Home / Browse projects / Bengaluru Rural, Karnataka / Sanjeevini Aarna
Sanjeevini Aarna
RG-KA-67406 · RERA PRM/KA/RERA/1250/304/PR/170524/006887 · Last updated on RERA Karnataka portal: 14 Oct 2026
Source: official RERA Karnataka filing
Red flags
- No red flags in this filing
Clear
- No litigation declared
- No complaints on record
- Completion date never moved
- Separate project account declared
Saved.
Sanjeevini Aarna is a Residential/Group Housing project by Sanjeevini Projects in Bengaluru Rural, Karnataka, registered with RERA Karnataka as PRM/KA/RERA/1250/304/PR/170524/006887 on 17 May 2024. Possession is promised by 30 Sep 2027. 207 of the 224 units on this registration are recorded sold or booked, and 8 of 18 construction stages are filed complete.
At a glance
Project
- NameSanjeevini Aarna
- TypeResidential/Group Housing
- Location
- Hosakote
- Bengaluru Rural
- PincodeNot stated
- RERA no.PRM/KA/RERA/1250/304/PR/170524/006887
- ReraGenie IDRG-KA-67406
Key dates
Key facts
Registration and timeline
- StatusRegistration approved
- Registered on17 May 2024
- Promised completion30 Sep 2027
- Revised completionNone
- Buildings2 building records
- Documents filed151 files
Current status
Figures as on 14 Oct 2026, this project's latest RERA Karnataka filing.
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| Block A | - | - | - | 98 | 0 | 98 |
| Block B | - | - | - | 126 | 0 | 126 |
The full filing
Everything below is from the project's own RERA Karnataka filing, free to read.
Construction progress by building1
As on 14 Oct 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
8 of 18 construction stages are filed complete. The stage furthest along is Railing and Grill fixing, at 90%.
Building: 78% average across the applicable activities
| Activity | Progress |
|---|---|
| Earth work and other leveling preparation work | 100% |
| Foundation footing work | 100% |
| Upto Plinth Level | 100% |
| Sub-structure flooring (Parking Floor, more than one floor below general ground level) | 100% |
| Retaining wall (All types) | 100% |
| RCC or MS Framed structure | 100% |
| Masonry Construction | 100% |
| Plastering inside , outside & Ceiling | 60% |
| Joinery: Doors, Windows, Ventilators etc | 50% |
| Basic work of Water supply, Sanitary and Electrification | 65% |
| Dadoing, Skirting, Flooring, Tiles work (All types) | 50% |
| Railing and Grill fixing | 90% |
| Electrification, Water supply and Sanitary Finishing | 65% |
| Painting | 50% |
| Fire prevention and fire fighting fitting and fixture with network | 0% |
| Weather Proof work(tile,concrete) | 100% |
| Wardrobe, Showcase, Kitchen cabinet, Puja work | Not applicable |
| Elevation work | 90% |
| Internal and External work including landscapes as per sanctioned drawings | 90% |
Progress on shared amenities40
As on 14 Oct 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Water Supply | Yes | 65% |
| Sewage and Drainage System | Yes | 50% |
| Water conservation/rain water harvesting/recharge of ground water | Yes | 20% |
| Energy management | Yes | 0% |
| Fire protection and fire safety requirements | Yes | 0% |
| Solid waste management and disposal | Yes | 15% |
| Emergency Evacuation services | Yes | 0% |
| Internal Roads & Footpaths | Yes | 0% |
| Electricity supply transformer and substation | Yes | 60% |
| Storm water drains | Yes | 20% |
| Use of renewable energy | Yes | 0% |
| Sewage Treatment Plant (STP) | Yes | 50% |
| Parks & Tree planting | Yes | 20% |
| Street Lighting | Yes | 10% |
| Electricity | Yes | 60% |
| Smart Home Automation | No | Not applicable |
| CCTV Surveillance | Yes | 75% |
| Club House | Yes | 0% |
| Community Hall | Yes | 75% |
| Outdoor Sports facility | Yes | 65% |
| Indoor Sports facility | Yes | 65% |
| Swimming Pool | Yes | 65% |
| Gym | Yes | 65% |
| Parks | Yes | 20% |
| Power Backup | Yes | 60% |
| Piped Gas | Yes | 0% |
| Water and Sanitation | Yes | 65% |
| Air Conditioning | No | Not applicable |
| Staircases | Yes | 50% |
| Lifts | Yes | 50% |
| Corridor/Lobbies | Yes | 50% |
| Fire escapes | Yes | 35% |
| Common entrance and exit for the building/common portico/foyer/verandah | Yes | 90% |
| Basement | Yes | 100% |
| Terrace | Yes | 70% |
| Outer Wall | Yes | 60% |
| Open parking areas | No | Not applicable |
| Provision for lodging of management staff and security staff | Yes | 0% |
| Water conservation and renewable energy | Yes | 35% |
| Common storage spaces | Yes | 0% |
Land and ownership2
This page carries no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.
| Landowner | Village | District |
|---|---|---|
| Umesh Gowda H A | - | - |
| Suresh H A | - | - |
Project account and cost
70 percent of buyer money must sit in the project account, so check that your agreement for sale names a designated account for this project and pay into that account only.
| Cost line | Estimated | Incurred |
|---|---|---|
| Estimated Cost of Construction as certified by Engineer | Rs 103.02 cr | Rs 75.22 cr |
| On-site expenditure-Site Overhead | Rs 15.46 cr | Rs 10.77 cr |
| Payment of taxes | Rs 15.31 cr | Rs 8.98 cr |
| Principal sum and interest payable to financial institutions-Scheduled Banks | Rs 3.50 cr | Rs 6.37 cr |
| On-site expenditure-Consultants Fees | Rs 1.00 cr | Rs 65.00 lakh |
Certifying professionals and partners3
Certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | FWD Architects |
| Engineer | Cratis Designers Private limited |
| Chartered Accountant | Nirmala Sreenivasulu |
Complaints filed with RERA Karnataka
No complaints on record against this registration.
Documents filed151
As listed on the registration, under the names the promoter filed them with; the newest 80 of 151 are shown. The files themselves are available at source: search the registration number PRM/KA/RERA/1250/304/PR/170524/006887 on the RERA Karnataka portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Q2 2026-27 Form-4 Certificate issued by Chartered AccountantFile: Form 4 Aarna Q2_compressed.pdf | 14 Oct 2026 |
| Q2 2026-27 Form-5 Certificate issued by ArchitectFile: form-5_Archi.pdf | 14 Oct 2026 |
| Q2 2026-27 Form-6 Certificate issued by Structural EngineerFile: Form - 6, Engineer.pdf | 14 Oct 2026 |
| Q2 2026-27 Water supply and sewage board | 14 Oct 2026 |
| Q2 2026-27 KSPCB- PCB (10 Acres to 125 Acres) | 14 Oct 2026 |
| Q2 2026-27 KPTCL- BESCOM | 14 Oct 2026 |
| Q2 2026-27 Fire and Safety | 14 Oct 2026 |
| Q2 2026-27 Airport Authority of India | 14 Oct 2026 |
| Q1 2026-27 Form-4 Certificate issued by Chartered AccountantFile: Form 4 Sanjeevini Aarna_compressed.pdf | 11 Jul 2026 |
| Q1 2026-27 Form-5 Certificate issued by ArchitectFile: form-5_Architecture.pdf | 11 Jul 2026 |
| Q1 2026-27 Form-6 Certificate issued by Structural EngineerFile: Form - 6, Engineer.pdf | 11 Jul 2026 |
| Q1 2026-27 Water supply and sewage board | 11 Jul 2026 |
| Q1 2026-27 KSPCB- PCB (10 Acres to 125 Acres) | 11 Jul 2026 |
| Q1 2026-27 KPTCL- BESCOM | 11 Jul 2026 |
| Q1 2026-27 Fire and Safety | 11 Jul 2026 |
| Q1 2026-27 Airport Authority of India | 11 Jul 2026 |
| Q4 2025-26 Form-4 Certificate issued by Chartered AccountantFile: Form 4 Sanjeevini Aarna_compressed.pdf | 14 Apr 2026 |
| Q4 2025-26 Form-5 Certificate issued by ArchitectFile: form-5_Architecture Certificate_ Q4_07APR2026.pdf | 14 Apr 2026 |
| Q4 2025-26 Form-6 Certificate issued by Structural EngineerFile: Form - 6.pdf | 14 Apr 2026 |
| Q4 2025-26 Water supply and sewage board | 14 Apr 2026 |
| Q4 2025-26 KSPCB- PCB (10 Acres to 125 Acres) | 14 Apr 2026 |
| Q4 2025-26 KPTCL- BESCOM | 14 Apr 2026 |
| Q4 2025-26 Fire and Safety | 14 Apr 2026 |
| Q4 2025-26 Airport Authority of India | 14 Apr 2026 |
| Q3 2025-26 Form-4 Certificate issued by Chartered AccountantFile: Aarna Form 4_compressed.pdf | 13 Jan 2026 |
| Q3 2025-26 Form-5 Certificate issued by ArchitectFile: form-5_Architecture Certificate_ Q3_12JAN2026.pdf | 13 Jan 2026 |
| Q3 2025-26 Form-6 Certificate issued by Structural EngineerFile: Form-6 Engineer.pdf | 13 Jan 2026 |
| Q3 2025-26 Water supply and sewage board | 13 Jan 2026 |
| Q3 2025-26 KSPCB- PCB (10 Acres to 125 Acres) | 13 Jan 2026 |
| Q3 2025-26 KPTCL- BESCOM | 13 Jan 2026 |
| Q3 2025-26 Fire and Safety | 13 Jan 2026 |
| Q3 2025-26 Airport Authority of India | 13 Jan 2026 |
| Commencement CertificateFile: Commencement Certificate.pdf | 14 May 2024 |
| KSPCB NOCFile: KSPCB NOC.pdf | 14 May 2024 |
| ZR Copy FinalFile: ZR Copy Final.pdf | 14 May 2024 |
| Single plot layout orderFile: Single Plot Layout Order.pdf | 5 May 2024 |
| CDP map showing the proposed siteFile: CDP Map Showing Proposed SIte.pdf | 5 May 2024 |
| commencement certificateFile: sanjeevini dandupalya building licence.pdf | 5 May 2024 |
| KSPCB CFEFile: KSPCB NOC with circular.pdf | 5 May 2024 |
| building licenseFile: sanjeevini dandupalya building licence.pdf | 5 May 2024 |
| all sanctioned drawings are approved digitally, same has been enclosed for your referenceFile: Plan.pdf | 5 May 2024 |
| ZR copyFile: ZR Copy Final.pdf | 5 May 2024 |
| all sanctioned drawings are approved digitally, same has been enclosed for your referenceFile: 1.pdf | 5 May 2024 |
| all sanctioned drawings are approved digitally, same has been enclosed for your referenceFile: 2.pdf | 5 May 2024 |
| all sanctioned drawings are approved digitally, same has been enclosed for your referenceFile: 3.pdf | 5 May 2024 |
| all sanctioned drawings are approved digitally, same has been enclosed for your referenceFile: 4.pdf | 5 May 2024 |
| all sanctioned drawings are approved digitally, same has been enclosed for your referenceFile: 5.pdf | 5 May 2024 |
| all sanctioned drawings are approved digitally, same has been enclosed for your referenceFile: 6.pdf | 5 May 2024 |
| all sanctioned drawings are approved digitally, same has been enclosed for your referenceFile: 7.pdf | 5 May 2024 |
| all sanctioned drawings are approved digitally, same has been enclosed for your referenceFile: 8.pdf | 5 May 2024 |
| ZR CopyFile: Zonal Regulations of Hoskote Local Planning Area .pdf | 5 May 2024 |
| CLU OrderFile: CLU Order Final.pdf | 5 May 2024 |
| Balance Sheet for 2020-21File: bs 2021.pdf | 29 Apr 2024 |
| Profit and Loss for 2020-21File: PL 2021.pdf | 29 Apr 2024 |
| Balance Sheet for 2021-22File: Balance Sheet 2022.pdf | 29 Apr 2024 |
| Profit and Loss for 2021-22File: profit & loss statement 2022.pdf | 29 Apr 2024 |
| Balance Sheet for 2022-23File: BS 2023UDIN.pdf | 29 Apr 2024 |
| Profit and Loss for 2022-23File: PL 2023 UDIN.pdf | 29 Apr 2024 |
| Sources of fund to complete the projectFile: SOURCES OF FUNDS TO COMPLETE THE PROJECT.pdf | 29 Apr 2024 |
| EC from 1-4-2008 to till 31/12/2012File: EC 2004-2023.pdf | 29 Apr 2024 |
| correct notarized affidavit regarding all pending or cleared litigationsFile: No litigationn Affidavit.pdf | 29 Apr 2024 |
| akarbandFile: Akarband Document.pdf | 29 Apr 2024 |
| Break up of types of units (BHK wise)File: Sanjeevini Aarna Block A.xlsx | 29 Apr 2024 |
| Break up of types of units (BHK wise)File: Sanjeevini Aarna Block B.xlsx | 29 Apr 2024 |
| Single plot layoutFile: Proposed Residential single site plan 1.pdf | 29 Apr 2024 |
| Single plot layout orderFile: Proposed Residential single site plan.pdf | 29 Apr 2024 |
| certified carpet area calculationFile: HO 989 CARPET AREA DETAILS.pdf | 29 Apr 2024 |
| CDP map showing the proposed siteFile: CDP Map.pdf | 29 Apr 2024 |
| village map showing the proposed siteFile: Village Map.pdf | 29 Apr 2024 |
| commencement certificateFile: Commencement Certificate.pdf | 29 Apr 2024 |
| Area/no of units of Upload KSPCB CFEFile: KSPCB NOC.pdf | 29 Apr 2024 |
| SEIAA nocFile: Envirormental NOC.pdf | 29 Apr 2024 |
| building licenseFile: sanjeevini dandupalya building licence.pdf | 29 Apr 2024 |
| all sanctioned drawings floor plan, sectional drawings and elevationsFile: 1.pdf | 29 Apr 2024 |
| all sanctioned drawings floor plan, sectional drawings and elevationsFile: 2.pdf | 29 Apr 2024 |
| all sanctioned drawings floor plan, sectional drawings and elevationsFile: 3.pdf | 29 Apr 2024 |
| all sanctioned drawings floor plan, sectional drawings and elevationsFile: 4.pdf | 29 Apr 2024 |
| all sanctioned drawings floor plan, sectional drawings and elevationsFile: 5.pdf | 29 Apr 2024 |
| all sanctioned drawings floor plan, sectional drawings and elevationsFile: 6.pdf | 29 Apr 2024 |
| all sanctioned drawings floor plan, sectional drawings and elevationsFile: 7.pdf | 29 Apr 2024 |
Promoter's earlier projects1
As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.
| Project | Location | Status | Promised | Delivered |
|---|---|---|---|---|
| Sanjeevini Sanctuary | Sy No.37/1, Katha No.890/259, Nallurahalli Village, K R Puram Hobli | Completed | - | No date filed |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Bengaluru Rural
Computed across the 650+ Bengaluru Rural projects on ReraGenie, from their own filings.
Keep Sanjeevini Aarna on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near Bengaluru Rural650+ in Bengaluru Rural
BARCA AT GODREJ MSR CITY
M S RAMAIAH VENTURES LLP
Ozone Urbana
Ozone Urbana Infra Developers Pvt Ltd
Pashmina Brookwoods
Shashwati Realty Pvt Ltd
Godrej Royale Woods
Godrej Projects North Star LLP
Prestige Jindal City-Phase II
PRESTIGE SOUTHCITY HOLDINGS
Provident Botanico
Provident Housing Limited
See every Bengaluru Rural project, with the district possession charts
Builder: Sanjeevini Projects
Sanjeevini Projects has 2 registrations on RERA Karnataka, including Sanjeevini Aarna and SANJEEVINI HELICONIA. Its filings declare 2 earlier projects, 1 of them declared completed. Read the full track record. See more projects on the Bengaluru Rural district page.
Frequently asked questions
What are my rights if Sanjeevini Aarna is delayed beyond 30 Sep 2027?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, at the rate the state's RERA rules prescribe, or exit and claim a full refund with interest. Claims are filed as complaints with RERA Karnataka.
How do I verify and contact the developer of Sanjeevini Aarna?
The registered promoter entity is Sanjeevini Projects, a partnership firm as per the filing. Its GSTIN 29ACJFS0131K1Z0 can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's RERA Karnataka listing and in its filed documents.
Is my payment protected in Sanjeevini Aarna?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
Who certifies construction progress at Sanjeevini Aarna?
The professionals named in the filing: Architect: FWD Architects; Engineer: Cratis Designers Private limited; Chartered Accountant: Nirmala Sreenivasulu. Their certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in Sanjeevini Aarna?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area; that the agreement follows the model agreement under the state's RERA rules, with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on RERA Karnataka, and we read every report.
Report an error Share feedback