layout)File: comp plan 2.pdf29 Jul 2017
Copy of Layout Approval (in case of layout)File: comp plan 3.pdf29 Jul 2017
Copy of Layout Approval (in case of layout)File: comp plan 4.pdf29 Jul 2017
Building Plan Approval (IOD)File: comp plan 1.pdf29 Jul 2017
Building Plan Approval (IOD)File: comp plan 2.pdf29 Jul 2017
Building Plan Approval (IOD)File: comp plan 3.pdf29 Jul 2017
Building Plan Approval (IOD)File: comp plan 4.pdf29 Jul 2017
Declaration in FORM BFile: FORM B PROMOTER.pdf29 Jul 2017
Certificates of CA (Form 3)File: C A CERTIFICATE.pdf29 Jul 2017
Commencement Certificates / NA Order for plotted developmentFile: CC pdf.pdf28 Jul 2017
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect Certificate.pdf28 Jul 2017
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineer cert 1.pdf28 Jul 2017
PAN CardFile: PAN CARD PDF.pdf22 Jul 2017
Copy of the legal title reportFile: TITLE CERTIFICATE.pdf22 Jul 2017

Promoter's earlier projects2

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

2 delivered late
ProjectLocationFlatsStatusPromisedDelivered
ABHISHEK CHS LTDPLOT NO. 39 JAYPRAKASH NAGAR ROAD NO 3 GOREGAON EAST MUMBAI 40006316CompletedJun 2015Late, Nov 2015
NAV SUDHIR CHS LTDPLOT NO 113 L T ROAD NO 6 OFF M G ROAD GOREGAON WEST MUMBAI 40010421CompletedMay 2013Late, Jul 2013

How this compares with Mumbai Suburban

33%of Mumbai Suburban projects moved their completion datethis one moved by 52 months
21%of Mumbai Suburban registrations have lapsed or been cancelledthis one is completed

Computed across the 6,700+ Mumbai Suburban projects on ReraGenie, from their own filings.

Free monthly report: Mumbai on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep SHARAD APARTMENTS CHS LTD on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Borivali6,700+ in Mumbai Suburban

2 kmSHARAD APARTMENTS CHS LTCompleted 135Lapsed / revoked 62Other 139Dot size: filed unitsN

Filed coordinates, straight-line distance. 336 registered projects within 2 km.

Builder: AAKAR CONSTRUCTIONS

AAKAR CONSTRUCTIONS has 5 registrations on MahaRERA, including SHARAD APARTMENTS CHS LTD and PAI NIWAS. Its filings disclose 5 earlier MahaRERA projects: declares 0 of 4 past projects completed on time. Read the full track record. See more projects on the Mumbai Suburban district page.

Frequently asked questions

What are my rights if SHARAD APARTMENTS CHS LTD is delayed beyond 5 Apr 2022?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of SHARAD APARTMENTS CHS LTD?

The registered promoter entity is AAKAR CONSTRUCTIONS, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in SHARAD APARTMENTS CHS LTD?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How do I read the complaint cases filed against SHARAD APARTMENTS CHS LTD?

Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.

How current is the construction progress shown for SHARAD APARTMENTS CHS LTD?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at SHARAD APARTMENTS CHS LTD?

The professionals named in the filing: Architect: MR ASHIM KHATRI; Engineer: MR VATSAL HARSHAD GOKANI. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in SHARAD APARTMENTS CHS LTD?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About SHARAD APARTMENTS CHS LTD. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save SHARAD APARTMENTS CHS LTD to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.