Home / Browse projects / Mumbai Suburban, Maharashtra / SANKALP HEIGHTS 1-22

Registered No litigation declared Residential / Group Housing project

SANKALP HEIGHTS 1-22

By STATUS CONSTRUCTION PVT LTD

RG-MH-11549 · RERA P51800002085 · Last updated on MahaRERA portal: 27 May 2026

Source: official MahaRERA filing

Red flags

  • 2 complaints at MahaRERA
  • Completion date moved by 54 months
  • 2 extensions taken

Clear

  • No litigation declared
  • Separate project account declared
  • Allotment letter follows the model form

3 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Mumbai Suburban registration emailed to you, free during the pilot beta.
Dec 2027Possession promisedmoved 54 months from the original
16 of 22Construction stages doneacross 2 buildings; furthest along: Internal walls, 50%
2Complaints at MahaRERAon this registration
Jump to the 124 documents Report an error

SANKALP HEIGHTS 1-22 is a Residential / Group Housing project by STATUS CONSTRUCTION PVT LTD in Mumbai Suburban, Maharashtra, registered with MahaRERA as P51800002085 on 31 Jul 2017. Possession is promised by 31 Dec 2027. The completion date has moved by 54 months from the original filing. 2 complaints are on record with the regulator.

At a glance

Project

  • NameSANKALP HEIGHTS 1-22
  • TypeResidential / Group Housing
  • Location
    • Jankalyan Nagar
    • Malad (W)
    • Borivali
    • Mumbai Suburban
    • 400095
  • Pincode400095
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51800002085
  • ReraGenie IDRG-MH-11549

Builder

  • NameSTATUS CONSTRUCTION PVT LTD
  • Entity typeCompany
  • DirectorMUKESH MOTILAL GARG

Key dates

this monthRegisteredJul 2017First promiseJun 2023Revised toDec 2027

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on31 Jul 2017
  • Promised completion31 Dec 2027
  • Revised completionRevised to 31 Dec 2027 (originally 30 Jun 2023)
  • Buildings2 building records
  • Documents filed124 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
PART A 1-10NA110000
PART B 11-22NA130000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building2

As on 27 May 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

16 of 22 construction stages are filed complete across 2 buildings. The stage furthest along is Internal walls, at 50%.

PART A 1-1091%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
PART B 11-2266%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises50%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.25%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.50%

Progress on shared amenities15

As on 27 May 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes100%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsYes50%
Landscaping & Tree PlantingNoNot applicable
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes100%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes100%
Electrical meter room, sub-station, receiving stationYes100%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Parking filed200

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots200
Closed/Covered200
BuildingClosed/CoveredTotal
PART A 1-10100100
PART B 11-22100100

Land and ownership

MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area1,950 sq m
Land owned byThe promoter
Named landownersNone

Approvals and building plan

Permissible FSI5792.9
Proposed, not sanctioned5,261 sq m
Buildings approved2
Buildings sanctioned2

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchHDFC BANK LTD, 30, NAVYUG SOCIETY, KRISHNA KUNJ, VL MEHTA ROAD, OPP SUNFLOWER HOSPITAL, JVPD SCHEME,

Certifying professionals and partners1

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectV V & ASSOCIATES
PartnerRole in project
STATUS CONSTRUCTION PVT LTD-

Extensions applied for2

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EXT51800009399Jun 2023 → Jun 2024

Reason as filed by the promoterThe Project has been delayed on account of various reasons beyond our control and more particularly due to Lockdown announced on account of pandemic of Covid-19. Due to this unprecedented crises, we have witnessed the reverse migration of labourers and shortage of liquidity in the market. Moreover various private and Government offices have not been working at full strength and the complete supply chain has broken down. It appears that it is going to take a lot of time to normalize the real estate industry.

EXT51800017094Jun 2023 → Dec 2027

Reason as filed by the promotern accordance with circular no 28, we hereby apply for extension of our project u/s 7(3) in Format B. The project was delayed for reasons beyond our control on account of various reasons and more particularly on account of the pandemic of Covid-19. We have consent of 57.14% allottees for purpose of extension of RERA registration period of the said project.

Litigation declared1

CaseCourtStatus
NA/2003NO LITIGATIONNO LITIGATION

Complaints filed with MahaRERA2

Case no.ComplainantRespondentFiled
CC006000000220886Pooja Kumar Mrinal ChandStatus Constructions Pvt. Ltd.19/04/2022
CC006000000194164Mrs Zia alex Andrade & orsSankalp Construction Pvt Ltd24/09/2020

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 26 Jul 2017
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 26 Jul 2017
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 6 Jun 2023
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 6 Jun 2023Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateOn the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    uploaded 14 Jan 2022

Documents filed124

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 124 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Form 1File: Rera Form 1 Mar 26.pdf27 May 2026
Form 2File: Rera Form 2 Mar 26.pdf27 May 2026
Form 3File: form 3- Mar 26.pdf27 May 2026
Disclosure of Sold and Booked InventoryFile: Mar 26.pdf27 May 2026
Form 1File: Rera Form 1 Q3.pdf3 Feb 2026
Form 2File: Rera Form 2 Q3.pdf3 Feb 2026
Form 3File: Rera Form 3 Q3.pdf3 Feb 2026
Disclosure of Sold and Booked InventoryFile: Dec 25.pdf3 Feb 2026
Form 1File: Rera Form 1 Q2.pdf27 Nov 2025
Form 2File: Rera Form 2 Q2.pdf27 Nov 2025
Form 3File: Rera Form 3 Q2.pdf27 Nov 2025
Disclosure of Sold and Booked InventoryFile: Sep 25.pdf27 Nov 2025
Form 1File: Rera Form 1 June 25.pdf6 Aug 2025
Form 2File: Form 2 June 25.pdf6 Aug 2025
Form 3File: form 3- June 25.pdf6 Aug 2025
Disclosure of Sold and Booked InventoryFile: June 25.pdf6 Aug 2025
PAN CardFile: SCPL pan card.pdf1 May 2025
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 as on Q4.pdf1 May 2025
Certificates of CA (Form 3)File: Rera Form 3 as on Q4.pdf1 May 2025
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 as on Q4.pdf1 May 2025
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Rera Form 1.pdf25 Jan 2025
Certificates of CA (Form 3)File: Rera Form 3.pdf25 Jan 2025
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Rera Form 2.pdf25 Jan 2025
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Rera Certificate Form 1.pdf23 Oct 2024
Certificates of CA (Form 3)File: Form 3.pdf23 Oct 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: STATUS RERA - FORM 2 AS ON 30 SEPT 2024.pdf23 Oct 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Form5 FY 23-24.pdf9 Aug 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 Architect Certificate as on Q4.pdf16 Jul 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: FORM 2 Engineer Certificate as on Q1.pdf16 Jul 2024
Certificates of CA (Form 3)File: Form 3 CA Certificate aQ1.pdf16 Jul 2024
Home Buyer /Allottee Grievance Redressal CellFile: Declartion of Allottee Grievance Redressal Cell.pdf16 Jul 2024
Details of encumbrances concerned to FinanceFile: Declaration_Sankalp.pdf21 Jun 2024
Details of encumbrances concerned to LegalFile: Declaration_Sankalp.pdf21 Jun 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1.pdf23 Apr 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2.pdf23 Apr 2024
Certificates of CA (Form 3)File: Form-3 Status Construction.pdf23 Apr 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 Architect Certificate as on Dec 23.pdf13 Jan 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 Engineer Certificate as on Dec 23.pdf13 Jan 2024
Certificates of CA (Form 3)File: Form 3 CA Certificate as on Dec 23.pdf13 Jan 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1.pdf18 Oct 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2.pdf18 Oct 2023
Certificates of CA (Form 3)File: Form 3.pdf18 Oct 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: RERA CERT FORM 2A FOR YEAR 2022-23.pdf12 Jul 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1_compressed.pdf10 Jul 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2.pdf10 Jul 2023
Certificates of CA (Form 3)File: Form 3.pdf10 Jul 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Form 5 as on 2022-23.pdf10 Jul 2023
Details of encumbrances concerned to FinanceFile: No ENCUMBRANCE LETTER Litigations.pdf12 Jun 2023
Details of encumbrances concerned to LegalFile: No ENCUMBRANCE LETTER Litigations.pdf12 Jun 2023
Declaration about Commencement CertificateFile: Format D.pdf12 Jun 2023
Declaration in FORM BFile: FORM -B (Promoter) SANKALP HEIGHTS 1-22.pdf12 Jun 2023
Disclosure of sold/ booked inventoryFile: CIRCULAR 29 Disclosure of Sold and Booked invetory.pdf12 Jun 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: Form 5 FY 2021-22 duly signed by promoter.pdf12 Jun 2023
Certificates of CA (Form 3)File: Form 3 Combine Part A and B.pdf9 Jun 2023
Certificates of CA (Form 3)File: Form3 Part B to be revised_compressed.pdf8 Jun 2023
Building plan approvalFile: Latest Layout_compressed (1).pdf6 Jun 2023
Building Plan Approval (IOD)File: Latest Layout_compressed (1).pdf6 Jun 2023
Commencement Certificates / NA Order for plotted developmentFile: 2375422_FurtherCC_signed.pdf6 Jun 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 as on December 2021.pdf11 May 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 as on March 2022.pdf11 May 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 as on June 2022.pdf11 May 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 as on September 2022.pdf11 May 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 as on December 2022.pdf11 May 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 as on March 2023.pdf11 May 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: FORM 2 - 31 DEC 2021.pdf11 May 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: FORM 2 - 31 MARCH 2022.pdf11 May 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: FORM 2 - 30 JUNE 2022.pdf11 May 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: FORM 2 - 30 SEPT 2022.pdf11 May 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: FORM 2 - 31 DEC 2022.pdf11 May 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: FORM 2 - 31 MARCH 2023.pdf11 May 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: RERA CERT FORM 2A FOR YEAR 2021-22.pdf11 May 2023
Certificates of CA (Form 3)File: Form 3- as on December 2021_compressed.pdf11 May 2023
Certificates of CA (Form 3)File: Form 3- as on March 2022_compressed.pdf11 May 2023
Certificates of CA (Form 3)File: Form 3- as on June 2022_compressed.pdf11 May 2023
Certificates of CA (Form 3)File: Form 3- as on September 2022_compressed.pdf11 May 2023
Certificates of CA (Form 3)File: Form 3- as on December 2022_compressed.pdf11 May 2023
Certificates of CA (Form 3)File: Form 3- as on March 2023_compressed.pdf11 May 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)File: Form 5 FY 2018-19.pdf25 Apr 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: Form 5 FY 2019-20.pdf25 Apr 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: Form 5 FY 2020-21.pdf25 Apr 2023

How this compares with Mumbai Suburban

33%of Mumbai Suburban projects moved their completion datethis one moved by 54 months
21%of Mumbai Suburban registrations have lapsed or been cancelledthis one is on the register

Computed across the 6,700+ Mumbai Suburban projects on ReraGenie, from their own filings.

Free monthly report: Mumbai on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep SANKALP HEIGHTS 1-22 on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Malad (W)6,700+ in Mumbai Suburban

2 kmSANKALP HEIGHTS 1-22Completed 32Lapsed / revoked 19Other 48Dot size: filed unitsN

Filed coordinates, straight-line distance. 99 registered projects within 2 km.

Builder: STATUS CONSTRUCTION PVT LTD

STATUS CONSTRUCTION PVT LTD has 1 registration on MahaRERA, including SANKALP HEIGHTS 1-22. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Mumbai Suburban district page.

Frequently asked questions

What are my rights if SANKALP HEIGHTS 1-22 is delayed beyond 31 Dec 2027?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of SANKALP HEIGHTS 1-22?

The registered promoter entity is STATUS CONSTRUCTION PVT LTD, a company as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in SANKALP HEIGHTS 1-22?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How do I read the complaint cases filed against SANKALP HEIGHTS 1-22?

Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.

How current is the construction progress shown for SANKALP HEIGHTS 1-22?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at SANKALP HEIGHTS 1-22?

The professionals named in the filing: Architect: V V & ASSOCIATES. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in SANKALP HEIGHTS 1-22?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About SANKALP HEIGHTS 1-22. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save SANKALP HEIGHTS 1-22 to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.