Home / Browse projects / Prestige Nautilus
Prestige Nautilus
By Prestige Falcon Mumbai Realty Private Limited
RG-MH-26580 · RERA P51900009720 · Last updated on MahaRERA portal: 12 Aug 2026
Source: official MahaRERA filing
Or get an email each time it changes, with the project watch
Red flags
- 16 complaints at MahaRERA
- Completion date moved by 78 months
- 1 extension taken
Clear
- No litigation declared
- Separate project account declared
- Allotment letter follows the model form
3 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.
See what the report covers Free either way: .Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
Prestige Nautilus is a Residential / Group Housing project by Prestige Falcon Mumbai Realty Private Limited in Worli, 400030, registered with MahaRERA as P51900009720 on 22 Aug 2017. Possession is promised by 30 Jun 2032. The completion date has moved by 78 months from the original filing. 145 of the 214 units on this registration are recorded sold or booked, and 0 of 33 construction stages are filed complete. 16 complaints are on record with the regulator.
At a glance
Project
- NamePrestige Nautilus
- TypeResidential / Group Housing
- Location
- Dr Annie Besant Road
- Worli
- 400030
- Pincode400030
- MapView location on Google Maps (as filed on RERA)
- RERA no.P51900009720
- ReraGenie IDRG-MH-26580
Builder
- NamePrestige Falcon Mumbai Realty Private Limited
- Entity typeCompany
- DirectorsMohmed Zaid Sadiq, Ravindra Munishwar Mehta, Irfan Razack, Srinivasarao Nagabhushana Rao Nagendra
Key dates
Key facts
Registration and timeline
- StatusRegistered
- Registered on22 Aug 2017
- Promised completion30 Jun 2032
- Revised completionRevised to 30 Jun 2032 (originally 30 Dec 2025)
- Buildings3 building records
- Documents filed274 files
Current status
Figures as on 12 Aug 2026, this project's latest MahaRERA filing.
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| N1 - Wing F | NA | 68 | 47 | 46 | 0 | 46 |
| N2 - Wing E | NA | 68 | 47 | 82 | 0 | 82 |
| N3 - Wing D | NA | 68 | 47 | 86 | 0 | 86 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building3
As on 12 Aug 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
0 of 33 construction stages are filed complete across 3 buildings. The stage furthest along is Excavation, at 86%.
N1 - Wing F8%
| Activity | Progress |
|---|---|
| Excavation | 86% |
| Basement (if any) | 7% |
| Podiums (if any) | 0% |
| Plinth | 0% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 0% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 0% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
N2 - Wing E6%
| Activity | Progress |
|---|---|
| Excavation | 61% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 0% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 0% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 0% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
N3 - Wing D7%
| Activity | Progress |
|---|---|
| Excavation | 72% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 0% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 0% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 0% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
Progress on shared amenities15
As on 12 Aug 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | Yes | 0% |
| Water Supply | Yes | 0% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 0% |
| Storm Water Drains | Yes | 0% |
| Landscaping & Tree Planting | Yes | 0% |
| Street Lighting | Yes | 0% |
| Community Buildings | Yes | 0% |
| Treatment And Disposal Of Sewage And Sullage Water | Yes | 0% |
| Solid Waste Management And Disposal | Yes | 0% |
| Water conservation /Rain water harvesting | Yes | 0% |
| Energy managemcnt | Yes | 0% |
| Fire protection and fire safety requirements | Yes | 0% |
| Electrical meter room, sub-station, receiving station | Yes | 0% |
| Aggregate area of recreational Open Space | Yes | 0% |
| Open Parking | No | Not applicable |
Parking filed1044
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
| Building | Closed/Covered | Total |
|---|---|---|
| N1 - Wing F | 313 | 313 |
| N2 - Wing E | 360 | 360 |
| N3 - Wing D | 371 | 371 |
Land and ownership1
MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.
| Landowner | Village | District |
|---|---|---|
| Worli Shivshahi Co-operative Housing Society Ltd | - | Mumbai City |
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
| Building | Wing | Estimated | Incurred |
|---|---|---|---|
| N1 - Wing F | NA | Rs 498.72 cr | Rs 55.82 cr |
| N3 - Wing D | NA | Rs 466.57 cr | Rs 43.23 cr |
| N2 - Wing E | NA | Rs 454.51 cr | Rs 33.65 cr |
| - | NA | Rs 411.89 cr | Rs 35.56 cr |
Certifying professionals and partners4
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | Ms. Shilp Associates |
| Engineer | SHREE VENKATADRI ASSOCIATES |
| Engineer | Gulabrai M Pandhi |
| Chartered Accountant | Ms. BHUVANA BHAT & ASSOCIATES |
| Partner | Role in project |
|---|---|
| Prestige Falcon Mumbai Realty Private Limited | - |
Extensions applied for1
A revised date filed with the regulator does not change the possession date in your agreement for sale.
Reason as filed by the promoterIn accordance with circular no 28, we hereby apply for extension of our project u/s 7(3) in Format B. The project was delayed for reasons beyond our control on account of various reasons and more particularly because of the Change in Promoter. We have currently taken over the project and intend to complete it within the specified timeline. We have consent of 77.77% allottees for purpose of extension of RERA registration period of the said project.
Litigation declared1
| Case | Court | Status |
|---|---|---|
| CC006000000220956/2022 | MahaRERA | For reply |
Complaints filed with MahaRERA16
| Case no. | Complainant | Respondent | Filed |
|---|---|---|---|
| CC006000000198401 | Samir Bhandari | Wondervalue Realty Developers Pvt. Ltd. | 20/09/2021 |
| CC006000000198502 | Gopi Krishna Tulsiyan | Wondervalue Realty developers | 28/09/2021 |
| CC006000000198503 | Shaym Sunder Kabra | Wondervaluerealty Developers Pvt. Ltd. | 28/09/2021 |
| CC006000000209763 | Gaurav Khungar | Wondervalue Realty Developers Pvt. Ltd. | 24/01/2022 |
| CC006000000012310 | GOVIND MEGHRAJ SARAOGI | Wondervalue Realty Developers Pvt. Ltd. | 14/12/2017 |
| CC006000000044115 | Tejal Hiten Shah | Wondervalue Realty Developers Private Limited | 13/04/2018 |
| CC006000000056900 | Ranjeet thakur | Wondervalue Realty developers | 13/11/2018 |
| CC006000000193003 | Subhash Doshi | Wondervalue Realty Developers Private Limited | 13/03/2020 |
| CC006000000196483 | IIRF XI | Wondervalue Realty Developers Private Limited | 25/03/2021 |
| CC006000000197118 | Harsha Dharmashi | The Worli ShivShahi CHS Ltd | 01/06/2021 |
| CC006000000197120 | Hina Dharmashi | The WOrliSHiv SHahi CHS Ltd | 01/06/2021 |
| CC006000000197121 | Ruplai Dharmashi | The Worli SHivSHahi CHS Ltd | 01/06/2021 |
| CC006000000197142 | Anish Gupta | The Worli Shivshahi CHS Ltd | 03/06/2021 |
| CC006000000197143 | Ridhi Gupta | The Worli Shivshahi CHS Ltd | 03/06/2021 |
| CC006000000197211 | Paresh Mehta | The Worli Shivshahi CHS Ltd | 11/06/2021 |
| CC006000000220956 | Mr. Rohit & Mrs. Deena Mehta | i) Wondervalue Realty Developers Pvt Ltd, ii) Shivshahi CHS Ltd, iii) Prestige Estate Projects Ltd | 26/04/2022 |
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 29 Jul 2017 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 12 Aug 2026 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 12 Aug 2026 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 4 Mar 2025Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateNot due yet
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
possession is promised for 30 Jun 2032
Documents filed274
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 274 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Layout approvalFile: Page - Layout Plan (Highlighted) (Sanctioned BUA) (Permissible) (Parking).pdf | 12 Aug 2026 |
| Building plan approvalFile: Page 1 - Ground Floor Plan.pdf | 12 Aug 2026 |
| Building plan approvalFile: Page 2 - 1st and 2nd Basement Plan.pdf | 12 Aug 2026 |
| Building plan approvalFile: Page 3 - 3rd and 4th Basement Plan.pdf | 12 Aug 2026 |
| Building plan approvalFile: Page 4 - 5th Basement Plan.pdf | 12 Aug 2026 |
| Building plan approvalFile: Page 5 - Podium Floor Plan.pdf | 12 Aug 2026 |
| Building plan approvalFile: Page 6 - Podium Floor Plan.pdf | 12 Aug 2026 |
| Building plan approvalFile: Page 7 - Podium and 10th Service floor Plan.pdf | 12 Aug 2026 |
| Building plan approvalFile: Page 8 - Floor Plans for N1 N2 N3.pdf | 12 Aug 2026 |
| Building plan approvalFile: Page 9 - Floor Plans for N1 N2 N3.pdf | 12 Aug 2026 |
| Building plan approvalFile: page 10 - Floor Plans for N1 N2 N3.pdf | 12 Aug 2026 |
| Building plan approvalFile: Page 11 - Floor Plans for N1 N2 N3.pdf | 12 Aug 2026 |
| Building plan approvalFile: Page 12 - Floor Plans for N1 N2 N3.pdf | 12 Aug 2026 |
| Building plan approvalFile: Page 13 - Floor Plans for N1 N2 N3.pdf | 12 Aug 2026 |
| Building plan approvalFile: Page 14 - Floor Plans for N1 N2 N3.pdf | 12 Aug 2026 |
| Building plan approvalFile: page 15 - Floor Plans for N1 N2 N3.pdf | 12 Aug 2026 |
| Building plan approvalFile: Page 16 - Floor and Terrace floor plan for N1 N2 N3.pdf | 12 Aug 2026 |
| Building plan approvalFile: Page 17 - Built Up area Bifurcation for N1 N2 and N3.pdf | 12 Aug 2026 |
| Building plan approvalFile: Page 18 - Elevation.pdf | 12 Aug 2026 |
| Building plan approvalFile: Page 19 - Elevation.pdf | 12 Aug 2026 |
| Building plan approvalFile: Page 20 - Floor Diagram.pdf | 12 Aug 2026 |
| Building plan approvalFile: Page 21 - Floor Diagram.pdf | 12 Aug 2026 |
| Building plan approvalFile: Page 22 - FLoor Diagram.pdf | 12 Aug 2026 |
| Building plan approvalFile: Page 23 - FLoor Diagram.pdf | 12 Aug 2026 |
| Building plan approvalFile: Page 24 - FLoor Diagram.pdf | 12 Aug 2026 |
| Building plan approvalFile: Page 25 - Floor Diagram.pdf | 12 Aug 2026 |
| Building plan approvalFile: Page 26 - Floor Diagram.pdf | 12 Aug 2026 |
| Building plan approvalFile: Page 27 - Floor Diagram.pdf | 12 Aug 2026 |
| Building plan approvalFile: Page 28 - Floor Diagram.pdf | 12 Aug 2026 |
| Building plan approvalFile: Page 29 - Floor Diagram.pdf | 12 Aug 2026 |
| Building plan approvalFile: Page 30 - Floor Diagram.pdf | 12 Aug 2026 |
| Building plan approvalFile: Page 31 - Floor Diagram.pdf | 12 Aug 2026 |
| Building plan approvalFile: Page 32 - Floor Diagram.pdf | 12 Aug 2026 |
| Building plan approvalFile: Page 33 - Floor Diagram.pdf | 12 Aug 2026 |
| Building plan approvalFile: Page 34 - Floor Diagram.pdf | 12 Aug 2026 |
| Building plan approvalFile: page 35 - Floor Diagram.pdf | 12 Aug 2026 |
| Building plan approvalFile: Page 36 - Floor Diagram.pdf | 12 Aug 2026 |
| Building plan approvalFile: Page 37 - Floor Diagram.pdf | 12 Aug 2026 |
| Building plan approvalFile: Page 38 - Floor Diagram.pdf | 12 Aug 2026 |
| Building plan approvalFile: Page 39 - Floor Diagram.pdf | 12 Aug 2026 |
| Building plan approvalFile: Page 40 - Floor Diagram.pdf | 12 Aug 2026 |
| Building plan approvalFile: Page 41 - Floor Diagram.pdf | 12 Aug 2026 |
| Building plan approvalFile: Page 42 - Floor Diagram.pdf | 12 Aug 2026 |
| Building plan approvalFile: Page 43 - Floor Diagram.pdf | 12 Aug 2026 |
| Building plan approvalFile: Page 44 - Floor Diagram.pdf | 12 Aug 2026 |
| Building plan approvalFile: Page 45 - Floor Diagram.pdf | 12 Aug 2026 |
| Building plan approvalFile: Page 46 - Floor Diagram.pdf | 12 Aug 2026 |
| Building plan approvalFile: Page 47 - Floor Diagram.pdf | 12 Aug 2026 |
| Building plan approvalFile: Page 48 - Floor Diagram.pdf | 12 Aug 2026 |
| Building plan approvalFile: Page 49 - Floor Diagram.pdf | 12 Aug 2026 |
| Building plan approvalFile: Page 50 - Floor Diagram.pdf | 12 Aug 2026 |
| Building plan approvalFile: Page 51 - Floor Diagram.pdf | 12 Aug 2026 |
| Form 2A (FY 2025-2026)File: Form 2A (FY 2025-2026).pdf | 11 Aug 2026 |
| Withdrawal Update Form 1File: Q1 FORM 1 Nautilus.pdf | 23 Jul 2026 |
| Withdrawal Update Form 2File: Q1 Form 2 Nautilus.pdf | 23 Jul 2026 |
| Withdrawal Update Form 3File: Q1 Form 3 Nautilus RERA portal signed.pdf | 23 Jul 2026 |
| Withdrawal Update Form 1File: Q1 FORM - 1_Nautilus.pdf | 20 Apr 2026 |
| Withdrawal Update Form 1File: Q2 Nautilus (Form - 1).pdf | 20 Apr 2026 |
| Withdrawal Update Form 1File: Q3 Form1_Nautilus.pdf | 20 Apr 2026 |
| Withdrawal Update Form 1File: Form 1_Q4_Nautilus.pdf | 20 Apr 2026 |
| Withdrawal Update Form 2File: Q1 Form 2 Nautilus.pdf | 20 Apr 2026 |
| Withdrawal Update Form 2File: Form 2 _ Nautilus.pdf | 20 Apr 2026 |
| Withdrawal Update Form 2File: Q3 Nautilus_Form 2.pdf | 20 Apr 2026 |
| Withdrawal Update Form 2File: Form 2_Q4_Nautilus.pdf | 20 Apr 2026 |
| Withdrawal Update Form 3File: Q1-Nautilus Form 3.pdf | 20 Apr 2026 |
| Withdrawal Update Form 3File: A-Prestige Nautilus.pdf | 20 Apr 2026 |
| Withdrawal Update Form 3File: Q3 Form 3 Nautilus_compressed.pdf | 20 Apr 2026 |
| Withdrawal Update Form 3File: Q4_Form 3_Nautilus 26.pdf | 20 Apr 2026 |
| Form 1File: Form 1 Nautilus Q4.pdf | 5 Feb 2026 |
| Form 2File: Form 2 Nautilus Q4.pdf | 5 Feb 2026 |
| Form 3File: Form 3 Nautilus Q4.pdf | 5 Feb 2026 |
| Disclosure of Sold and Booked InventoryFile: Sold Unsold Nautilus Q4.pdf | 5 Feb 2026 |
| Layout approvalFile: 250319_New Layout For RERA.pdf | 13 Oct 2025 |
| Certificates of CA (Form 3)File: Form 3 - Prestige Nautilus (Annexure 1)_11zon (1).pdf | 7 May 2025 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 Nautilus Q4.pdf | 25 Apr 2025 |
| Certificates of CA (Form 3)File: Form 3 Nautilus Q4.pdf | 25 Apr 2025 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 Nautilus Q4.pdf | 25 Apr 2025 |
| Disclosure of sold/ booked inventoryFile: Sold Unsold Nautilus Q4.pdf | 25 Apr 2025 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: 250305_Form 1.pdf | 12 Mar 2025 |
| Layout approvalFile: 1 and 2.pdf | 4 Mar 2025 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
Buyer report
Built from this project's filings on the day you order, in plain language.
- 3 conditions on this project's record read and explained, with the clear checks alongside
- Joined against every project registered within 2 km, which the RERA portal never shows together
- All 274 filed documents as one ZIP, foldered, with a manifest
- The project watch below, included free for 90 days
Project watch
Only want to be told when something changes?
- An email each time this filing moves: new sales, a moved possession date, an extension, a complaint, the occupancy certificate
- Plain words, conditions that have happened marked in red
- A summary of everything that changed when the 90 days end
Keep Prestige Nautilus on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near Worli
Filed coordinates, straight-line distance. 8 registered projects within 2 km.
Birla Niyaara Phase-1
Aditya Birla Real Estate Limited
MARINA BAY WORLI SEA FACE
Saumya Buildcon Pvt Ltd
Birla Niyaara Phase-2
Aditya Birla Real Estate Limited
AAKASA
TECHNO FRESHWORLD LLP
Sarkars EL Dorado T1
CHINTAHARNI CHINTPURNI REALTORS LLP
REDEVELOPMENT PROJECT OF DAYAWANI CHAWL
ANIL MURARILAL AGARWAL
Builder: Prestige Falcon Mumbai Realty Private Limited
Prestige Falcon Mumbai Realty Private Limited has 1 registration on MahaRERA, including Prestige Nautilus. Its filings disclose no earlier MahaRERA projects. Read the full track record.
Frequently asked questions
What are my rights if Prestige Nautilus is delayed beyond 30 Jun 2032?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of Prestige Nautilus?
The registered promoter entity is Prestige Falcon Mumbai Realty Private Limited, a company as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in Prestige Nautilus?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How do I read the complaint cases filed against Prestige Nautilus?
Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.
How current is the construction progress shown for Prestige Nautilus?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at Prestige Nautilus?
The professionals named in the filing: Architect: Ms. Shilp Associates; Engineer: SHREE VENKATADRI ASSOCIATES; Engineer: Gulabrai M Pandhi; Chartered Accountant: Ms. BHUVANA BHAT & ASSOCIATES. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in Prestige Nautilus?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback