ReraGenieLog inGet a buyer report

Home / Browse projects / Solapur, Maharashtra / SATYA SHANTI VIHAR

Completed No litigation declared Residential / Group Housing project

SATYA SHANTI VIHAR

By ANWARHUSEN MAHAMUD SHAIKH

RG-MH-24493 · RERA P52600010948 · Last updated on MahaRERA portal: 12 Oct 2023

Source: official MahaRERA filing

Red flags

  • Completion date moved by 16 months
  • 1 extension taken

Clear

  • No litigation declared
  • No complaints on record
  • Separate project account declared
  • Allotment letter follows the model form
  • Recorded completed on MahaRERA

2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Solapur registration emailed to you, free during the pilot beta.
Jan 2022Possession promisedregistration recorded completed
1 of 11Construction stages donefurthest along: Stilt Floor, 60%
0Complaints at MahaRERAon this registration
Jump to the 34 documents Report an error

SATYA SHANTI VIHAR is a Residential / Group Housing project by ANWARHUSEN MAHAMUD SHAIKH in Solapur, Maharashtra, registered with MahaRERA as P52600010948 on 31 Aug 2017. The registration is recorded completed; possession was promised by 31 Jan 2022. The completion date has moved by 16 months from the original filing.

At a glance

Project

  • NameSATYA SHANTI VIHAR
  • TypeResidential / Group Housing
  • Location
    • Solapur (M Corp.)
    • Solapur North
    • Solapur
    • 413004
  • Pincode413004
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P52600010948
  • ReraGenie IDRG-MH-24493

Builder

  • NameANWARHUSEN MAHAMUD SHAIKH
  • Entity typeIndividual

Key dates

this monthRegisteredAug 2017First promiseSep 2020Revised toJan 2022Recorded completed

Key facts

Registration and timeline

  • StatusCompleted
  • Registered on31 Aug 2017
  • Promised completion31 Jan 2022
  • Revised completionRevised to 31 Jan 2022 (originally 30 Sep 2020)
  • Buildings1 building record
  • Documents filed34 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
SATYA SHANTI VIHARNA70000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 12 Oct 2023, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

1 of 11 construction stages are filed complete. The stage furthest along is Stilt Floor, at 60%.

SATYA SHANTI VIHAR: 25% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor60%
Slabs of Super Structure50%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises20%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks30%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.10%

Progress on shared amenities15

As on 12 Oct 2023, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsNoNot applicable
Landscaping & Tree PlantingNoNot applicable
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes0%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Land and ownership

MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area248 sq m
Land owned byThe promoter
Named landownersNone

Approvals and building plan

Permissible FSI371.57
Proposed, not sanctioned372 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchSOLAPUR

Certifying professionals and partners1

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectTOHID SHAIKH
PartnerRole in project
ANWARHUSEN MAHAMUD SHAIKH-

Extensions applied for1

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EXT52600009334Sep 2020 → Jul 2021

Reason as filed by the promoterDear Sir, Due to covid 19 pandemic our final work in the apartment 'satya shanti vihar' was withold. Now the building is in completion phase but we need extension in order to complete the building. Thanks

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 31 Jul 2017
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 31 Jul 2017
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 31 Jul 2017
  4. Commencement CertificateNot on the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

  5. Occupancy CertificateOn the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    uploaded 9 May 2023

Documents filed34

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Architect’s Certificate on Completion of Project (Form 4)File: Architect Certificate For Project Completion (Form 4)Satya Shanti Vihar[1].pdf12 Oct 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect Certificate (Form 1) 18.pdf23 Sep 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect Certificate (Form 1) 19.pdf23 Sep 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect Certificate (Form 1) 20.pdf23 Sep 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect Certificate (Form 1) 21.pdf23 Sep 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect Certificate (Form 1) 22.pdf23 Sep 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineer Certificate For Cost Estimation (Form 2) 18.pdf23 Sep 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineer Certificate For Cost Estimation (Form 2) 19.pdf23 Sep 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineer Certificate For Cost Estimation (Form 2) 20.pdf23 Sep 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineer Certificate For Cost Estimation (Form 2) 21.pdf23 Sep 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineer Certificate For Cost Estimation (Form 2) 22.pdf23 Sep 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: Engineer Quality Assurance Certificate (Form 2A) 18.pdf23 Sep 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: Engineer Quality Assurance Certificate (Form 2A) 19.pdf23 Sep 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: Engineer Quality Assurance Certificate (Form 2A) 20.pdf23 Sep 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Engineer Quality Assurance Certificate (Form 2A) 21.pdf23 Sep 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: Engineer Quality Assurance Certificate (Form 2A) 22.pdf23 Sep 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: satya shanthi vihar form 1 (1).pdf9 May 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: satya shanthi vihar form 1 (1).pdf9 May 2023
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: Satya Shanti OC Declaration.pdf9 May 2023
Status of Formation of Legal Entity (Society/Co Op etc.)File: Satya Shanti Legal Entity Declaration.pdf9 May 2023
Status of ConveyanceFile: dod (2)_11zon.pdf9 May 2023
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: Untitled-1_compressed.pdf20 Oct 2022
Building plan approvalFile: BUILDING MAP.pdf31 Jul 2017
Layout approvalFile: SMC PERMISSION.pdf31 Jul 2017
PAN CardFile: PAN CARD.pdf31 Jul 2017
Copy of the legal title reportFile: 7 12 EXTRACT.pdf31 Jul 2017
Details of encumbrancesFile: SEARCH REPORT.pdf31 Jul 2017
Copy of Layout Approval (in case of layout)File: SMC PERMISSION.pdf31 Jul 2017
Building Plan Approval (IOD)File: BUILDING MAP.pdf31 Jul 2017
Declaration in FORM BFile: FORM B.pdf31 Jul 2017
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: ARCHITECH CERTIFICATE.pdf31 Jul 2017
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: ENGINEERS CERTIFICATE.pdf31 Jul 2017
Certificates of CA (Form 3)File: CA CERTIFICATE.pdf31 Jul 2017
Proforma of Allotment letterFile: rera agreement.pdf31 Jul 2017

How this compares with Solapur

15%of Solapur projects moved their completion datethis one moved by 16 months
39%of Solapur registrations have lapsed or been cancelledthis one is completed

Computed across the 550+ Solapur projects on ReraGenie, from their own filings.

Keep SATYA SHANTI VIHAR on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Solapur (M Corp.)550+ in Solapur

Builder: ANWARHUSEN MAHAMUD SHAIKH

ANWARHUSEN MAHAMUD SHAIKH has 1 registration on MahaRERA, including SATYA SHANTI VIHAR. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Solapur district page.

Frequently asked questions

What are my rights if SATYA SHANTI VIHAR is delayed beyond 31 Jan 2022?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of SATYA SHANTI VIHAR?

The registered promoter entity is ANWARHUSEN MAHAMUD SHAIKH, an individual as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in SATYA SHANTI VIHAR?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for SATYA SHANTI VIHAR?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at SATYA SHANTI VIHAR?

The professionals named in the filing: Architect: TOHID SHAIKH. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in SATYA SHANTI VIHAR?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About SATYA SHANTI VIHAR. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save SATYA SHANTI VIHAR to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.