Home / Browse projects / SHANDILYA VILLA

Completed No litigation declared Residential / Group Housing project

SHANDILYA VILLA

By Shandilya Properties LLP

RG-MH-12408 · RERA P51900007512 · Last updated on MahaRERA portal: 24 May 2024

Source: official MahaRERA filing

Red flags

  • Completion date moved by 6 months
  • 1 extension taken

Clear

  • No litigation declared
  • No complaints on record
  • Separate project account declared
  • Allotment letter follows the model form
  • Recorded completed on MahaRERA

2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: .
Jan 2023Possession promisedregistration recorded completed
10 of 11Construction stages donefurthest along: Sanitary Fittings within the flats /..., 0%
0Complaints at MahaRERAon this registration
Jump to the 204 documents Report an error

SHANDILYA VILLA is a Residential / Group Housing project by Shandilya Properties LLP in Worli Sea Face, 400030, registered with MahaRERA as P51900007512 on 17 Aug 2017. The registration is recorded completed; possession was promised by 1 Jan 2023. The completion date has moved by 6 months from the original filing.

At a glance

Project

  • NameSHANDILYA VILLA
  • TypeResidential / Group Housing
  • Location
    • Khan Abdul Guffar Khan Road
    • Worli Sea Face
    • 400030
  • Pincode400030
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51900007512
  • ReraGenie IDRG-MH-12408

Builder

  • NameShandilya Properties LLP
  • Entity typeOthers
  • Named personsNOSHIR DARABSHAW TALATI, XERXES NOSHIR TALATI

Key dates

this monthRegisteredAug 2017First promiseJul 2022Revised toJan 2023Recorded completed

Key facts

Registration and timeline

  • StatusCompleted
  • Registered on17 Aug 2017
  • Promised completion1 Jan 2023
  • Revised completionRevised to 1 Jan 2023 (originally 2 Jul 2022)
  • Buildings1 building record
  • Documents filed204 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
SHANDILYA VILLANA360000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 24 May 2024, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

10 of 11 construction stages are filed complete. The stage furthest along is Sanitary Fittings within the flats / premises, at 0%.

SHANDILYA VILLA: 91% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Progress on shared amenities17

As on 24 May 2024, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes100%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsYes100%
Landscaping & Tree PlantingYes100%
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterYes100%
Solid Waste Management And DisposalYes100%
Water conservation /Rain water harvestingYes100%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes100%
Electrical meter room, sub-station, receiving stationYes100%
Aggregate area of recreational Open SpaceYes100%
Open ParkingNoNot applicable
StaircaseYes60%
Car Parking PodiumsYes100%

Parking filed55

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots55
Open Space55

Land and ownership

MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area1,742 sq m
Land owned byThe promoter
Named landownersNone

Approvals and building plan

Permissible FSI8393.3
Proposed, not sanctioned7,053 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchHDFC BANK LIMITED Worli Branch Sandoz House Shivsagar Estate Dr Annie Besant Road Mumbai Maharashtra

Certifying professionals and partners4

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectM/s. TALATI AND PANTHAKY ASSOCIATED PRIVATE LIMITED
ArchitectM/s. TALATI AND PARTNERS LLP
EngineerM/s. STRUCT BOMBAY CONSULTANTS
Chartered AccountantBhagwagar Dalal and Doshi
PartnerRole in project
Shandilya Properties LLP-

Extensions applied for1

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EXT51900012238Jul 2022 → Jan 2023

Reason as filed by the promoterThe Building comprised in the Project is almost complete. The delay is only on account of the pandemic of CoVid 19 and the reverse migration of skilled and unskilled labour as a consequence thereof.

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 22 Jul 2017
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 29 Jul 2017
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 25 Jul 2017
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 25 Jul 2017Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateOn the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    uploaded 24 May 2024

Documents filed204

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 204 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: Full_OC_signed.pdf24 May 2024
Architect’s Certificate on Completion of Project (Form 4)File: Form 4 - May 2024.pdf24 May 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: FORM 5 2022-23.pdf23 Jan 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Form 2A year ending 2022.pdf9 Oct 2023
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: Occupation Certificate 12 June 2023.pdf1 Jul 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: April 2022.pdf10 May 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: 2022-02 Feb 2022.pdf10 May 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: 2022-05 May 2022.pdf10 May 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: 2022-06 June 2022.pdf10 May 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: 2022-07 July 2022.pdf10 May 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: 2022-08 Augst 2022.pdf10 May 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: 2022-09 Sept 2022.pdf10 May 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: 2022-10 Oct 2022.pdf10 May 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: 2022-11 Nov 2022.pdf10 May 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: 2022-12 Dec 2022.pdf10 May 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: 2023-01.pdf10 May 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: 2023-02 Feb 2023.pdf10 May 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: 2023-03 March 2023.pdf10 May 2023
Disclosure of sold/ booked inventoryFile: DISCLOSURE AS ON MAY 2023.pdf10 May 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: APRIL 2022.PDF9 May 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: MAY 2022.PDF9 May 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: JUNE 2022.PDF9 May 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: JULY 2022.PDF9 May 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: AUG 2022.PDF9 May 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: SEP2022.PDF9 May 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: OCT2022.PDF9 May 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: NOV 2022.PDF9 May 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: DEC 2022.PDF9 May 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: JAN 2023.PDF9 May 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: FEB 2023.PDF9 May 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: MARCH 2023.PDF9 May 2023
Disclosure of sold/ booked inventoryFile: SHANDILYA LLP_DISCLOSER OF SOLD INVENTORY_09052023.pdf9 May 2023
Certificates of CA (Form 3)File: RERA FORM 3 - 2018-19.pdf9 May 2023
Certificates of CA (Form 3)File: RERA FORM 3 - 2019-20.pdf9 May 2023
Certificates of CA (Form 3)File: RERA FORM 3 - 2020-21.pdf9 May 2023
Certificates of CA (Form 3)File: RERA FORM 3 - 2021-22.pdf9 May 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: 2021-05_opt.pdf2 May 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: 2019-02_opt.pdf2 May 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: 2019-03_opt.pdf2 May 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: 2019-04_opt.pdf2 May 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: 2019-05_opt.pdf2 May 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: 2019-06_opt.pdf2 May 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: 2019-07_opt.pdf2 May 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: 2019-08_opt.pdf2 May 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: 2019-09_opt.pdf2 May 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: 2019-10_opt.pdf2 May 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: 2019-11_opt.pdf2 May 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: 2019-12_opt.pdf2 May 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: 2020-01_opt.pdf2 May 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: 2020-02_opt.pdf2 May 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: 2020-03_opt.pdf2 May 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: 2020-04_opt.pdf2 May 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: 2020-05_opt.pdf2 May 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: 2020-06_opt.pdf2 May 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: 2020-07_opt.pdf2 May 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: 2020-08_opt.pdf2 May 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: 2020-09_opt.pdf2 May 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: 2020-10_opt.pdf2 May 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: 2020-11_opt.pdf2 May 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: 2020-12_opt.pdf2 May 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: 2021-01_opt.pdf2 May 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: 2021-02_opt.pdf2 May 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: 2021-03_opt.pdf2 May 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: 2021-04_opt.pdf2 May 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: 2021-06_opt.pdf2 May 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: 2021-07_opt.pdf2 May 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: 2021-08_opt.pdf2 May 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: 2021-09_opt.pdf2 May 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: 2021-10_opt.pdf2 May 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: 2021-11_opt.pdf2 May 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: 2021-12_opt.pdf2 May 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: 2022-01_opt.pdf2 May 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: 2022-02_opt.pdf2 May 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: 2022-03_opt.pdf2 May 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: Form 2A year ending 2022.pdf2 May 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: 2017-08.pdf28 Apr 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: 2017-09.pdf28 Apr 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: 2017-10.pdf28 Apr 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: 2017-11.pdf28 Apr 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: 2017-12.pdf28 Apr 2023

Keep SHANDILYA VILLA on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Worli Sea Face

2 kmSHANDILYA VILLACompleted 1Other 7Dot size: filed unitsN

Filed coordinates, straight-line distance. 8 registered projects within 2 km.

Builder: Shandilya Properties LLP

Shandilya Properties LLP has 1 registration on MahaRERA, including SHANDILYA VILLA. Its filings disclose no earlier MahaRERA projects. Read the full track record.

Frequently asked questions

What are my rights if SHANDILYA VILLA is delayed beyond 1 Jan 2023?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of SHANDILYA VILLA?

The registered promoter entity is Shandilya Properties LLP, an others as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in SHANDILYA VILLA?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for SHANDILYA VILLA?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at SHANDILYA VILLA?

The professionals named in the filing: Architect: M/s. TALATI AND PANTHAKY ASSOCIATED PRIVATE LIMITED; Architect: M/s. TALATI AND PARTNERS LLP; Engineer: M/s. STRUCT BOMBAY CONSULTANTS; Chartered Accountant: Bhagwagar Dalal and Doshi. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in SHANDILYA VILLA?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About SHANDILYA VILLA. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save SHANDILYA VILLA to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.