ReraGenieLog inGet a buyer report

Home / Browse projects / Pune, Maharashtra / SANKALP SIERRA

Registered No litigation declared Residential / Group Housing project

SANKALP SIERRA

By SANKALP PROPERTIES

RG-MH-23708 · RERA P52100079020 · Last updated on MahaRERA portal: 28 Apr 2026

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form

Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against the promoter's 1 other registration and every project registered within 2 km.

See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.
Dec 2028Possession promisedno revision filed
1 of 22Construction stages doneacross 2 buildings; furthest along: Excavation, 80%
186 of 301Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 103 documents Report an error

SANKALP SIERRA is a Residential / Group Housing project by SANKALP PROPERTIES in Pune, Maharashtra, registered with MahaRERA as P52100079020 on 31 Jan 2025. Possession is promised by 31 Dec 2028. 115 of the 301 units on this registration are recorded sold or booked, and 1 of 22 construction stages are filed complete.

At a glance

Project

  • NameSANKALP SIERRA
  • TypeResidential / Group Housing
  • Location
    • NEAR GHOKHALE MALA
    • PUNE ALANDI BRT ROAD
    • WADMUKHWADI
    • Haveli
    • Pune
    • 412105
  • Pincode412105
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P52100079020
  • ReraGenie IDRG-MH-23708

Builder

  • NameSANKALP PROPERTIES
  • Entity typePartnership
  • PartnersNILESH KANTIBHAI PATEL, PRAVIN RATILAL PATEL, NARESHKUMAR RAVJIBHAI PATEL, RAHUL JAYANTIBHAI PATEL, BHUPENDRAKUMAR JAYANTIBHAI PATEL
  • Authorised Signatory PartnerTARUNKUMAR ARVINDBHAI PATEL
  • Other registrations1 more →
  • Completed1 of 2

Key dates

this monthRegisteredJan 2025PromisedDec 2028

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on31 Jan 2025
  • Promised completion31 Dec 2028
  • Revised completionNone
  • Buildings2 building records
  • Documents filed103 files

Current status

38%115 of 301 units booked
5.2%Work done, per cost certificate

Figures as on 28 Apr 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
WING ANA292716736203
WING BNA222098098

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building2

As on 28 Apr 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

1 of 22 construction stages are filed complete across 2 buildings. The stage furthest along is Excavation, at 80%.

WING A8%
ActivityProgress
Excavation80%
Basement (if any)10%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
WING B14%
ActivityProgress
Excavation100%
Basement (if any)50%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 28 Apr 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes0%
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes0%
Street LightingYes0%
Community BuildingsYes0%
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalYes0%
Water conservation /Rain water harvestingYes0%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceYes0%
Open ParkingNoNot applicable

Parking filed604

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots604
Closed/Covered604
BuildingClosed/CoveredTotal
WING A417417
WING B187187

Land and ownership

Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area4,819 sq m
Land owned byThe promoter
Named landownersNone
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on16 Jul 2025

Approvals and building plan

Sanctioning authorityPimpri Chinchwad Municipal Corporation
Permissible FSI32215.27
Proposed, not sanctioned32,215 sq m
Buildings approved2
Buildings sanctioned2

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchICICI Bank Ltd., Shop No. 7, Silvana County, S. No. 133/1, Alandi Road, Alandi, Pune, Maharashtra.412105
Estimated costRs 144.90 cr
Cost incurredRs 7.50 cr
Work done5.18%
BuildingWingEstimatedIncurred
WING ANARs 73.02 crRs 3.65 cr
WING BNARs 69.33 crRs 3.47 cr
-NARs 2.55 crRs 38.24 lakh

Certifying professionals and partners6

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectMANIK BUCHUDE
EngineerGAURAV D PATEL
EngineerSARVASIDDHANT STRUCTURAL ENGINEERS PVT LTD
EngineerPrashant Chorghade
Chartered AccountantUJJAM PATEL & ASSOCIATES
Chartered Accountants v s v and associates s v s v and associates
PartnerRole in project
SANKALP PROPERTIES-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 19 Dec 2024
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 28 Apr 2026
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 28 Apr 2026
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 12 May 2025Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Dec 2028

Documents filed103

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 103 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Layout approvalFile: 1-13 LayouT DATE 31-03-2026.pdf28 Apr 2026
Layout approvalFile: 1-13 Layout With Highlighted Plan.pdf28 Apr 2026
Building plan approvalFile: 2-13 A B Wing Parking Plan DATE 31-03-2026_11zon.pdf28 Apr 2026
Building plan approvalFile: 3-13 A B 1st Floor Plan DATE 31-03-2026.pdf28 Apr 2026
Building plan approvalFile: 4-13 A B 2nd Floor Plan DATE 31-03-2026.pdf28 Apr 2026
Building plan approvalFile: 5-13 A 7th Floor Plan DATE 31-03-2026.pdf28 Apr 2026
Building plan approvalFile: 6-13 A Floor Plan DATE 31-03-2026.pdf28 Apr 2026
Building plan approvalFile: 7-13 A Elevation DATE 31-03-2026.pdf28 Apr 2026
Building plan approvalFile: 8-13 B Floor Plan DATE 31-03-2026.pdf28 Apr 2026
Building plan approvalFile: 9-13 B Floor Plan DATE 31-03-2026.pdf28 Apr 2026
Building plan approvalFile: 10-13 B Floor Plan DATE 31-03-2026.pdf28 Apr 2026
Building plan approvalFile: 11-13 B Floor Plan DATE 31-03-2026.pdf28 Apr 2026
Building plan approvalFile: 12-13 B Floor Plan DATE 31-03-2026.pdf28 Apr 2026
Building plan approvalFile: 13-13 B Elevation DATE 31-03-2026.pdf28 Apr 2026
Form 2A (FY 2025-2026)File: Form 2A.pdf25 Apr 2026
Form 2A (FY 2024-2025)File: Form 2A.pdf25 Apr 2026
Form 2A (FY 2026-2027)File: Form 2A 27.pdf25 Apr 2026
Withdrawal Update Form 1File: SANKALP PROPERTIES FORM 1.PDF11 Apr 2026
Withdrawal Update Form 2File: SANKALP PROPERTIES FORM 2.PDF11 Apr 2026
Withdrawal Update Form 3File: FROM 3 Ujjam Patel and Associates Chartered Accountant SANKALP PROPERTIES.PDF11 Apr 2026
Withdrawal Update Form 1File: FORM 1 Kimaya Associates Architect Certificate SANKALP PROPERTIES.PDF18 Jan 2026
Withdrawal Update Form 2File: FROM 2 SARVASIDDANT STRUCTURAL ENGINEER.PDF18 Jan 2026
Withdrawal Update Form 3File: FROM 3 Ujjam Patel and Associates Chartered Accountant SANKALP PROPERTIES.PDF18 Jan 2026
Withdrawal Update Form 1File: FORM 1 Kimaya Associates Architect Certificate SANKALP PROPERTIES.PDF31 Oct 2025
Withdrawal Update Form 2File: FROM 2 SARVASIDDANT STRUCTURAL ENGINEER.PDF31 Oct 2025
Withdrawal Update Form 3File: FROM 3 Ujjam Patel and Associates Chartered Accountant SANKALP PROPERTIES.PDF31 Oct 2025
Form 5 (FY 2024-2025)File: SANKALP PRPERTIES ANNUAL REPORT SOA CA CERTIFICATE 17-09-2025.PDF11 Oct 2025
Withdrawal Update Form 1File: FORM 1 Kimaya Associates Architect Certificate SANKALP PROPERTIES.PDF5 Aug 2025
Withdrawal Update Form 1File: FORM 1 Kimaya Associates Architect Certificate SANKALP PROPERTIES.PDF5 Aug 2025
Withdrawal Update Form 2File: FROM 2 SARVASIDDANT STRUCTURAL ENGINEER.PDF5 Aug 2025
Withdrawal Update Form 2File: FROM 2 SARVASIDDANT STRUCTURAL ENGINEER.PDF5 Aug 2025
Withdrawal Update Form 3File: FORM-3 CA UJJAM PATEL AND ASSOCIATES.pdf5 Aug 2025
Withdrawal Update Form 3File: FROM 3 Ujjam Patel and Associates Chartered Accountant SANKALP PROPERTIES.pdf5 Aug 2025
Layout approvalFile: 1 Revised Sanction Plan Sanklp Sierra.pdf12 May 2025
Building plan approvalFile: 2 Revised Sanction Plan Sanklp Sierra.pdf12 May 2025
Building plan approvalFile: 3 Revised Sanction Plan Sanklp Sierra.pdf12 May 2025
Building plan approvalFile: 4 Revised Sanction Plan Sanklp Sierra.pdf12 May 2025
Building plan approvalFile: 4 Revised Sanction Plan Sanklp Sierra.pdf12 May 2025
Building plan approvalFile: 5 Revised Sanction Plan Sanklp Sierra.pdf12 May 2025
Building plan approvalFile: 6 Revised Sanction Plan Sanklp Sierra.pdf12 May 2025
Building plan approvalFile: 7 Revised Sanction Plan Sanklp Sierra.pdf12 May 2025
Building plan approvalFile: 6 Revised Sanction Plan Sanklp Sierra.pdf12 May 2025
Building plan approvalFile: 9 Revised Sanction Plan Sanklp Sierra.pdf12 May 2025
Building plan approvalFile: 10 Revised Sanction Plan Sanklp Sierra.pdf12 May 2025
Building plan approvalFile: 11 Revised Sanction Plan Sanklp Sierra.pdf12 May 2025
Building plan approvalFile: 12 Revised Sanction Plan Sanklp Sierra.pdf12 May 2025
Copy of Layout Approval (in case of layout)File: 1 Revised Sanction Plan Sanklp Sierra.pdf12 May 2025
Commencement Certificates / NA Order for plotted developmentFile: 0 Commencement Certificate Sierra.pdf12 May 2025
Building Plan Approval / NA Order for plotted developmentFile: 2 Revised Sanction Plan Sanklp Sierra.pdf12 May 2025
Building Plan Approval / NA Order for plotted developmentFile: 3 Revised Sanction Plan Sanklp Sierra.pdf12 May 2025
Building Plan Approval / NA Order for plotted developmentFile: 4 Revised Sanction Plan Sanklp Sierra.pdf12 May 2025
Building Plan Approval / NA Order for plotted developmentFile: 4 Revised Sanction Plan Sanklp Sierra.pdf12 May 2025
Building Plan Approval / NA Order for plotted developmentFile: 5 Revised Sanction Plan Sanklp Sierra.pdf12 May 2025
Building Plan Approval / NA Order for plotted developmentFile: 6 Revised Sanction Plan Sanklp Sierra.pdf12 May 2025
Building Plan Approval / NA Order for plotted developmentFile: 7 Revised Sanction Plan Sanklp Sierra.pdf12 May 2025
Building Plan Approval / NA Order for plotted developmentFile: 6 Revised Sanction Plan Sanklp Sierra.pdf12 May 2025
Building Plan Approval / NA Order for plotted developmentFile: 9 Revised Sanction Plan Sanklp Sierra.pdf12 May 2025
Building Plan Approval / NA Order for plotted developmentFile: 10 Revised Sanction Plan Sanklp Sierra.pdf12 May 2025
Building Plan Approval / NA Order for plotted developmentFile: 11 Revised Sanction Plan Sanklp Sierra.pdf12 May 2025
Building Plan Approval / NA Order for plotted developmentFile: 12 Revised Sanction Plan Sanklp Sierra.pdf12 May 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 Kimaya Associates Architect Certificate.PDF21 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3.pdf21 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 sankalp properties_16042025113825.PDF21 Apr 2025
Other - LegalFile: SALE DEED-SANKALP PROPERTIES 143-1.pdf26 Dec 2024
Other - LegalFile: SALE DEED-SANKALP PROPERTIES S NO 144.pdf26 Dec 2024
Other - TechnicalFile: ORDER NO 50.pdf26 Dec 2024
Proforma of Agreement for saleFile: RERA DRAFT 26-12-2024.pdf26 Dec 2024
Details of encumbrances concerned to FinanceFile: Enc Finance Scan_0001.pdf24 Dec 2024
Details of encumbrances concerned to FinanceFile: Enc Legal Scan_0002.pdf24 Dec 2024
Proforma of Allotment letterFile: Allotment Letter Scan_0001.pdf24 Dec 2024
Declaration in FORM BFile: Form B Sankalp Properties Rera.pdf24 Dec 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM- 1 KIMAYA ASSOCIATES.pdf24 Dec 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM-3 CA UJJAM PATEL AND ASSOCIATES.pdf24 Dec 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Enginner Certificate.pdf24 Dec 2024
Declaration about Commencement CertificateFile: C C Declaration Scan_0001.pdf24 Dec 2024
CERSAI detailsFile: Cersai Report Scan_0001.pdf24 Dec 2024
Declaration about all RERA Designated Bank Accounts (Format A)File: Format A Scan_0001.pdf24 Dec 2024
Deviation Report with respect to Allotment letterFile: Dev AL Scan_0001.pdf24 Dec 2024
Details of encumbrances concerned to LegalFile: Enc Finance Scan_0001.pdf24 Dec 2024
Details of encumbrances concerned to LegalFile: Enc Legal Scan_0002.pdf24 Dec 2024

How this compares with Pune

38%of this project is bookeddistrict median 31%
26%of Pune projects moved their completion datethis one has not
26%of Pune registrations have lapsed or been cancelledthis one is on the register

Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.

Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep SANKALP SIERRA on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near WADMUKHWADI13,700+ in Pune

2 kmSANKALP SIERRACompleted 38Lapsed / revoked 16Other 73Dot size: filed unitsN

Filed coordinates, straight-line distance. 127 registered projects within 2 km.

Builder: SANKALP PROPERTIES

SANKALP PROPERTIES has 2 registrations on MahaRERA, including SANKALP PEARL and SANKALP SIERRA. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Pune district page.

Frequently asked questions

What are my rights if SANKALP SIERRA is delayed beyond 31 Dec 2028?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of SANKALP SIERRA?

The registered promoter entity is SANKALP PROPERTIES, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in SANKALP SIERRA?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for SANKALP SIERRA?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at SANKALP SIERRA?

The professionals named in the filing: Architect: MANIK BUCHUDE; Engineer: GAURAV D PATEL; Engineer: SARVASIDDHANT STRUCTURAL ENGINEERS PVT LTD; Engineer: Prashant Chorghade; Chartered Accountant: UJJAM PATEL & ASSOCIATES; Chartered Accountant: s v s v and associates s v s v and associates. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in SANKALP SIERRA?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About SANKALP SIERRA. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save SANKALP SIERRA to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.