Registered No litigation declared Residential / Group Housing project

SATGURUS KISMET

By JGB BUILDERS LLP

RG-MH-18538 · RERA P51800076939 · Last updated on MahaRERA portal: 15 Jun 2026

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form
  • All 1 earlier projects delivered on promise

Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against every project registered within 2 km.

See what the report covers Free either way: or have every new Mumbai Suburban registration emailed to you, free during the pilot beta.
Dec 2027Possession promisedno revision filed
6 of 11Construction stages donefurthest along: Staircases, 90%
34 of 38Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 79 documents Report an error

SATGURUS KISMET is a Residential / Group Housing project by JGB BUILDERS LLP in Mumbai Suburban, Maharashtra, registered with MahaRERA as P51800076939 on 9 Jul 2024. Possession is promised by 15 Dec 2027. 4 of the 38 units on this registration are recorded sold or booked, and 6 of 11 construction stages are filed complete.

At a glance

Project

  • NameSATGURUS KISMET
  • TypeResidential / Group Housing
  • Location
    • Carter Road
    • Bandra West
    • Bandra
    • Andheri
    • Mumbai Suburban
    • 400050
  • Pincode400050
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51800076939
  • ReraGenie IDRG-MH-18538

Builder

  • NameJGB BUILDERS LLP
  • Entity typePartnership
  • GSTIN27AAPFJ8058G1ZU
  • PartnersMOHAN JETHANAND BABANI, PRAKASH JETHANAND BABANI, RAMESH JETHANAND BABANI, SHARAN MOHAN BABANI, ANMOL PRAKASH BABANI, KUNAL RAMESH BABANI
  • Declared earlier projects1 →

Key dates

this monthRegisteredJul 2024PromisedDec 2027

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on9 Jul 2024
  • Promised completion15 Dec 2027
  • Revised completionNone
  • Buildings1 building record
  • Documents filed79 files

Current status

11%4 of 38 units booked
78.1%Work done, per cost certificate

Figures as on 15 Jun 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
SATGURUS KISMETNA191338038

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 15 Jun 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

6 of 11 construction stages are filed complete. The stage furthest along is Staircases, at 90%.

SATGURUS KISMET: 77% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises40%
Sanitary Fittings within the flats / premises30%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks90%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.50%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.40%

Progress on shared amenities15

As on 15 Jun 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes40%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes25%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes0%
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalYes60%
Water conservation /Rain water harvestingYes40%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes40%
Electrical meter room, sub-station, receiving stationYes40%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Parking filed99

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots99
Closed/Covered99

Land and ownership1

MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area1,664 sq m
Land owned byNot the promoter
Named landowners1
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on8 Jun 2026
LandownerVillageDistrict
EMPIRE KISMET CO-OPERATIVE HOUSING SOCIETY LTDBandraMumbai Suburban

Approvals and building plan

Sanctioning authorityMCGM
Permissible FSI5664.23
Proposed, not sanctioned5,664 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchRadha Swami Apartments 36th Road Bandra West Mumbai 400050
Estimated costRs 95.00 cr
Cost incurredRs 74.22 cr
Work done78.13%
BuildingWingEstimatedIncurred
SATGURUS KISMETNARs 49.00 crRs 46.63 cr
-NARs 46.00 crRs 27.59 cr

Certifying professionals and partners5

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectYMS Consultants Ltd
EngineerFURKHAN I PETTIWALA
EngineerConcrete Concepts
Chartered AccountantPRADEEP CHOWDHRY & ASSOCIATES
Chartered AccountantDK JHANWAR AND ASSOCIATES
PartnerRole in project
JGB BUILDERS LLP-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 18 Jun 2024
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 18 Jun 2024
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 10 Feb 2026
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 18 Jun 2024Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 15 Dec 2027

Documents filed79

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: form 1 - architect certificate jan feb mar 2026_260514_195505.pdf15 Jun 2026
Withdrawal Update Form 2File: form 2- costing certificate jan feb mar 2026_260514_195530.pdf15 Jun 2026
Withdrawal Update Form 3File: Form 3.pdf15 Jun 2026
Withdrawal Update Form 1File: form 1 - architect certificate jan feb mar 2026_260514_195505.pdf25 May 2026
Withdrawal Update Form 2File: form 2- costing certificate jan feb mar 2026_260514_195530.pdf25 May 2026
Withdrawal Update Form 3File: form 3 - ca certificate jan feb mar 2026_260514_195548.pdf25 May 2026
Building plan approvalFile: amended plan iod Drawing-185.pdf10 Feb 2026
Building plan approvalFile: 2503117Amendletter_signed.pdf10 Feb 2026
Withdrawal Update Form 1File: Form 1 Withdrawal Application Form1 (oct nov dec 2025 qtr dt 30-01-2026).pdf4 Feb 2026
Withdrawal Update Form 2File: Form 2 EnggCertificate kismet Oct 25 To Dec 25.pdf4 Feb 2026
Withdrawal Update Form 3File: Form 3 CA Certificate kismet Oct 25 to Dec 2025 dt 3-feb-2026_compressed.pdf4 Feb 2026
Form 2A (FY 2024-2025)File: Form 2A - Site Supervisor Quality Assurance Certificate for FY 2024-25 dt 2-apr-2025.pdf22 Jan 2026
Withdrawal Update Form 1File: Form 1 - Architect Certificate (Apr-May-June 2025).pdf21 Jan 2026
Withdrawal Update Form 1File: Form 1 Architect Certificate for July Aug Sep 2025 dt 13-11-2025.pdf21 Jan 2026
Withdrawal Update Form 2File: Form 2 - Costing Certificate no 4 (kismet) dt 1-July-2025.pdf21 Jan 2026
Withdrawal Update Form 2File: Form 2 - Costing Certificate no 4 kismet for July Aug Sep 2025 qtr dt 13-11-2025.pdf21 Jan 2026
Withdrawal Update Form 3File: Form 3 - CA Certificate (Apr-May-June 2025).pdf21 Jan 2026
Withdrawal Update Form 3File: Form 3 - CA Certificate for July Aug Sep 2025 Qtr dt 13-nov-2025.pdf21 Jan 2026
Withdrawal Update Form 1File: Form 1 Architect Certificate for July Aug Sep 2025 dt 13-11-2025.pdf16 Jan 2026
Withdrawal Update Form 1File: Form 1 Architect Certificate for July Aug Sep 2025 dt 13-11-2025.pdf16 Jan 2026
Withdrawal Update Form 2File: Form 2 - Costing Certificate no 4 kismet for July Aug Sep 2025 qtr dt 13-11-2025.pdf16 Jan 2026
Withdrawal Update Form 2File: Form 2 - Costing Certificate no 4 kismet for July Aug Sep 2025 qtr dt 13-11-2025.pdf16 Jan 2026
Withdrawal Update Form 3File: Form 3 - CA Certificate for July Aug Sep 2025 Qtr dt 13-nov-2025.pdf16 Jan 2026
Withdrawal Update Form 3File: Form 3 - CA Certificate for July Aug Sep 2025 Qtr dt 13-nov-2025.pdf16 Jan 2026
Form 5 (FY 2024-2025)File: Correct Form 5 (4).pdf31 Oct 2025
Withdrawal Update Form 1File: Form 1 - Architect Certificate (Apr-May-June 2025).pdf29 Sep 2025
Withdrawal Update Form 2File: Form 2 - Costing Certificate no 4 (kismet) dt 1-July-2025.pdf29 Sep 2025
Withdrawal Update Form 3File: Form 3 - CA Certificate (Apr-May-June 2025).pdf29 Sep 2025
Form 1File: Form 1 - Architect Certificate dated 31st March 2025.pdf25 Jun 2025
Form 2File: Form 2 - Costing Certificate dated 31st March 2025.pdf25 Jun 2025
Form 3File: Form - 3 CA Certificate dt 9 april 2025.pdf25 Jun 2025
Disclosure of Sold and Booked InventoryFile: satguru kismet - sold and unsold inventory on letterhead dt 25-6-2025.pdf25 Jun 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 - Architect Certificate 31st March 2025.pdf3 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - Engineer Certificate 2nd April 2025.pdf3 Apr 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Form 2A - Site Supervisor Quality Assurance Certificate 2024 to 2025.pdf3 Apr 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: BMC ARCHITECT RERA CERTIFICATE DT 17-12-2024.pdf23 Dec 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA certificate dt 21-12-2024_compressed.pdf23 Dec 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Costing Rera Certificate(17-12-2024).pdf23 Dec 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Rera Certificate no 1 dated 13th August 2024.pdf7 Oct 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Rera Certificate no 1 dated 22nd August 2024.pdf7 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Certificate no 1 dated 12th August 2024.pdf7 Oct 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Rera Certificate no 1 dated 13th August 2024.pdf7 Oct 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Rera Certificate no 1 dated 22nd August 2024.pdf7 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Certificate no 1 dated 12th August 2024.pdf7 Oct 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form - 3 Rera Certificate - Revised V2 dt 26-06-2024.pdf27 Jun 2024
Proforma of Agreement for saleFile: Kismet AFS with Parking.pdf27 Jun 2024
Proforma of Allotment letterFile: Kismet Allotment with Parking.pdf25 Jun 2024
Deviation Report with respect to Allotment letterFile: deviation report allotment letter.pdf25 Jun 2024
Deviation Report with respect to model copy of AgreementFile: deviation report afs_compressed.pdf25 Jun 2024
Layout approvalFile: 1 Copy of Layout Approval (in case of layout).pdf18 Jun 2024
Layout approvalFile: 2 Copy of Layout Approval (in case of layout).pdf18 Jun 2024
Layout approvalFile: 3 Copy of Layout Approval (in case of layout).pdf18 Jun 2024
Layout approvalFile: 4 Copy of Layout Approval (in case of layout).pdf18 Jun 2024
Layout approvalFile: 5 Copy of Layout Approval (in case of layout).pdf18 Jun 2024
Building plan approvalFile: 1 Building Plan Approval _ NA Order for plotted development.pdf18 Jun 2024
PAN CardFile: 1 PAN Card.pdf18 Jun 2024
Copy of the legal title reportFile: 1 Copy of the legal title report.pdf18 Jun 2024
Details of encumbrances concerned to FinanceFile: 1 a Details of encumbrances concerned to Finance.pdf18 Jun 2024
Details of encumbrances concerned to FinanceFile: 2 b Details of encumbrances concerned to Legal.pdf18 Jun 2024
Details of encumbrances concerned to LegalFile: 1 a Details of encumbrances concerned to Finance.pdf18 Jun 2024
Details of encumbrances concerned to LegalFile: 2 b Details of encumbrances concerned to Legal.pdf18 Jun 2024
Copy of Layout Approval (in case of layout)File: 1 Copy of Layout Approval (in case of layout).pdf18 Jun 2024
Copy of Layout Approval (in case of layout)File: 2 Copy of Layout Approval (in case of layout).pdf18 Jun 2024
Copy of Layout Approval (in case of layout)File: 3 Copy of Layout Approval (in case of layout).pdf18 Jun 2024
Copy of Layout Approval (in case of layout)File: 4 Copy of Layout Approval (in case of layout).pdf18 Jun 2024
Copy of Layout Approval (in case of layout)File: 5 Copy of Layout Approval (in case of layout).pdf18 Jun 2024
Building Plan Approval / NA Order for plotted developmentFile: 1 Building Plan Approval _ NA Order for plotted development.pdf18 Jun 2024
Commencement Certificates / NA Order for plotted developmentFile: 1 Commencement Certificates _ NA Order for plotted development.pdf18 Jun 2024
Declaration about Commencement CertificateFile: Declaration reg CC - dt 7-6-2024 notarized.pdf18 Jun 2024
Declaration in FORM BFile: 1 Declaration in FORM B.pdf18 Jun 2024
CERSAI detailsFile: 1 CERSAI details.pdf18 Jun 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: 1 Disclosure of Interest in Other Real Estate Organizations.pdf18 Jun 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: 2 Disclosure of Interest in Other Real Estate Organizations.pdf18 Jun 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: 3 Disclosure of Interest in Other Real Estate Organizations.pdf18 Jun 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: 4 Disclosure of Interest in Other Real Estate Organizations.pdf18 Jun 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: 5 Disclosure of Interest in Other Real Estate Organizations.pdf18 Jun 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: 6 Disclosure of Interest in Other Real Estate Organizations.pdf18 Jun 2024
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: 1 Separate Bank Account details including no encumbrances on the Bank Account or no escrow18 Jun 2024
Other - TechnicalFile: Order 50.pdf18 Jun 2024

Promoter's earlier projects1

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

1 delivered on promise
ProjectLocationFlatsStatusPromisedDelivered
SATGURUS RENDEZVOUSC 473 Corner of Perry Road and St Cyril Road Bandra West Mumbai 40005037CompletedDec 2024Mar 2024

How this compares with Mumbai Suburban

11%of this project is bookeddistrict median 30%
33%of Mumbai Suburban projects moved their completion datethis one has not
21%of Mumbai Suburban registrations have lapsed or been cancelledthis one is on the register

Computed across the 6,700+ Mumbai Suburban projects on ReraGenie, from their own filings.

Free monthly report: Mumbai on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep SATGURUS KISMET on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Bandra West6,700+ in Mumbai Suburban

2 kmSATGURUS KISMETCompleted 85Lapsed / revoked 42Other 101Dot size: filed unitsN

Filed coordinates, straight-line distance. 228 registered projects within 2 km.

Builder: JGB BUILDERS LLP

JGB BUILDERS LLP has 1 registration on MahaRERA, including SATGURUS KISMET. Its filings disclose 1 earlier MahaRERA project: declares 1 of 1 past projects completed on time. Read the full track record. See more projects on the Mumbai Suburban district page.

Frequently asked questions

What are my rights if SATGURUS KISMET is delayed beyond 15 Dec 2027?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of SATGURUS KISMET?

The registered promoter entity is JGB BUILDERS LLP, a partnership as per the filing. Its GSTIN 27AAPFJ8058G1ZU can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in SATGURUS KISMET?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for SATGURUS KISMET?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at SATGURUS KISMET?

The professionals named in the filing: Architect: YMS Consultants Ltd; Engineer: FURKHAN I PETTIWALA; Engineer: Concrete Concepts; Chartered Accountant: PRADEEP CHOWDHRY & ASSOCIATES; Chartered Accountant: DK JHANWAR AND ASSOCIATES. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in SATGURUS KISMET?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About SATGURUS KISMET. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save SATGURUS KISMET to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.