Home / Browse projects / Palghar, Maharashtra / SHANTI HEIGHTS

Registered No litigation declared Residential / Group Housing project

SHANTI HEIGHTS

By SADGURU BUILDERS AND DEVELOPERS

RG-MH-30307 · RERA P99000030943 · Last updated on MahaRERA portal: 16 Jun 2026

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form

Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against the promoter's 4 other registrations and every project registered within 2 km.

See what the report covers Free either way: or have every new Palghar registration emailed to you, free during the pilot beta.
Dec 2026Possession promisedno revision filed
9 of 11Construction stages donefurthest along: Basement (if any), 0%
24 of 43Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 73 documents Report an error

SHANTI HEIGHTS is a Residential / Group Housing project by SADGURU BUILDERS AND DEVELOPERS in Palghar, Maharashtra, registered with MahaRERA as P99000030943 on 29 Sep 2021. Possession is promised by 31 Dec 2026. 19 of the 43 units on this registration are recorded sold or booked, and 9 of 11 construction stages are filed complete.

At a glance

Project

  • NameSHANTI HEIGHTS
  • TypeResidential / Group Housing
  • Location
    • CHALPETH ROAD
    • AGASHI
    • Vasai-Virar City (M Corp)
    • Vasai
    • Palghar
    • 401301
  • Pincode401301
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P99000030943
  • ReraGenie IDRG-MH-30307

Builder

  • NameSADGURU BUILDERS AND DEVELOPERS
  • Entity typePartnership
  • GSTIN27ACIFS3244G1Z2
  • PartnersJATIN BHALCHANDRA DESAI, TUSHAR PANDURANG DESAI
  • Other registrations4 more →
  • Completed2 of 5
  • No longer live1 lapsed, de-registered or revoked

Key dates

this monthRegisteredSep 2021PromisedDec 2026

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on29 Sep 2021
  • Promised completion31 Dec 2026
  • Revised completionNone
  • Buildings1 building record
  • Documents filed73 files

Current status

44%19 of 43 units booked
95.4%Work done, per cost certificate

Figures as on 16 Jun 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
SHANTI HEIGHTSNA151443043

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 16 Jun 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

9 of 11 construction stages are filed complete. The stage furthest along is Basement (if any), at 0%.

SHANTI HEIGHTS: 82% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Progress on shared amenities15

As on 16 Jun 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes100%
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsYes100%
Landscaping & Tree PlantingYes100%
Street LightingYes0%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes100%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes100%
Electrical meter room, sub-station, receiving stationYes100%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Parking filed91

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots91
Closed/Covered26
Open Space65

Land and ownership

Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area1,750 sq m
Land owned byThe promoter
Named landownersNone
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on8 Jun 2026

Approvals and building plan

Sanctioning authorityvasai virar city municipal corporation
Permissible FSI3858.82
Proposed, not sanctioned3,859 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchSUVARTA SADAN,AGASHI TAL VASAI VIRAR WEST
Estimated costRs 12.16 cr
Cost incurredRs 11.61 cr
Work done95.42%
BuildingWingEstimatedIncurred
SHANTI HEIGHTSNARs 12.07 crRs 11.52 cr
-NARs 9.00 lakhRs 9.00 lakh

Certifying professionals and partners5

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectABHAY RAUT
EngineerPARESH UNNARKAR
EngineerMUFADDAL MERCHANT
Chartered AccountantP P BARAPATRE & CO
Chartered AccountantCHRYSTAL LOPES & CO
PartnerRole in project
SADGURU BUILDERS AND DEVELOPERS-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 20 Apr 2023
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 20 Jul 2021
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 20 Jul 2021
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 6 Sep 2023Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Dec 2026

Documents filed73

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: FORM 1.pdf16 Jun 2026
Withdrawal Update Form 2File: FORM 2.pdf16 Jun 2026
Withdrawal Update Form 3File: FORM 3.pdf16 Jun 2026
Form 5 (FY 2021-2022)File: FORM 5 2122.pdf11 Jun 2026
Form 5 (FY 2022-2023)File: FORM 5 2223.pdf11 Jun 2026
Form 5 (FY 2023-2024)File: FORM 5 2324.pdf11 Jun 2026
Form 5 (FY 2024-2025)File: FORM 5 202425.pdf11 Jun 2026
Form 1File: FORM 1 JUNE25_compressed.pdf6 Jun 2026
Form 2File: FORM 2 JUNE25_compressed.pdf6 Jun 2026
Form 3File: FORM 3 JUNE25_compressed.pdf6 Jun 2026
Disclosure of Sold and Booked InventoryFile: 30-6-25 sold unsold.pdf6 Jun 2026
Form 1File: FORM 1 SEPT25.pdf6 Jun 2026
Form 2File: FORM 2 SEPT25.pdf6 Jun 2026
Form 3File: FORM 3 SEPT25.pdf6 Jun 2026
Disclosure of Sold and Booked InventoryFile: 30-9-25 sold unsold list.pdf6 Jun 2026
Form 1File: FORM 1 DEC25.pdf6 Jun 2026
Form 2File: FORM 2 DEC25.pdf6 Jun 2026
Form 3File: FORM 3 DEC25.pdf6 Jun 2026
Disclosure of Sold and Booked InventoryFile: 31-12-25 sold unsold list.pdf6 Jun 2026
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 31-12-24-FORM 1.pdf9 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 31-12-24-FORM 3.pdf9 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 31-12-24-FORM 2.pdf9 Apr 2025
Disclosure of sold/ booked inventoryFile: SOLD UNSOLD 31-12-24.pdf9 Apr 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 30-6-24.pdf15 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 30-9-24.pdf15 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 30-6-24 FINAL.pdf15 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 30-9-24 FINAL.pdf15 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 30-6-24.pdf15 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 30-9-24.pdf15 Jan 2025
Disclosure of sold/ booked inventoryFile: SOLD UNSOLD RERA FINAL.pdf15 Jan 2025
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: 23-24 (1).pdf20 Jun 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: form 1.pdf2 May 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: form 2.pdf2 May 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: form 3 (1).pdf2 May 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 31-12-23- FORM 1.pdf18 Apr 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2.pdf18 Apr 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 31-12-23.pdf18 Apr 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 31-12- 23 dtd 23-2-24 CA CERTIFICATE.pdf18 Apr 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: 21-22.pdf18 Apr 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: FORM 5 22-23 COMPRESS.pdf2 Mar 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: form 1 4 oct'23.pdf24 Nov 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: form 2 dtd 30-9-23_compressed.pdf24 Nov 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: form 2 dtd 30-9-23_compressed.pdf24 Nov 2023
Commencement Certificates / NA Order for plotted developmentFile: CC-30-6-22 7TH TO 14TH FLOOR.pdf6 Sep 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: form 1 5-7-23.pdf6 Sep 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 30-6-23-1.pdf6 Sep 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 31-3-23-1.pdf6 Sep 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1.pdf28 Apr 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2.pdf28 Apr 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3.pdf28 Apr 2023
Copy of the legal title reportFile: Legal Title Report 110223(a).pdf20 Apr 2023
OtherFile: D A PAGE NO 01 TO 07.pdf17 Sep 2021
OtherFile: D A PAGE NO 08-12.pdf17 Sep 2021
OtherFile: D A PAGE NO 13 TO 20.pdf17 Sep 2021
OtherFile: D A PAGE NO 21-28.pdf17 Sep 2021
OtherFile: D A PAGE NO 29 TO 37.pdf17 Sep 2021
OtherFile: D A PAGE NO 38 TO 45.pdf17 Sep 2021
OtherFile: D A PAGE NO 46 TO 54.pdf17 Sep 2021
Copy of the legal title reportFile: LEGAL AND TITLE SEARCH.pdf13 Sep 2021
Proforma of Allotment letterFile: Agreement for sale.pdf30 Aug 2021
Declaration about Commencement CertificateFile: DECLATION OF COMMENCEMENT CERTIFICATE.pdf31 Jul 2021
Details of encumbrancesFile: NO ENCUMBENCES.pdf29 Jul 2021
Declaration in FORM BFile: FORM B RERA_compressed.pdf29 Jul 2021
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3.pdf29 Jul 2021
Proforma of Allotment letterFile: ALLOTMENT LETTER.pdf29 Jul 2021
Building plan approvalFile: BLDG NO 02 CC SHANTI HEIGHT_11zon (1).pdf20 Jul 2021
Layout approvalFile: LAYOUT PLAN SHANTI HEIGHTS_11zon.pdf20 Jul 2021
PAN CardFile: PAGE.PDF20 Jul 2021
Copy of Layout Approval (in case of layout)File: LAYOUT PLAN SHANTI HEIGHTS_11zon.pdf20 Jul 2021
Building Plan Approval / NA Order for plotted developmentFile: BLDG NO 02 CC SHANTI HEIGHT_11zon (1).pdf20 Jul 2021
Commencement Certificates / NA Order for plotted developmentFile: Commencement Certificates _ NA Order for plotted development.pdf20 Jul 2021
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ARCHITECT FORM 1.pdf20 Jul 2021
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ENGINEER FORM 2.pdf20 Jul 2021

How this compares with Palghar

44%of this project is bookeddistrict median 25%
31%of Palghar projects moved their completion datethis one has not
26%of Palghar registrations have lapsed or been cancelledthis one is on the register

Computed across the 3,200+ Palghar projects on ReraGenie, from their own filings.

Free monthly report: Vasai-Virar and Palghar on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep SHANTI HEIGHTS on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near AGASHI3,200+ in Palghar

2 kmSHANTI HEIGHTSCompleted 7Lapsed / revoked 4Other 20Dot size: filed unitsN

Filed coordinates, straight-line distance. 31 registered projects within 2 km.

Builder: SADGURU BUILDERS AND DEVELOPERS

SADGURU BUILDERS AND DEVELOPERS has 5 registrations on MahaRERA, including SHANTI ENCLAVE and Sadguru Garden. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Palghar district page.

Frequently asked questions

What are my rights if SHANTI HEIGHTS is delayed beyond 31 Dec 2026?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of SHANTI HEIGHTS?

The registered promoter entity is SADGURU BUILDERS AND DEVELOPERS, a partnership as per the filing. Its GSTIN 27ACIFS3244G1Z2 can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in SHANTI HEIGHTS?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for SHANTI HEIGHTS?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at SHANTI HEIGHTS?

The professionals named in the filing: Architect: ABHAY RAUT; Engineer: PARESH UNNARKAR; Engineer: MUFADDAL MERCHANT; Chartered Accountant: P P BARAPATRE & CO; Chartered Accountant: CHRYSTAL LOPES & CO. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in SHANTI HEIGHTS?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About SHANTI HEIGHTS. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save SHANTI HEIGHTS to a free account