Red flags

  • 1 complaint at MahaRERA

Clear

  • No litigation declared
  • Completion date never moved
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form

1 condition is on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Nagpur registration emailed to you, free during the pilot beta.
Dec 2030Possession promisedno revision filed
2 of 118Units unsoldnot recorded sold or booked
1Complaints at MahaRERAon this registration
Jump to the 53 documents Report an error

SERENITY is a Plotted project by West Midlands Ventures Pvt Ltd in Nagpur, Maharashtra, registered with MahaRERA as P50500055549 on 2 Apr 2024. Possession is promised by 31 Dec 2030. 116 of the 118 units on this registration are recorded sold or booked. 1 complaint is on record with the regulator.

At a glance

Project

  • NameSERENITY
  • TypePlotted
  • Location
    • KHASRA NO 77
    • P H NO 71
    • Shirul
    • Hingna
    • Nagpur
    • 441110
  • Pincode441110
  • RERA no.P50500055549
  • ReraGenie IDRG-MH-75297

Builder

  • NameWest Midlands Ventures Pvt Ltd
  • Entity typeCompany
  • DirectorsMukesh Chopade, Mahesh Shastrakar

Key dates

this monthRegisteredApr 2024PromisedDec 2030

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on2 Apr 2024
  • Promised completion31 Dec 2030
  • Revised completionNone
  • BuildingsNot stated in filing
  • Documents filed53 files

Current status

98%116 of 118 units booked
100.0%Work done, per cost certificate

Figures as on 25 Apr 2026, this project's latest MahaRERA filing.

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 25 Apr 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

NA Plot Without Structure:

ActivityProgress
ExcavationNot applicable
Basement (if any)Not applicable
Podiums (if any)Not applicable
PlinthNot applicable
Stilt FloorNot applicable
Slabs of Super StructureNot applicable
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/PremisesNot applicable
Sanitary Fittings within the flats / premisesNot applicable
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water TanksNot applicable
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.Not applicable
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.Not applicable

Progress on shared amenities15

As on 25 Apr 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes100%
Water SupplyYes100%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsYes100%
Landscaping & Tree PlantingNoNot applicable
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterYes100%
Solid Waste Management And DisposalYes100%
Water conservation /Rain water harvestingYes100%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsNoNot applicable
Electrical meter room, sub-station, receiving stationYes95%
Aggregate area of recreational Open SpaceYes100%
Open ParkingNoNot applicable

Land and ownership

Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area15,811 sq m
Land owned byThe promoter
Named landownersNone
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on20 Jul 2025

Approvals and building plan

Sanctioning authorityNAGPUR METROPOLITAN REGION DEVELOPMENT AUTHORITY
Permissible FSI25875.0

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branch127, RAMDASPETH, KACHIPURA, NAGPUR-10
Estimated costRs 4.25 cr
Cost incurredRs 4.25 cr
Work done100.0%
BuildingWingEstimatedIncurred
-NARs 4.25 crRs 4.25 cr

Certifying professionals and partners7

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectPRITI SHENDE
ArchitectPIYUSHA DEEPAK DHAKATE
EngineerRAMDAS WAGH
EngineerUNMESH MANOJ INGLE
Chartered AccountantRACHANA AGRAWAL
Chartered AccountantA S MUNDADA & CO
Chartered AccountantADHISH AGRAWAL
PartnerRole in project
West Midlands Ventures Pvt Ltd-

Complaints filed with MahaRERA1

Case no.ComplainantRespondentFiled
SM12500076Mrinal KatkarWest Midlands Ventures Pvt Ltd25/06/2025

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 27 Feb 2024
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 27 Feb 2024
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 27 Feb 2024
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 27 Feb 2024Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Dec 2030

Documents filed53

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: FORM-1 SHIRUR MAR26.pdf25 Apr 2026
Withdrawal Update Form 2File: FORM-2 SHIRUR MAR26.pdf25 Apr 2026
Withdrawal Update Form 3File: FORM-3 SHIRUR MAR26_compressed.pdf25 Apr 2026
Withdrawal Update Form 1File: FORM-1 SHIRUR DEC-25.pdf20 Jan 2026
Withdrawal Update Form 2File: FORM-2 SHIRUR DEC-25.pdf20 Jan 2026
Withdrawal Update Form 3File: FORM-3 SHIRUR DEC-25_compressed.pdf20 Jan 2026
Withdrawal Update Form 1File: FORM 1 ARCHITECT CERTIFICATE.pdf19 Oct 2025
Withdrawal Update Form 2File: FORM - 2 ENGINEER CERTIFICATE.pdf19 Oct 2025
Withdrawal Update Form 3File: FORM - 3 CA CERTIFICATE.pdf19 Oct 2025
Form 2A (FY 2024-2025)File: SHIRUR FORM2A 24-25.pdf30 Sep 2025
Form 5 (FY 2024-2025)File: SHIRUR FORM5 24-25.pdf22 Sep 2025
Withdrawal Update Form 1File: SHIRUR FORM 1 30june25.pdf18 Aug 2025
Withdrawal Update Form 2File: SHIRUR FORM 2 30june2025.pdf18 Aug 2025
Withdrawal Update Form 3File: SHIRUR FORM 3 30june2025_compressed.pdf18 Aug 2025
Withdrawal Update Form 1File: SHIRUR FORM 1 30june25.pdf20 Jul 2025
Withdrawal Update Form 2File: SHIRUR FORM 2 30june2025.pdf20 Jul 2025
Withdrawal Update Form 3File: SHIRUR FORM 3 30june2025_compressed.pdf20 Jul 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: SHIRUR FORM 1 MAR 25.pdf22 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: SHIRUR FORM 3 MAR 25.pdf22 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: SHIRUR FORM 2 MAR 25.pdf22 Apr 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ARCHITECTS CERTIFICATE.pdf21 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA CERTIFICATE_compressed.pdf21 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ENGINEER CERTIFICATE.pdf21 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: serenity Sept24 from 1.pdf21 Oct 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: serenity sept24 form 3_compressed.pdf21 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: serenity sept24 from 2.pdf21 Oct 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM - 1 ARCHITECT CERTIFICATE (SHIRUR) 30-06-2024.pdf2 Aug 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM -2 ENGINEER CERTIFICATE (SHIRUR) 30-06-2024.pdf2 Aug 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM - 3 CA CERTIFICATE (SHIRUR) 30-06-2024_compressed.pdf2 Aug 2024
Details of encumbrances concerned to FinanceFile: LEGAL ENCUMBRANCE.pdf13 Mar 2024
Details of encumbrances concerned to LegalFile: LEGAL ENCUMBRANCE.pdf13 Mar 2024
Other - LegalFile: sale deed shirur_compressed (1).pdf12 Mar 2024
Layout approvalFile: scan068.pdf27 Feb 2024
Building plan approval or NA orderFile: NA Order.pdf27 Feb 2024
PAN CardFile: West Midlands Ventures Pvt ltd- New Pan Card.pdf27 Feb 2024
Copy of the legal title reportFile: SEARCH REPORT SERENITY.pdf27 Feb 2024
Details of encumbrances concerned to FinanceFile: Encumbrance certificate 1.pdf27 Feb 2024
Details of encumbrances concerned to LegalFile: Encumbrance certificate 1.pdf27 Feb 2024
Copy of Layout Approval (in case of layout)File: scan068.pdf27 Feb 2024
Building Plan Approval / NA Order for plotted developmentFile: NA Order.pdf27 Feb 2024
Commencement Certificates / NA Order for plotted developmentFile: organized (4).pdf27 Feb 2024
Declaration about Commencement CertificateFile: Declaration about Commencement certificate.pdf27 Feb 2024
Declaration in FORM BFile: form B affidavit cum declaration.pdf27 Feb 2024
CERSAI detailsFile: Asset Based Search serenity.pdf27 Feb 2024
CERSAI detailsFile: Declaration regarding cersai.pdf27 Feb 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA certificate.pdf27 Feb 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: DISCLO OF INT.pdf27 Feb 2024
Proforma of Allotment letterFile: Model form of allotment letter.pdf27 Feb 2024
Proforma of Agreement for saleFile: New Format of Agreement FOR RERA.pdf27 Feb 2024
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: declaration separate bank account.pdf27 Feb 2024
Deviation Report with respect to Allotment letterFile: Deviation Report all letter.pdf27 Feb 2024
Deviation Report with respect to model copy of AgreementFile: Deviation Report agt to sale.pdf27 Feb 2024
Other - TechnicalFile: Shirur new decl 2024.pdf27 Feb 2024

How this compares with Nagpur

98%of this project is bookeddistrict median 35%
13%of Nagpur projects moved their completion datethis one has not
22%of Nagpur registrations have lapsed or been cancelledthis one is on the register

Computed across the 2,800+ Nagpur projects on ReraGenie, from their own filings.

Free monthly report: Nagpur on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep SERENITY on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near P H NO 712,800+ in Nagpur

Builder: West Midlands Ventures Pvt Ltd

West Midlands Ventures Pvt Ltd has 1 registration on MahaRERA, including SERENITY. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Nagpur district page.

Frequently asked questions

What are my rights if SERENITY is delayed beyond 31 Dec 2030?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of SERENITY?

The registered promoter entity is West Midlands Ventures Pvt Ltd, a company as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in SERENITY?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How do I read the complaint cases filed against SERENITY?

Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.

How current is the construction progress shown for SERENITY?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at SERENITY?

The professionals named in the filing: Architect: PRITI SHENDE; Architect: PIYUSHA DEEPAK DHAKATE; Engineer: RAMDAS WAGH; Engineer: UNMESH MANOJ INGLE; Chartered Accountant: RACHANA AGRAWAL; Chartered Accountant: A S MUNDADA & CO. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in SERENITY?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About SERENITY. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save SERENITY to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.