ReraGenieLog inGet a buyer report

Home / Browse projects / Pune, Maharashtra / SERENITY

Registration lapsed No litigation declared Residential / Group Housing project

SERENITY

By UTTAM DEVELOPERS

RG-MH-54724 · RERA P52100055680 · Last updated on MahaRERA portal: 6 Jun 2025

Source: official MahaRERA filing

Red flags

  • Registration lapsed
  • Possession 17 months past the filed date

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form

2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.
May 2025Possession promised17 months past this date
8 of 22Construction stages doneacross 2 buildings; furthest along: Internal walls, 60%
3 of 34Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 64 documents Report an error

SERENITY is a Residential / Group Housing project by UTTAM DEVELOPERS in Pune, Maharashtra, registered with MahaRERA as P52100055680 on 8 Apr 2024. Possession was promised by 31 May 2025 and is now 17 months past that date. 31 of the 34 units on this registration are recorded sold or booked, and 8 of 22 construction stages are filed complete.

At a glance

Project

  • NameSERENITY
  • TypeResidential / Group Housing
  • Location
    • TALEGOUN CHAKAN ROAD
    • NEAR OLD ATHERVA HOSPITAL
    • Talegaon Dabhade (R)
    • Mawal
    • Pune
    • 410507
  • Pincode410507
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P52100055680
  • ReraGenie IDRG-MH-54724

Builder

  • NameUTTAM DEVELOPERS
  • Entity typePartnership
  • PartnersANUJ KANTILAL CHAUHAN, SHANTILAL JADAVAJI SAVANI, DILIP KARAMSHI SAPARIYA, SHITAL PRABHULAL CHOTHANI, PRAVINA JAYESH SAPARIYA
  • Declared earlier projects4 →

Key dates

17 months past promisethis monthRegisteredApr 2024PromisedMay 2025

Key facts

Registration and timeline

  • StatusRegistration lapsed
  • Registered on8 Apr 2024
  • Promised completion31 May 2025
  • Revised completionNone
  • Buildings2 building records
  • Documents filed64 files

Current status

91%31 of 34 units booked

Figures as on 6 Jun 2025, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Building ANA8234034
Building BNA30000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building2

As on 6 Jun 2025, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

8 of 22 construction stages are filed complete across 2 buildings. The stage furthest along is Internal walls, at 60%.

Building A57%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises60%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks50%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.20%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Building B29%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor20%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 6 Jun 2025, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes0%
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes70%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes0%
Street LightingYes0%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes0%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsNoNot applicable
Electrical meter room, sub-station, receiving stationNoNot applicable
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingYes0%

Parking filed50

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots50
Closed/Covered2
Open Space48
BuildingClosed/CoveredOpen SpaceTotal
Building A14748
Building B112

Land and ownership

Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area798 sq m
Land owned byThe promoter
Named landownersNone
Encumbrance on the landDeclared none
Declared on3 Jun 2025

Approvals and building plan

Sanctioning authorityTalegoun Dhabade Nagar Parisad
Permissible FSI2327.63
Proposed, not sanctioned2,128 sq m
Buildings approved2
Buildings sanctioned2

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchAXIS BANK OPP GARDEN MULUND EAST MUMBAI 400081

Certifying professionals and partners3

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectMayur RajGurav
EngineerPrabhulal Chothani
Chartered AccountantNikunj s Shah
PartnerRole in project
UTTAM DEVELOPERS-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 1 Feb 2024
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 16 Dec 2023
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 16 Dec 2023
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 18 Jan 2024Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot on the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

Documents filed64

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Form 1File: UA architect certificate 22 4 25 OK Mar.pdf6 Jun 2025
Form 2File: UA engineer certificate 28 4 25.pdf6 Jun 2025
Form 3File: UA c a certificate 29 4 25.pdf6 Jun 2025
Self-declaration of Quarterly ProgressFile: Devloper Disclosure 30 03 2025 .pdf6 Jun 2025
Disclosure of Sold and Booked InventoryFile: dOSCLOSE OF iNVENTORY 28 03 2025 .pdf6 Jun 2025
Form 1File: U DEV Architect Certificate 9 1 25 dec 24 0k.pdf6 Jun 2025
Form 2File: U DEVEngineer letter 30 1 25.pdf6 Jun 2025
Form 3File: U DEV C A Certificate 27 11 24.pdf6 Jun 2025
Self-declaration of Quarterly ProgressFile: Devloper Disclosure 30 12 2024.pdf6 Jun 2025
Disclosure of Sold and Booked InventoryFile: dOSCLOSE OF iNVENTORY 18 11 2024.pdf6 Jun 2025
Form 2File: U DEV Engineer certificate 15 10 24.pdf6 Jun 2025
Form 3File: U DEV CA CERTIFICATE 19 8 24.pdf6 Jun 2025
Form 1File: U DEV Architect Certificate 19-08-24 Sept 24 ok.pdf6 Jun 2025
Disclosure of Sold and Booked InventoryFile: dOSCLOSE OF iNVENTORY 28 08 2024.pdf6 Jun 2025
Self-declaration of Quarterly ProgressFile: Devloper Disclosure 30 09 2024.pdf6 Jun 2025
Form 1File: U DEV Architect Certificate 30 06 2024 OK.pdf6 Jun 2025
Form 2File: U DEV CA CERTIFICATE 19 8 24.pdf6 Jun 2025
Form 3File: U DEV CA CERTIFICATE 19 8 24.pdf6 Jun 2025
Self-declaration of Quarterly ProgressFile: Devloper Disclosure 30 o6 2024.pdf6 Jun 2025
Disclosure of Sold and Booked InventoryFile: dOSCLOSE OF iNVENTORY 28 08 2024 .pdf6 Jun 2025
Form 2A (FY 2024-2025)File: SERENITY EC 2024-25.pdf4 Jun 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Atlanta quality Septmber 2024.pdf15 Oct 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Atlanta quality Septmber 2024.pdf15 Oct 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Atlanta quality Septmber 2024.pdf15 Oct 2024
Disclosure of sold/ booked inventoryFile: UTTAM DEVELOPERS_compressed.pdf11 Oct 2024
Disclosure of sold/ booked inventoryFile: UTTAM DEVELOPERS_compressed.pdf11 Oct 2024
Disclosure of sold/ booked inventoryFile: UTTAM DEVELOPERS_compressed.pdf11 Oct 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate 19-08-24.pdf6 Oct 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA CERTIFICATE 19 8 24-1.pdf6 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer certificate 19 8 24.pdf6 Oct 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate 19-08-24.pdf6 Oct 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA CERTIFICATE 19 8 24-1.pdf6 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer certificate 19 8 24.pdf6 Oct 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate 19-08-24.pdf6 Oct 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA CERTIFICATE 19 8 24-1.pdf6 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer certificate 19 8 24.pdf6 Oct 2024
Details of encumbrances concerned to FinanceFile: Encumbrances-Finance 10122023.pdf6 Apr 2024
Details of encumbrances concerned to LegalFile: Encumbrances-Finance 10122023.pdf6 Apr 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form-1 Architect Certificate.pdf6 Apr 2024
Other - TechnicalFile: Declaration abt Commencement Certificate.pdf6 Apr 2024
Other - TechnicalFile: Declaration abt Separate Bank Ac Details 29032024.pdf6 Apr 2024
Other - TechnicalFile: CERSAI Search Report 06042024.pdf6 Apr 2024
CERSAI detailsFile: CRESAI UNDERTAKING.pdf5 Mar 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA certificate compress.pdf12 Feb 2024
Copy of the legal title reportFile: New Serenity search report.pdf1 Feb 2024
Details of encumbrances concerned to FinanceFile: Details of Encumberance Serenity.pdf18 Jan 2024
Details of encumbrances concerned to LegalFile: Details of Encumberance Serenity.pdf18 Jan 2024
Commencement Certificates / NA Order for plotted developmentFile: muncipal approval Serenity.pdf18 Jan 2024
Proforma of Allotment letterFile: PERFORMA ALLOTMEENT SERENITY.pdf18 Jan 2024
Deviation Report with respect to Allotment letterFile: deviation of allotment letter.pdf3 Jan 2024
Commencement Certificates / NA Order for plotted developmentFile: serinity commencemne CERTIFICATE_compressed.pdf2 Jan 2024
Details of encumbrances concerned to FinanceFile: Details ofe Encurbement Legal.pdf27 Dec 2023
Details of encumbrances concerned to LegalFile: Details ofe Encurbement Legal.pdf27 Dec 2023
Declaration about Commencement CertificateFile: Decclration of Commecment Sernity.pdf17 Dec 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: disclosed of Interest merged.pdf17 Dec 2023
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Separate Bank account Serenity.pdf17 Dec 2023
Deviation Report with respect to model copy of AgreementFile: Copy of Agreeemtn Serenity.pdf17 Dec 2023
Building plan approvalFile: SERNITY APPROVED PLAN_compressed.pdf16 Dec 2023
Layout approvalFile: SERNITY APPROVED PLAN_compressed.pdf16 Dec 2023
PAN CardFile: 1 Uttam Developers PAN.pdf16 Dec 2023
Copy of Layout Approval (in case of layout)File: SERNITY APPROVED PLAN_compressed.pdf16 Dec 2023
Building Plan Approval / NA Order for plotted developmentFile: SERNITY APPROVED PLAN_compressed.pdf16 Dec 2023
Declaration in FORM BFile: FORM B serenity.pdf16 Dec 2023
Proforma of Agreement for saleFile: RERA Agreement for Sale Serenity draft PDF.pdf16 Dec 2023

Promoter's earlier projects4

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

2 delivered on promise2 delivered late
ProjectLocationFlatsStatusPromisedDelivered
PARAMOUNTPLOT NO 12 32 A MASKARNIS COLONY AND TUKARAM NAGAR TALEGAOUN DHABADE PUNE42CompletedMar 2024Dec 2023
CROWNPLOT NO 129 130 SWARAJ NAGARI TALEGOUN CHAKAN ROAD TALEGAOUN DABHADE PUNE15CompletedMar 2023Late, Apr 2023
Atmospherplot no 1 Parijat co op hus society talegaon dhabade pune 41050728CompletedDec 2022Oct 2022
ELEMENTSPLOT NO 78 CTS NO 328 YASHWANT NAGAR TALEGOUN DHABADE PUNE20CompletedSep 2018Late, Nov 2018

How this compares with Pune

91%of this project is bookeddistrict median 31%
26%of Pune projects moved their completion datethis one has not
26%of Pune registrations have lapsed or been cancelledthis one is among them

Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.

Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep SERENITY on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near NEAR OLD ATHERVA HOSPITAL13,700+ in Pune

2 kmSERENITYCompleted 45Lapsed / revoked 36Other 44Dot size: filed unitsN

Filed coordinates, straight-line distance. 125 registered projects within 2 km.

Builder: UTTAM DEVELOPERS

UTTAM DEVELOPERS has 1 registration on MahaRERA, including SERENITY. Its filings disclose 4 earlier MahaRERA projects: declares 2 of 4 past projects completed on time. Read the full track record. See more projects on the Pune district page.

Frequently asked questions

What does it mean that SERENITY shows as registration lapsed on MahaRERA?

A registration runs until the completion date the promoter declared. If the project is neither completed nor extended by then it lapses, and a de-registration or revocation ends it by order. In every case the promoter may no longer legally advertise, market or sell in the project, and the Authority can act under section 7 against a defaulting promoter. What it does not do is cancel an agreement for sale you have already signed, or extinguish your section 18 right to delay interest or refund; those run from your agreement, not from the registration. Get the current position from the promoter in writing, verify it on the MahaRERA portal, and take legal advice before paying any further instalment.

What are my rights if SERENITY is delayed beyond 31 May 2025?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of SERENITY?

The registered promoter entity is UTTAM DEVELOPERS, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in SERENITY?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for SERENITY?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at SERENITY?

The professionals named in the filing: Architect: Mayur RajGurav; Engineer: Prabhulal Chothani; Chartered Accountant: Nikunj s Shah. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in SERENITY?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About SERENITY. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save SERENITY to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.