Home / Browse projects / Palghar, Maharashtra / SQUARE HOMES

Registered No litigation declared Residential / Group Housing project

SQUARE HOMES

By RAMESH CHAMPAKLAL JAIN

RG-MH-07123 · RERA P99000055485 · Last updated on MahaRERA portal: 21 May 2026

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form
  • All 4 earlier projects delivered on promise

Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against every project registered within 2 km.

See what the report covers Free either way: or have every new Palghar registration emailed to you, free during the pilot beta.
Dec 2027Possession promisedno revision filed
3 of 11Construction stages donefurthest along: Slabs of Super Structure, 36%
182 of 194Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 73 documents Report an error

SQUARE HOMES is a Residential / Group Housing project by RAMESH CHAMPAKLAL JAIN in Palghar, Maharashtra, registered with MahaRERA as P99000055485 on 2 Apr 2024. Possession is promised by 31 Dec 2027. 12 of the 194 units on this registration are recorded sold or booked, and 3 of 11 construction stages are filed complete.

At a glance

Project

  • NameSQUARE HOMES
  • TypeResidential / Group Housing
  • Location
    • PURA PADA ROAD
    • AGASHI
    • Vasai-Virar City (M Corp)
    • Vasai
    • Palghar
    • 401301
  • Pincode401301
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P99000055485
  • ReraGenie IDRG-MH-07123

Builder

  • NameRAMESH CHAMPAKLAL JAIN
  • Entity typeIndividual
  • Declared earlier projects2 →

Key dates

this monthRegisteredApr 2024PromisedDec 2027

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on2 Apr 2024
  • Promised completion31 Dec 2027
  • Revised completionNone
  • Buildings1 building record
  • Documents filed73 files

Current status

6%12 of 194 units booked
33.0%Work done, per cost certificate

Figures as on 21 May 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
GREEN VALLEYNA15151886194

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 21 May 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

3 of 11 construction stages are filed complete. The stage furthest along is Slabs of Super Structure, at 36%.

GREEN VALLEY: 31% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure36%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 21 May 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes0%
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes0%
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalYes0%
Water conservation /Rain water harvestingYes0%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingYes0%

Parking filed126

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots126
Closed/Covered48
Open Space78

Land and ownership14

MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area2,218 sq m
Land owned byThe promoter, with other names on the file
Named landowners14
LandownerVillageDistrict
BHASKAR NARAYAN PATILVasai-Virar City (M Corp)Palghar
HARESHWAR NARAYAN PATILVasai-Virar City (M Corp)Palghar
NANDA SUDHIR KINIVasai-Virar City (M Corp)Palghar
MADHUKAR LAXMAN PATILVasai-Virar City (M Corp)Palghar
SADANAND LAXMAN PATILVasai-Virar City (M Corp)Palghar
AMOL LAXMAN PATILVasai-Virar City (M Corp)Palghar
HANSAVATI BHARAT PATILVasai-Virar City (M Corp)Palghar
JAYESH BHARAT PATILVasai-Virar City (M Corp)Palghar
YOGESH BHARAT PATILVasai-Virar City (M Corp)Palghar
VASANT VITTHAL MHATREVasai-Virar City (M Corp)Palghar
NARAYAN DAMODAR MHATREVasai-Virar City (M Corp)Palghar
RAMAKANT VITTHAL MHATREVasai-Virar City (M Corp)Palghar
SURESH DAMODAR MHATREVasai-Virar City (M Corp)Palghar
AVINASH DAMODAR PATILVasai-Virar City (M Corp)Palghar

Approvals and building plan

Sanctioning authorityVasai Virar City Municipal Corporation
Permissible FSI9112.23
Proposed, not sanctioned9,112 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchICICI Bank Ltd - Shop No 7 and 8/GF, Premium Park, Agashi Road, Virar W, Thane - 401303
Estimated costRs 25.30 cr
Cost incurredRs 8.34 cr
Work done32.97%
BuildingWingEstimatedIncurred
GREEN VALLEYNARs 24.79 crRs 8.34 cr
-NARs 50.60 lakh-

Certifying professionals and partners3

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectHimesh Gupta & Associates
EngineerSK Consultants & Engineers
Chartered AccountantNB Sayed & Associates
PartnerRole in project
RAMESH CHAMPAKLAL JAIN-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 29 Jan 2024
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 25 Nov 2023
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 25 Nov 2023
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 24 Nov 2023Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Dec 2027

Documents filed73

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: Form 1 - Square Homes as on March 2026.pdf21 May 2026
Withdrawal Update Form 2File: Form 2 - Square Homes as on March 2026.pdf21 May 2026
Withdrawal Update Form 3File: Form 3 - Square Homes as on March 2026.pdf21 May 2026
Withdrawal Update Form 1File: Form 1 - Square Homes as on Sep 2025.pdf24 Feb 2026
Withdrawal Update Form 1File: Form 1 - Square Homes as on Dec 2025.pdf24 Feb 2026
Withdrawal Update Form 2File: Form 2 - Square Homes as on Sept 2025.pdf24 Feb 2026
Withdrawal Update Form 2File: Form 2 - Square Homes as on Dec 2025.pdf24 Feb 2026
Withdrawal Update Form 3File: Form 3 - Square Homes as on Sept 2025.pdf24 Feb 2026
Withdrawal Update Form 3File: Form 3 - Square Homes as on Dec 2025.pdf24 Feb 2026
Form 1File: Form 1 - Square Homes as on March 2025.pdf11 Sep 2025
Form 3File: Form 3 - Square Homes as on 31-03-2025.pdf11 Sep 2025
Disclosure of Sold and Booked InventoryFile: Circular 29 - Square Homes - March 2025.pdf11 Sep 2025
Form 2File: Form 2 - Square Homes as on March 2025.pdf11 Sep 2025
Form 1File: Form 1 - Square Homes as on June 2025.pdf28 Jul 2025
Form 2File: Form 2 - Square Homes as on June 2025.pdf28 Jul 2025
Form 3File: Form 3 - Square Homes as on 30-06-2025.pdf28 Jul 2025
Disclosure of Sold and Booked InventoryFile: Circular 29 - Square Homes as on June 2025.pdf28 Jul 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - Square Homes as on 31-12-2024 Final.pdf2 Jul 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - Square Homes as on 31-03-2025.pdf2 Jul 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - Square Homes as on December 2024.pdf2 Jul 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - Square Homes as on March 2025.pdf2 Jul 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 8 Architect’s Certificate of Percentage of Completion of Work (Form 1).pdf20 Feb 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 7 CA Certificate on Project Cost Fund withdrawal (Form 3).pdf20 Feb 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 6 Engineer’s Certificate on Cost Incurred on Project (Form 2).pdf20 Feb 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 7 Architect’s Certificate of Percentage of Completion of Work (Form 1).pdf7 Dec 2024
Disclosure of sold/ booked inventoryFile: Circular 29 - Square Homes as on Sep 2024.pdf7 Dec 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 - Square Homes as on Sept 2024.pdf16 Oct 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - Square Homes as on 10-08-2024.pdf13 Oct 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - Square Homes as on Sept 2024.pdf13 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - Square Homes as on Sept 2024.pdf13 Oct 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 - Square Homes as on June 2024.pdf5 Aug 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - Square Homes as on June 2024.pdf5 Aug 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - Square Homes as on 30-06-2024.pdf5 Aug 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Square Homes Form 1.pdf2 Aug 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: F1.pdf2 Aug 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 - Square Homes as on June 2024.pdf20 Jul 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 3 Engineer’s Certificate on Cost Incurred on Project (Form 2).pdf20 Jul 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: zzzzzzzzz.pdf20 Jul 2024
Home Buyer /Allottee Grievance Redressal CellFile: Square Homes DECLARATION OF ESTABLISHMENT OF COMPLAINT REDRESSAL CELL.pdf27 Jun 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: RERA FORM 1 (10-4-24).pdf21 Jun 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ENGINEER'S CERTIFICATE.pdf21 Jun 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 - SQUARE HOMES - 31-5-2024.pdf21 Jun 2024
Disclosure of sold/ booked inventoryFile: CIRCULAR 29.pdf21 Jun 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 - SQUARE HOMES - 31-5-24.pdf21 Jun 2024
Proforma of Agreement for saleFile: MODEL AGREEMENT LATEST.pdf13 Mar 2024
Other - TechnicalFile: Annexure A Declaration Cum Undertaking.pdf13 Mar 2024
Copy of the legal title reportFile: title search new.pdf29 Jan 2024
Details of encumbrances concerned to FinanceFile: CONCERED TO FINANCE.pdf29 Jan 2024
Details of encumbrances concerned to LegalFile: CONCERED TO FINANCE.pdf29 Jan 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form -3 NEW (1).pdf8 Jan 2024
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: separate bank.pdf8 Jan 2024
Other - TechnicalFile: email to rera from vvcmc.pdf8 Jan 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ENGINEER CERTIFICATE.pdf15 Dec 2023
Layout approvalFile: Layout-Agashi-Gaothan .pdf25 Nov 2023
Building plan approvalFile: BLUE PRINT.pdf25 Nov 2023
PAN CardFile: Ramesh Jain Pan Card .pdf25 Nov 2023
Details of encumbrances concerned to FinanceFile: concerned to legal.pdf25 Nov 2023
Details of encumbrances concerned to LegalFile: concerned to legal.pdf25 Nov 2023
Copy of Layout Approval (in case of layout)File: Layout-Agashi-Gaothan .pdf25 Nov 2023
Building Plan Approval / NA Order for plotted developmentFile: BLUE PRINT.pdf25 Nov 2023
Declaration about Commencement CertificateFile: commencement certificate.pdf25 Nov 2023
Declaration in FORM BFile: affidavit declaration.pdf25 Nov 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Letter .pdf25 Nov 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form -3_compressed.pdf25 Nov 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: disclousure of interest new format.pdf25 Nov 2023
Proforma of Allotment letterFile: ALLOTEMENT LETTER_merged.pdf25 Nov 2023
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: separate bank.pdf25 Nov 2023
Deviation Report with respect to Allotment letterFile: deviation for Allotment letter.pdf25 Nov 2023
Deviation Report with respect to model copy of AgreementFile: deviation for Agreement sale.pdf25 Nov 2023
Other - LegalFile: development agreement patil (1) NEW COMPRESS.pdf25 Nov 2023
Other - LegalFile: development agreement mhatre (1) COMPRESS.pdf25 Nov 2023
Commencement Certificates / NA Order for plotted developmentFile: CC-Agashi-Gaothan_compressed.pdf24 Nov 2023
CERSAI detailsFile: CERSAI_Search_Report_200288007824_For_Asset_Based_Search_24_11_2023_19_34_47_377.pdf24 Nov 2023

Promoter's earlier projects4

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

4 delivered on promise
ProjectLocationFlatsStatusPromisedDelivered
Square HomesChikhaldongari road virar west80CompletedSep 2021May 2021
Square HomesChikhaldongari road virar west80CompletedSep 2021May 2021
Square HomesChikhaldongari road virar west80CompletedSep 2021May 2021
SQUARE HOMESParadise park2CompletedAug 2021May 2021

How this compares with Palghar

6%of this project is bookeddistrict median 25%
31%of Palghar projects moved their completion datethis one has not
26%of Palghar registrations have lapsed or been cancelledthis one is on the register

Computed across the 3,200+ Palghar projects on ReraGenie, from their own filings.

Free monthly report: Vasai-Virar and Palghar on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep SQUARE HOMES on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near AGASHI3,200+ in Palghar

2 kmSQUARE HOMESCompleted 8Lapsed / revoked 6Other 30Dot size: filed unitsN

Filed coordinates, straight-line distance. 44 registered projects within 2 km.

Builder: RAMESH CHAMPAKLAL JAIN

RAMESH CHAMPAKLAL JAIN has 1 registration on MahaRERA, including SQUARE HOMES. Its filings disclose 2 earlier MahaRERA projects: declares 2 of 2 past projects completed on time. Read the full track record. See more projects on the Palghar district page.

Frequently asked questions

What are my rights if SQUARE HOMES is delayed beyond 31 Dec 2027?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of SQUARE HOMES?

The registered promoter entity is RAMESH CHAMPAKLAL JAIN, an individual as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in SQUARE HOMES?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for SQUARE HOMES?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at SQUARE HOMES?

The professionals named in the filing: Architect: Himesh Gupta & Associates; Engineer: SK Consultants & Engineers; Chartered Accountant: NB Sayed & Associates. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in SQUARE HOMES?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About SQUARE HOMES. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save SQUARE HOMES to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.