Registered No litigation declared Others project

SATELLITE HEIGHTS

By NEELESHWAR DEVELOPERS

RG-MH-04172 · RERA P51800021643 · Last updated on MahaRERA portal: 14 May 2026

Source: official MahaRERA filing

Red flags

  • 7 complaints at MahaRERA
  • Completion date moved by 42 months
  • 2 extensions taken

Clear

  • No litigation declared
  • Separate project account declared
  • Allotment letter follows the model form

3 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Mumbai Suburban registration emailed to you, free during the pilot beta.
Dec 2026Possession promisedmoved 42 months from the original
4 of 11Construction stages donefurthest along: Slabs of Super Structure, 80%
17 of 95Units unsoldnot recorded sold or booked
7Complaints at MahaRERAon this registration
Jump to the 83 documents Report an error

SATELLITE HEIGHTS is a Others project by NEELESHWAR DEVELOPERS in Mumbai Suburban, Maharashtra, registered with MahaRERA as P51800021643 on 16 Jul 2019. Possession is promised by 31 Dec 2026. The completion date has moved by 42 months from the original filing. 78 of the 95 units on this registration are recorded sold or booked, and 4 of 11 construction stages are filed complete. 7 complaints are on record with the regulator.

At a glance

Project

  • NameSATELLITE HEIGHTS
  • TypeOthers
  • Location
    • NEW LINK ROAD
    • JOGESHWARI WEST
    • Andheri
    • Mumbai Suburban
    • 400102
  • Pincode400102
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51800021643
  • ReraGenie IDRG-MH-04172

Builder

  • NameNEELESHWAR DEVELOPERS
  • Entity typePartnership
  • PartnersDINESH ISHWARLAL DESAI, JAYESH ISHWARLAL DESAI

Key dates

this monthRegisteredJul 2019First promiseJun 2023Revised toDec 2026

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on16 Jul 2019
  • Promised completion31 Dec 2026
  • Revised completionRevised to 31 Dec 2026 (originally 30 Jun 2023)
  • Buildings1 building record
  • Documents filed83 files

Current status

82%78 of 95 units booked

Figures as on 14 May 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Satellite HeightsNA222291495

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 14 May 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

4 of 11 construction stages are filed complete. The stage furthest along is Slabs of Super Structure, at 80%.

Satellite Heights: 65% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure80%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises55%
Sanitary Fittings within the flats / premises50%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks50%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.40%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.40%

Progress on shared amenities15

As on 14 May 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes45%
Water SupplyYes35%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes40%
Storm Water DrainsYes40%
Landscaping & Tree PlantingYes40%
Street LightingYes35%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingNoNot applicable
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes40%
Electrical meter room, sub-station, receiving stationYes40%
Aggregate area of recreational Open SpaceYes0%
Open ParkingYes0%

Parking filed36

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots36
Closed/Covered1
Open Space35

Land and ownership

MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area3,737 sq m
Land owned byThe promoter
Named landownersNone

Approvals and building plan

Sanctioning authoritySLUM REHABILITATION AUTHORITY
Permissible FSI13943.7
Proposed, not sanctioned13,944 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchMAIN BRANCH,5,GROUND FLOOR,RANI SATI MARG, MUMBAI 400097

Certifying professionals and partners4

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectVIVEK BHOLE
EngineerBHAVESH PARMAR
Chartered AccountantSANJAY SHAH
Chartered AccountantVIPUL GHARPURE
PartnerRole in project
NEELESHWAR DEVELOPERS-

Extensions applied for2

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EXT51800017948Jun 2023 → Jun 2024

Reason as filed by the promoterIn accordance with circular no 28, we hereby apply for extension of our project u/s 6 in Format B. The project was delayed for reasons beyond our control on account of various reasons and more particularly on account of the pandemic of Covid-19.

EXT51800024458Jun 2023 → Dec 2026

Reason as filed by the promoterI, hereby apply for extension as per Order No. 40 Dated 27/12/2022 of the registered project bearing vide no P52100025883. As per HEARING DATED 10th December 2024, Hon'ble Shri Manoj Saunik Sir granted Extension upto 31/12/2026. The order is Other Tab for your reference

Litigation declared30

CaseCourtStatus
CARAP242016/2016HIGH COURTON BOARD
SW/800386/2014/2014MM COURT ANDHERIfor steps
SW/800388/2014/2014MM COURT ANDHERIfor steps
SW/800389/2014/2014MM COURT ANDHERIfor steps
SW/800355/2014/2014MM COURT ANDHERIfor steps
SW/800356/2014/2014MM COURT ANDHERIfor steps
SW/800357/2014/2014MM COURT ANDHERIfor steps
SW/800358/2014/2014MM COURT ANDHERIfor steps
SW/800359/2014/2014MM COURT ANDHERIfor steps
SW/800360/2014/2014MM COURT ANDHERIfor steps
SW/800361/2014/2014MM COURT ANDHERIfor steps
SW/800362/2014/2014MM COURT ANDHERIfor steps
SW/800363/2014/2014MM COURT ANDHERIfor steps
SW/800364/2014/2014MM COURT ANDHERIfor steps
SW/800365/2014/2014MM COURT ANDHERIfor steps
SW/800366/2014/2014MM COURT ANDHERIfor steps
SW/800367/2014/2014MM COURT ANDHERIfor steps
SW/800368/2014/2014MM COURT ANDHERIfor steps
ARBP/928/2016/2016BOMBAY HIGH COURTPENDING
1473/2017State Consumer forumPending
464/2017State Consumer forumPending
465/2017State Consumer forumPending
990/2017State Consumer forumPending
24/2019State Consumer forumPending
25/2019State Consumer forumPending
26/2019State Consumer forumPending
1344/2016NCDRCPending
1693/2016/2016NCDRCDISMISSED BY COURT
1694/2016/2016NCDRCDISMISSED BY THE COURT
1695/2016/2016NCDRCDISMISSED BY THE COURT

Complaints filed with MahaRERA7

Case no.ComplainantRespondentFiled
CC006000000110770Mrs Rajni Seru and Mr Rohit SeruNeeleshwar Developers31/08/2019
CC006000000198824MISS JANET SINGHNEELESHWAR DEVELOPERS27/10/2021
CC006000000220847Subhash BhoirNimesh Patani16/04/2022
CC006000000251633Vinod VermaM/s. NeeleshwarBuilder and Developers29/06/2022
CC006000000303238HEENA M KASHMIRIM/S. NILESHWAR DEVELOPERS05/11/2022
CC12501272Sanjay GosaiNEELESHWAR DEVELOPERS16/04/2025
CC12504322Kapil Kumar KocharNEELESHWAR DEVELOPERS06/12/2025

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 9 Jul 2019
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 9 Jul 2019
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 12 Jul 2019
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 15 Jun 2023Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Dec 2026

Documents filed83

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 83 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Form 1File: Form 1 - Satellite Heights as on Dec 2025.pdf14 May 2026
Form 2File: Form 2 - Satellite Heights as on Dec 2025.pdf14 May 2026
Form 3File: Form 3 - Satellite Heights as on Dec 2025.pdf14 May 2026
Disclosure of Sold and Booked InventoryFile: Circular 29 - Satellite Heights as on Dec 2025.pdf14 May 2026
Form 1File: Form 1 - Satellite Heights as on Sep 2025.pdf7 Jan 2026
Form 2File: Form 2 - Satellite Heights as on Sep 2025.pdf7 Jan 2026
Form 3File: Form 3 - Satellite Heights as on Sep 2025.pdf7 Jan 2026
Disclosure of Sold and Booked InventoryFile: Circular 29 - Satellite Heights as on Sep 2025.pdf7 Jan 2026
Form 1File: Form 1 - Satellite Heights as on June 2025.pdf7 Jan 2026
Form 2File: Form 2 - Satellite Heights as on June 2025.pdf7 Jan 2026
Form 3File: Form 3 - Satellite Heights as on June 2025.pdf7 Jan 2026
Disclosure of Sold and Booked InventoryFile: Circular 29 - Satellite Heights as on June 2025.pdf7 Jan 2026
Form 1File: Form 1 - Satellite Heights as on March 2025.pdf9 Sep 2025
Form 2File: Form 2 - Satellite Heights as on March 2025.pdf9 Sep 2025
Form 3File: Form 3 of Satellite Heights as on 31-03-2025.pdf9 Sep 2025
Disclosure of Sold and Booked InventoryFile: Circular 29 - Satellite Heights as on March 2025.pdf9 Sep 2025
Form 1File: Form 1 - Satellite Heights as on Dec 2024.pdf9 Sep 2025
Form 2File: Form 2 - Satellite Heights as on December 2024.pdf9 Sep 2025
Form 3File: Form 3 of Satellite Heights as on 31-12-24.pdf9 Sep 2025
Disclosure of Sold and Booked InventoryFile: Circular 29 - Satellite Heights as on December 2024.pdf9 Sep 2025
Declaration in FORM BFile: Form B - ₹500.pdf1 Mar 2025
Declaration in FORM BFile: Form B.pdf2 Jan 2025
Disclosure of sold/ booked inventoryFile: MAHARERA EXTENSION FILES.pdf30 Oct 2024
Certificates of CA (Form 3)File: Form 3 Jun 24_11zon (1).pdf29 Oct 2024
Certificates of CA (Form 3)File: Form 3 Sep 24_11zon.pdf29 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Jun 24.pdf29 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Sep 24.pdf29 Oct 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 - June 2024.pdf26 Oct 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 - Sept 2024.pdf26 Oct 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 Dec 23.pdf5 Aug 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 Mar 24.pdf5 Aug 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: organized (20).pdf5 Aug 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: organized (21).pdf5 Aug 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Form 2A 2023-24.pdf5 Aug 2024
Declaration in FORM BFile: Form B Satellite Heights.pdf2 Aug 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: organized (18).pdf2 Aug 2024
Disclosure of sold/ booked inventoryFile: fffffffffffffffffff.pdf2 Aug 2024
Certificates of CA (Form 3)File: Form 3 Mar 24.pdf2 Aug 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Form 5 23-24.pdf2 Aug 2024
CERSAI detailsFile: Declaration of CERSAI.pdf27 Jul 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: Annexure A.pdf27 Jul 2024
Declaration about all RERA Designated Bank Accounts (Format A)File: Format A.pdf27 Jul 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Sept.pdf15 Jan 2024
Disclosure of sold/ booked inventoryFile: Circular 29 Jai Ambe.pdf13 Jan 2024
Certificates of CA (Form 3)File: Form 3 Jai Ambe.pdf13 Jan 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: Form 5 19-20.pdf13 Jan 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: Form 5 20-21.pdf13 Jan 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: Form 5 21-22.pdf13 Jan 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Form 5 22-23.pdf13 Jan 2024
Disclosure of sold/ booked inventoryFile: Circular 29 Jai Ambe .pdf14 Nov 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1.pdf3 Nov 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: Form 2A 19-20.pdf3 Nov 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Form 2A 20-21.pdf3 Nov 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: Form 2A 21-22.pdf3 Nov 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Form 2A 22-23.pdf3 Nov 2023
Declaration about Commencement CertificateFile: Format D.pdf18 Oct 2023
Declaration in FORM BFile: Form B Jai Ambe SRA CHS.pdf18 Oct 2023
Commencement Certificates / NA Order for plotted developmentFile: cc TILL 20 FLOORS.pdf15 Jun 2023
PAN CardFile: Neileshwar PAN CARD.pdf8 Sep 2022
Details of Restarting of Construction work post lockdownFile: Meeting is call by committee of members of association of flat owners dated 19.pdf20 Dec 2021
Details of Restarting of Construction work post lockdownFile: Delay in project 11 dec 2021.pdf12 Dec 2021
Details of Restarting of Construction work post lockdownFile: Delay in project 11 dec 2021.pdf12 Dec 2021
Details of Restarting of Construction work post lockdownFile: Delay in project 11 dec 2021.pdf12 Dec 2021
Details of Restarting of Construction work post lockdownFile: resolution in Renninance club Nov 2019.pdf19 Nov 2021
Commencement Certificates / NA Order for plotted developmentFile: NEW CC TILL 16TH FLOOR.pdf18 Oct 2021
Details of Restarting of Construction work post lockdownFile: update project letter.pdf18 Oct 2021
Details of Restarting of Construction work post lockdownFile: update project letter.pdf18 Oct 2021
Status of ConveyanceFile: new prop cards .pdf18 Oct 2021
OtherFile: withdrawl of stop work notice by SRA.pdf18 Oct 2021
OtherFile: Letter to RERA 15 july 2019.pdf16 Jul 2019
Building plan approvalFile: Plan im PDF for RERA.pdf12 Jul 2019
Building Plan Approval (IOD)File: Plan im PDF for RERA.pdf12 Jul 2019
Proforma of Allotment letterFile: ALLOTMENT LETTER DRAFT COPY .pdf12 Jul 2019
Proforma of Allotment letterFile: Format of Agreement for Sale_compressed.pdf12 Jul 2019
Layout approvalFile: SCAN 1.pdf9 Jul 2019
PAN CardFile: Nileshwar PAN Card.pdf9 Jul 2019
Copy of the legal title reportFile: Legal Title Report.pdf9 Jul 2019
Details of encumbrancesFile: LETTER OF ECUBRANCES.pdf9 Jul 2019
Copy of Layout Approval (in case of layout)File: SCAN 1.pdf9 Jul 2019
Commencement Certificates / NA Order for plotted developmentFile: Commencement Certificate.pdf9 Jul 2019

How this compares with Mumbai Suburban

82%of this project is bookeddistrict median 30%
33%of Mumbai Suburban projects moved their completion datethis one moved by 42 months
21%of Mumbai Suburban registrations have lapsed or been cancelledthis one is on the register

Computed across the 6,700+ Mumbai Suburban projects on ReraGenie, from their own filings.

Free monthly report: Mumbai on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep SATELLITE HEIGHTS on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near JOGESHWARI WEST6,700+ in Mumbai Suburban

2 kmSATELLITE HEIGHTSCompleted 115Lapsed / revoked 64Abeyance 1Other 118Dot size: filed unitsN

Filed coordinates, straight-line distance. 298 registered projects within 2 km.

Builder: NEELESHWAR DEVELOPERS

NEELESHWAR DEVELOPERS has 1 registration on MahaRERA, including SATELLITE HEIGHTS. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Mumbai Suburban district page.

Frequently asked questions

What are my rights if SATELLITE HEIGHTS is delayed beyond 31 Dec 2026?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of SATELLITE HEIGHTS?

The registered promoter entity is NEELESHWAR DEVELOPERS, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in SATELLITE HEIGHTS?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How do I read the complaint cases filed against SATELLITE HEIGHTS?

Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.

How current is the construction progress shown for SATELLITE HEIGHTS?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at SATELLITE HEIGHTS?

The professionals named in the filing: Architect: VIVEK BHOLE; Engineer: BHAVESH PARMAR; Chartered Accountant: SANJAY SHAH; Chartered Accountant: VIPUL GHARPURE. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in SATELLITE HEIGHTS?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About SATELLITE HEIGHTS. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save SATELLITE HEIGHTS to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.