Home / Browse projects / Nashik, Maharashtra / SHAH AND KASAR'S LAXMI PARK PHASE I

Completed No litigation declared Residential / Group Housing project

SHAH AND KASAR'S LAXMI PARK PHASE I

By SHAH AND KASAR BUILDERS

RG-MH-05099 · RERA P51600023375 · Last updated on MahaRERA portal: 13 Jan 2025

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form
  • Recorded completed on MahaRERA

Nothing adverse is on this record. The buyer report still reads the filed documents themselves.

See what the report covers Free either way: or have every new Nashik registration emailed to you, free during the pilot beta.
Dec 2025Possession promisedregistration recorded completed
64 of 99Construction stages doneacross 9 buildings; furthest along: Podiums (if any), 0%
0Complaints at MahaRERAon this registration
Jump to the 113 documents Report an error

SHAH AND KASAR'S LAXMI PARK PHASE I is a Residential / Group Housing project by SHAH AND KASAR BUILDERS in Nashik, Maharashtra, registered with MahaRERA as P51600023375 on 12 Dec 2019. The registration is recorded completed; possession was promised by 30 Dec 2025.

At a glance

Project

  • NameSHAH AND KASAR'S LAXMI PARK PHASE I
  • TypeResidential / Group Housing
  • Location
    • DEVI MANDIR ROAD
    • BHAGUR
    • Bhagur Rural
    • Nashik
    • 422402
  • Pincode422402
  • RERA no.P51600023375
  • ReraGenie IDRG-MH-05099

Builder

  • NameSHAH AND KASAR BUILDERS
  • Entity typePartnership
  • PartnersMAHENDRA KANKUCHAND SHAH, PRAMOD FAKIRRAO KASAR, LAXMIBAI FAKIRRAO KASAR

Key dates

this monthRegisteredDec 2019PromisedDec 2025Recorded completed

Key facts

Registration and timeline

  • StatusCompleted
  • Registered on12 Dec 2019
  • Promised completion30 Dec 2025
  • Revised completionNone
  • Buildings9 building records
  • Documents filed113 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
BUILDING NO BNA40000
BUILDING NO CNA40000
BUILDING NO DNA40000
BUILDING NO ENA40000
BUILDING NO FNA40000
BUILDING NO GNA40000
BUILDING NO HNA40000
BUILDING NO INA40000
BUILDING NO JNA40000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building9

As on 13 Jan 2025, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

64 of 99 construction stages are filed complete across 9 buildings. The stage furthest along is Podiums (if any), at 0%.

BUILDING NO B73%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
BUILDING NO C64%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
BUILDING NO D64%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
BUILDING NO E64%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
BUILDING NO F64%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
BUILDING NO G64%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
BUILDING NO H64%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
BUILDING NO I64%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
BUILDING NO J64%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 13 Jan 2025, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes100%
Water SupplyYes100%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsNoNot applicable
Landscaping & Tree PlantingYes100%
Street LightingYes100%
Community BuildingsYes100%
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes100%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsNoNot applicable
Electrical meter room, sub-station, receiving stationNoNot applicable
Aggregate area of recreational Open SpaceYes100%
Open ParkingYes100%

Parking filed72

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots72
Closed/Covered54
Open Space18
BuildingClosed/CoveredOpen SpaceTotal
BUILDING NO B628
BUILDING NO C628
BUILDING NO D628
BUILDING NO E628
BUILDING NO F628
BUILDING NO G628
BUILDING NO H628
BUILDING NO I628
BUILDING NO J628

Land and ownership2

MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area7,620 sq m
Land owned byThe promoter, with other names on the file
Named landowners2
LandownerVillageDistrict
MAHARAJRISHNA BANSILAL BIRMANIDeolali (CB)Nashik
ROMA MAHARAJKRISHNA BIRMANIDeolali (CB)Nashik

Approvals and building plan

Permissible FSI3810.0
Proposed, not sanctioned3,810 sq m
Buildings approved9
Buildings sanctioned9

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchDEOLALI CENTRE MALL

Certifying professionals and partners4

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectMANISH JADHAV
EngineerVIJAYKUMAR BHAGWANDAS AMESURE
Chartered AccountantMAHESH SHAH
Chartered AccountantSANKET SANGALE
PartnerRole in project
SHAH AND KASAR BUILDERS-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 4 Dec 2019
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 2 Dec 2019
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 2 Dec 2019
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 2 Dec 2019Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateOn the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    uploaded 13 Jan 2025

Documents filed113

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 113 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Architect’s Certificate on Completion of Project (Form 4)File: From 4.pdf13 Jan 2025
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: Laxmi park D and C completion certificate.pdf13 Jan 2025
Architect’s Certificate on Completion of Project (Form 4)File: Architect From 4 Final.pdf17 Oct 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Rera Audit From 5.pdf17 Oct 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: From 2 A.pdf2 May 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate.pdf20 Jan 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Certificate.pdf20 Jan 2024
Disclosure of sold/ booked inventoryFile: Sold Unsold.pdf20 Jan 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: C A Certificate_compressed.pdf20 Jan 2024
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: B Wing Compliation.pdf20 Jan 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Enginer Certificate.pdf26 Oct 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate Qty 2 shah and kasar_compressed.pdf20 Oct 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Qty 4 shah and kasar_compressed.pdf20 Oct 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Qty 1 shah and kasar_compressed.pdf20 Oct 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Qty 2 shah and kasar_compressed.pdf20 Oct 2023
Disclosure of sold/ booked inventoryFile: Sold Unsold.pdf16 Oct 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate_compressed.pdf12 Oct 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect certificate.pdf12 Oct 2023
Status of Formation of Legal Entity (Society/Co Op etc.)File: Declaration_compressed-1-8.pdf12 Oct 2023
Status of Formation of Legal Entity (Society/Co Op etc.)File: Declaration_compressed-9-16.pdf12 Oct 2023
Status of Formation of Legal Entity (Society/Co Op etc.)File: Declaration_compressed-17-24.pdf12 Oct 2023
Status of Formation of Legal Entity (Society/Co Op etc.)File: Declaration_compressed-25-32.pdf12 Oct 2023
Status of Formation of Legal Entity (Society/Co Op etc.)File: Declaration_compressed-33-40.pdf12 Oct 2023
Status of Formation of Legal Entity (Society/Co Op etc.)File: Declaration_compressed-41-48.pdf12 Oct 2023
Status of Formation of Legal Entity (Society/Co Op etc.)File: Declaration_compressed-49-56.pdf12 Oct 2023
Status of Formation of Legal Entity (Society/Co Op etc.)File: Declaration_compressed-57-62.pdf12 Oct 2023
Status of Formation of Legal Entity (Society/Co Op etc.)File: Declaration_compressed-63-69.pdf12 Oct 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Certificate.pdf11 Oct 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Enginner Certifcate.pdf11 Oct 2023
Disclosure of sold/ booked inventoryFile: Sold Unsold.pdf11 Oct 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: FROM 2 A.pdf9 Oct 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: From no 5.pdf7 Oct 2023
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: Laxmi park E,F,G,H,I,J completion certificate_compressed.pdf7 Oct 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate_compressed.pdf22 Feb 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engier Certificate_compressed.pdf22 Feb 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: C A Certificate_compressed-1-5.pdf22 Feb 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: C A Certificate_compressed-6-11.pdf22 Feb 2023
Disclosure of sold/ booked inventoryFile: Sold unsold Details_compressed.pdf16 Feb 2023
Disclosure of sold/ booked inventoryFile: Sold Unsold_compressed.pdf16 Feb 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: architects certificate.pdf26 Jan 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 Engineers certificate.pdf26 Jan 2023
Disclosure of sold/ booked inventoryFile: Sold Unsold_compressed.pdf26 Jan 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: C A Certificate_compressed-1-4.pdf26 Jan 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: C A Certificate_compressed-5-8.pdf26 Jan 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: C A Certificate_compressed-9-11.pdf26 Jan 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: annual report of sha and kasar builders_compressed.pdf26 Dec 2022
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: Engineer From 2 A.pdf1 Dec 2022
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architet Certificate_compressed.pdf24 Nov 2022
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Certificate.pdf24 Nov 2022
Disclosure of sold/ booked inventoryFile: Sold unsold.pdf24 Nov 2022
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: C A Certificate Final-1-4.pdf24 Nov 2022
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: C A Certificate Final-5-8.pdf24 Nov 2022
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: C A Certificate Final-9-12.pdf24 Nov 2022
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: Laxmi park E,F,G,H,I,J completion certificate_compressed.pdf24 Nov 2022
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: Certificat Annual Laxmi Park.pdf30 Sep 2021
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate Laxmi Park Q11-1-5_compressed.pdf19 Aug 2021
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate Laxmi Park Q11-6-11_compressed.pdf19 Aug 2021
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: SHAH AND KASAR_compressed.pdf13 Aug 2021
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Enginer Certificate.pdf12 Aug 2021
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: From no 2_compressed.pdf12 Aug 2021
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: FROM nO 2.pdf12 Aug 2021
Disclosure of sold/ booked inventoryFile: Sold Unsold_compressed.pdf9 Aug 2021
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate_compressed.pdf7 Jun 2021
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architech Certificate.pdf7 Jun 2021
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate.pdf7 Jun 2021
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Enginner RERA CERTIFICATE.pdf7 Jun 2021
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 Engineers certificate -5-01-2021-Laxmi park.pdf7 Jun 2021
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 Engineers certificate -5-04-2021-Laxmi park.pdf7 Jun 2021
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: From 2 A_compressed.pdf7 Jun 2021
Disclosure of sold/ booked inventoryFile: Sold unsold Details_compressed.pdf7 Jun 2021
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate.pdf7 Jun 2021
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA CertificateFormta.pdf7 Jun 2021
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA CertificateFormta.pdf7 Jun 2021
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Enginner Certificate RERA.pdf30 Nov 2020
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: From No 2.pdf30 Nov 2020
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architech certificate_compressed-1-5.pdf12 Oct 2020
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architech certificate_compressed-6-11.pdf12 Oct 2020
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: From 2 A_compressed.pdf12 Oct 2020
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: C A Certificate_compressed-1-5.pdf12 Oct 2020
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: C A Certificate_compressed-6-9.pdf12 Oct 2020

How this compares with Nashik

10%of Nashik projects moved their completion datethis one has not
19%of Nashik registrations have lapsed or been cancelledthis one is completed

Computed across the 4,100+ Nashik projects on ReraGenie, from their own filings.

Free monthly report: Nashik on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep SHAH AND KASAR'S LAXMI PARK PHASE I on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near BHAGUR4,100+ in Nashik

Builder: SHAH AND KASAR BUILDERS

SHAH AND KASAR BUILDERS has 1 registration on MahaRERA, including SHAH AND KASAR'S LAXMI PARK PHASE I. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Nashik district page.

Frequently asked questions

What are my rights if SHAH AND KASAR'S LAXMI PARK PHASE I is delayed beyond 30 Dec 2025?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of SHAH AND KASAR'S LAXMI PARK PHASE I?

The registered promoter entity is SHAH AND KASAR BUILDERS, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in SHAH AND KASAR'S LAXMI PARK PHASE I?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for SHAH AND KASAR'S LAXMI PARK PHASE I?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at SHAH AND KASAR'S LAXMI PARK PHASE I?

The professionals named in the filing: Architect: MANISH JADHAV; Engineer: VIJAYKUMAR BHAGWANDAS AMESURE; Chartered Accountant: MAHESH SHAH; Chartered Accountant: SANKET SANGALE. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in SHAH AND KASAR'S LAXMI PARK PHASE I?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About SHAH AND KASAR'S LAXMI PARK PHASE I. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save SHAH AND KASAR'S LAXMI PARK PHASE I to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.