Home / Browse projects / Prestige Nautilus

Registered No litigation declared Residential / Group Housing project

Prestige Nautilus

By Prestige Falcon Mumbai Realty Private Limited

RG-MH-26580 · RERA P51900009720 · Last updated on MahaRERA portal: 12 Aug 2026

Source: official MahaRERA filing

Red flags

  • 16 complaints at MahaRERA
  • Completion date moved by 78 months
  • 1 extension taken

Clear

  • No litigation declared
  • Separate project account declared
  • Allotment letter follows the model form

3 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: .
Jun 2032Possession promisedmoved 78 months from the original
0 of 33Construction stages doneacross 3 buildings; furthest along: Excavation, 86%
69 of 214Units unsoldnot recorded sold or booked
16Complaints at MahaRERAon this registration
Jump to the 274 documents Report an error

Prestige Nautilus is a Residential / Group Housing project by Prestige Falcon Mumbai Realty Private Limited in Worli, 400030, registered with MahaRERA as P51900009720 on 22 Aug 2017. Possession is promised by 30 Jun 2032. The completion date has moved by 78 months from the original filing. 145 of the 214 units on this registration are recorded sold or booked, and 0 of 33 construction stages are filed complete. 16 complaints are on record with the regulator.

At a glance

Project

  • NamePrestige Nautilus
  • TypeResidential / Group Housing
  • Location
    • Dr Annie Besant Road
    • Worli
    • 400030
  • Pincode400030
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51900009720
  • ReraGenie IDRG-MH-26580

Builder

  • NamePrestige Falcon Mumbai Realty Private Limited
  • Entity typeCompany
  • DirectorsMohmed Zaid Sadiq, Ravindra Munishwar Mehta, Irfan Razack, Srinivasarao Nagabhushana Rao Nagendra

Key dates

this monthRegisteredAug 2017First promiseDec 2025Revised toJun 2032

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on22 Aug 2017
  • Promised completion30 Jun 2032
  • Revised completionRevised to 30 Jun 2032 (originally 30 Dec 2025)
  • Buildings3 building records
  • Documents filed274 files

Current status

68%145 of 214 units booked
9.2%Work done, per cost certificate

Figures as on 12 Aug 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
N1 - Wing FNA684746046
N2 - Wing ENA684782082
N3 - Wing DNA684786086

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building3

As on 12 Aug 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

0 of 33 construction stages are filed complete across 3 buildings. The stage furthest along is Excavation, at 86%.

N1 - Wing F8%
ActivityProgress
Excavation86%
Basement (if any)7%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
N2 - Wing E6%
ActivityProgress
Excavation61%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
N3 - Wing D7%
ActivityProgress
Excavation72%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 12 Aug 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes0%
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes0%
Street LightingYes0%
Community BuildingsYes0%
Treatment And Disposal Of Sewage And Sullage WaterYes0%
Solid Waste Management And DisposalYes0%
Water conservation /Rain water harvestingYes0%
Energy managemcntYes0%
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceYes0%
Open ParkingNoNot applicable

Parking filed1044

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots1,044
Closed/Covered1,044
BuildingClosed/CoveredTotal
N1 - Wing F313313
N2 - Wing E360360
N3 - Wing D371371

Land and ownership1

MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area7,588 sq m
Land owned byThe promoter, with other names on the file
Named landowners1
LandownerVillageDistrict
Worli Shivshahi Co-operative Housing Society Ltd-Mumbai City

Approvals and building plan

Sanctioning authorityMaharashtra Housing and Area Development Authority (MHADA)
Permissible FSI99517.01
Proposed, not sanctioned99,517 sq m
Buildings approved3
Buildings sanctioned3

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branch1, Shobha Pearl, Commissariat Road, Off M G Road, Ground Floor, Bangalore - 560025
Estimated costRs 1,831.69 cr
Cost incurredRs 168.27 cr
Work done9.19%
BuildingWingEstimatedIncurred
N1 - Wing FNARs 498.72 crRs 55.82 cr
N3 - Wing DNARs 466.57 crRs 43.23 cr
N2 - Wing ENARs 454.51 crRs 33.65 cr
-NARs 411.89 crRs 35.56 cr

Certifying professionals and partners4

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectMs. Shilp Associates
EngineerSHREE VENKATADRI ASSOCIATES
EngineerGulabrai M Pandhi
Chartered AccountantMs. BHUVANA BHAT & ASSOCIATES
PartnerRole in project
Prestige Falcon Mumbai Realty Private Limited-

Extensions applied for1

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EXT51900027651Dec 2025 → Jun 2032

Reason as filed by the promoterIn accordance with circular no 28, we hereby apply for extension of our project u/s 7(3) in Format B. The project was delayed for reasons beyond our control on account of various reasons and more particularly because of the Change in Promoter. We have currently taken over the project and intend to complete it within the specified timeline. We have consent of 77.77% allottees for purpose of extension of RERA registration period of the said project.

Litigation declared1

CaseCourtStatus
CC006000000220956/2022MahaRERAFor reply

Complaints filed with MahaRERA16

Case no.ComplainantRespondentFiled
CC006000000198401Samir BhandariWondervalue Realty Developers Pvt. Ltd.20/09/2021
CC006000000198502Gopi Krishna TulsiyanWondervalue Realty developers28/09/2021
CC006000000198503Shaym Sunder KabraWondervaluerealty Developers Pvt. Ltd.28/09/2021
CC006000000209763Gaurav KhungarWondervalue Realty Developers Pvt. Ltd.24/01/2022
CC006000000012310GOVIND MEGHRAJ SARAOGIWondervalue Realty Developers Pvt. Ltd.14/12/2017
CC006000000044115Tejal Hiten ShahWondervalue Realty Developers Private Limited13/04/2018
CC006000000056900Ranjeet thakurWondervalue Realty developers13/11/2018
CC006000000193003Subhash DoshiWondervalue Realty Developers Private Limited13/03/2020
CC006000000196483IIRF XIWondervalue Realty Developers Private Limited25/03/2021
CC006000000197118Harsha DharmashiThe Worli ShivShahi CHS Ltd01/06/2021
CC006000000197120Hina DharmashiThe WOrliSHiv SHahi CHS Ltd01/06/2021
CC006000000197121Ruplai DharmashiThe Worli SHivSHahi CHS Ltd01/06/2021
CC006000000197142Anish GuptaThe Worli Shivshahi CHS Ltd03/06/2021
CC006000000197143Ridhi GuptaThe Worli Shivshahi CHS Ltd03/06/2021
CC006000000197211Paresh MehtaThe Worli Shivshahi CHS Ltd11/06/2021
CC006000000220956Mr. Rohit & Mrs. Deena Mehtai) Wondervalue Realty Developers Pvt Ltd, ii) Shivshahi CHS Ltd, iii) Prestige Estate Projects Ltd26/04/2022

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 29 Jul 2017
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 12 Aug 2026
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 12 Aug 2026
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 4 Mar 2025Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 30 Jun 2032

Documents filed274

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 274 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Layout approvalFile: Page - Layout Plan (Highlighted) (Sanctioned BUA) (Permissible) (Parking).pdf12 Aug 2026
Building plan approvalFile: Page 1 - Ground Floor Plan.pdf12 Aug 2026
Building plan approvalFile: Page 2 - 1st and 2nd Basement Plan.pdf12 Aug 2026
Building plan approvalFile: Page 3 - 3rd and 4th Basement Plan.pdf12 Aug 2026
Building plan approvalFile: Page 4 - 5th Basement Plan.pdf12 Aug 2026
Building plan approvalFile: Page 5 - Podium Floor Plan.pdf12 Aug 2026
Building plan approvalFile: Page 6 - Podium Floor Plan.pdf12 Aug 2026
Building plan approvalFile: Page 7 - Podium and 10th Service floor Plan.pdf12 Aug 2026
Building plan approvalFile: Page 8 - Floor Plans for N1 N2 N3.pdf12 Aug 2026
Building plan approvalFile: Page 9 - Floor Plans for N1 N2 N3.pdf12 Aug 2026
Building plan approvalFile: page 10 - Floor Plans for N1 N2 N3.pdf12 Aug 2026
Building plan approvalFile: Page 11 - Floor Plans for N1 N2 N3.pdf12 Aug 2026
Building plan approvalFile: Page 12 - Floor Plans for N1 N2 N3.pdf12 Aug 2026
Building plan approvalFile: Page 13 - Floor Plans for N1 N2 N3.pdf12 Aug 2026
Building plan approvalFile: Page 14 - Floor Plans for N1 N2 N3.pdf12 Aug 2026
Building plan approvalFile: page 15 - Floor Plans for N1 N2 N3.pdf12 Aug 2026
Building plan approvalFile: Page 16 - Floor and Terrace floor plan for N1 N2 N3.pdf12 Aug 2026
Building plan approvalFile: Page 17 - Built Up area Bifurcation for N1 N2 and N3.pdf12 Aug 2026
Building plan approvalFile: Page 18 - Elevation.pdf12 Aug 2026
Building plan approvalFile: Page 19 - Elevation.pdf12 Aug 2026
Building plan approvalFile: Page 20 - Floor Diagram.pdf12 Aug 2026
Building plan approvalFile: Page 21 - Floor Diagram.pdf12 Aug 2026
Building plan approvalFile: Page 22 - FLoor Diagram.pdf12 Aug 2026
Building plan approvalFile: Page 23 - FLoor Diagram.pdf12 Aug 2026
Building plan approvalFile: Page 24 - FLoor Diagram.pdf12 Aug 2026
Building plan approvalFile: Page 25 - Floor Diagram.pdf12 Aug 2026
Building plan approvalFile: Page 26 - Floor Diagram.pdf12 Aug 2026
Building plan approvalFile: Page 27 - Floor Diagram.pdf12 Aug 2026
Building plan approvalFile: Page 28 - Floor Diagram.pdf12 Aug 2026
Building plan approvalFile: Page 29 - Floor Diagram.pdf12 Aug 2026
Building plan approvalFile: Page 30 - Floor Diagram.pdf12 Aug 2026
Building plan approvalFile: Page 31 - Floor Diagram.pdf12 Aug 2026
Building plan approvalFile: Page 32 - Floor Diagram.pdf12 Aug 2026
Building plan approvalFile: Page 33 - Floor Diagram.pdf12 Aug 2026
Building plan approvalFile: Page 34 - Floor Diagram.pdf12 Aug 2026
Building plan approvalFile: page 35 - Floor Diagram.pdf12 Aug 2026
Building plan approvalFile: Page 36 - Floor Diagram.pdf12 Aug 2026
Building plan approvalFile: Page 37 - Floor Diagram.pdf12 Aug 2026
Building plan approvalFile: Page 38 - Floor Diagram.pdf12 Aug 2026
Building plan approvalFile: Page 39 - Floor Diagram.pdf12 Aug 2026
Building plan approvalFile: Page 40 - Floor Diagram.pdf12 Aug 2026
Building plan approvalFile: Page 41 - Floor Diagram.pdf12 Aug 2026
Building plan approvalFile: Page 42 - Floor Diagram.pdf12 Aug 2026
Building plan approvalFile: Page 43 - Floor Diagram.pdf12 Aug 2026
Building plan approvalFile: Page 44 - Floor Diagram.pdf12 Aug 2026
Building plan approvalFile: Page 45 - Floor Diagram.pdf12 Aug 2026
Building plan approvalFile: Page 46 - Floor Diagram.pdf12 Aug 2026
Building plan approvalFile: Page 47 - Floor Diagram.pdf12 Aug 2026
Building plan approvalFile: Page 48 - Floor Diagram.pdf12 Aug 2026
Building plan approvalFile: Page 49 - Floor Diagram.pdf12 Aug 2026
Building plan approvalFile: Page 50 - Floor Diagram.pdf12 Aug 2026
Building plan approvalFile: Page 51 - Floor Diagram.pdf12 Aug 2026
Form 2A (FY 2025-2026)File: Form 2A (FY 2025-2026).pdf11 Aug 2026
Withdrawal Update Form 1File: Q1 FORM 1 Nautilus.pdf23 Jul 2026
Withdrawal Update Form 2File: Q1 Form 2 Nautilus.pdf23 Jul 2026
Withdrawal Update Form 3File: Q1 Form 3 Nautilus RERA portal signed.pdf23 Jul 2026
Withdrawal Update Form 1File: Q1 FORM - 1_Nautilus.pdf20 Apr 2026
Withdrawal Update Form 1File: Q2 Nautilus (Form - 1).pdf20 Apr 2026
Withdrawal Update Form 1File: Q3 Form1_Nautilus.pdf20 Apr 2026
Withdrawal Update Form 1File: Form 1_Q4_Nautilus.pdf20 Apr 2026
Withdrawal Update Form 2File: Q1 Form 2 Nautilus.pdf20 Apr 2026
Withdrawal Update Form 2File: Form 2 _ Nautilus.pdf20 Apr 2026
Withdrawal Update Form 2File: Q3 Nautilus_Form 2.pdf20 Apr 2026
Withdrawal Update Form 2File: Form 2_Q4_Nautilus.pdf20 Apr 2026
Withdrawal Update Form 3File: Q1-Nautilus Form 3.pdf20 Apr 2026
Withdrawal Update Form 3File: A-Prestige Nautilus.pdf20 Apr 2026
Withdrawal Update Form 3File: Q3 Form 3 Nautilus_compressed.pdf20 Apr 2026
Withdrawal Update Form 3File: Q4_Form 3_Nautilus 26.pdf20 Apr 2026
Form 1File: Form 1 Nautilus Q4.pdf5 Feb 2026
Form 2File: Form 2 Nautilus Q4.pdf5 Feb 2026
Form 3File: Form 3 Nautilus Q4.pdf5 Feb 2026
Disclosure of Sold and Booked InventoryFile: Sold Unsold Nautilus Q4.pdf5 Feb 2026
Layout approvalFile: 250319_New Layout For RERA.pdf13 Oct 2025
Certificates of CA (Form 3)File: Form 3 - Prestige Nautilus (Annexure 1)_11zon (1).pdf7 May 2025
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 Nautilus Q4.pdf25 Apr 2025
Certificates of CA (Form 3)File: Form 3 Nautilus Q4.pdf25 Apr 2025
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 Nautilus Q4.pdf25 Apr 2025
Disclosure of sold/ booked inventoryFile: Sold Unsold Nautilus Q4.pdf25 Apr 2025
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: 250305_Form 1.pdf12 Mar 2025
Layout approvalFile: 1 and 2.pdf4 Mar 2025

Keep Prestige Nautilus on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Worli

2 kmPrestige NautilusCompleted 2Other 6Dot size: filed unitsN

Filed coordinates, straight-line distance. 8 registered projects within 2 km.

Builder: Prestige Falcon Mumbai Realty Private Limited

Prestige Falcon Mumbai Realty Private Limited has 1 registration on MahaRERA, including Prestige Nautilus. Its filings disclose no earlier MahaRERA projects. Read the full track record.

Frequently asked questions

What are my rights if Prestige Nautilus is delayed beyond 30 Jun 2032?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Prestige Nautilus?

The registered promoter entity is Prestige Falcon Mumbai Realty Private Limited, a company as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Prestige Nautilus?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How do I read the complaint cases filed against Prestige Nautilus?

Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.

How current is the construction progress shown for Prestige Nautilus?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Prestige Nautilus?

The professionals named in the filing: Architect: Ms. Shilp Associates; Engineer: SHREE VENKATADRI ASSOCIATES; Engineer: Gulabrai M Pandhi; Chartered Accountant: Ms. BHUVANA BHAT & ASSOCIATES. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Prestige Nautilus?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Prestige Nautilus. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Prestige Nautilus to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.