Home / Browse projects / Mumbai Suburban, Maharashtra / SANI MASCOT

Registered No litigation declared Residential / Group Housing project

SANI MASCOT

By SANI MASCOT DEVELOPERS

RG-MH-25124 · RERA P51800007030 · Last updated on MahaRERA portal: 17 Apr 2026

Source: official MahaRERA filing

Red flags

  • Completion date moved by 36 months
  • 1 extension taken

Clear

  • No litigation declared
  • No complaints on record
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form

2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Mumbai Suburban registration emailed to you, free during the pilot beta.
Dec 2027Possession promisedmoved 36 months from the original
10 of 22Construction stages doneacross 2 buildings; furthest along: External plumbing and external plaster, 95%
53 of 80Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 205 documents Report an error

SANI MASCOT is a Residential / Group Housing project by SANI MASCOT DEVELOPERS in Mumbai Suburban, Maharashtra, registered with MahaRERA as P51800007030 on 17 Aug 2017. Possession is promised by 31 Dec 2027. The completion date has moved by 36 months from the original filing. 27 of the 80 units on this registration are recorded sold or booked, and 10 of 22 construction stages are filed complete.

At a glance

Project

  • NameSANI MASCOT
  • TypeResidential / Group Housing
  • Location
    • S V ROAD
    • JOGESHWARI WEST
    • Andheri
    • Mumbai Suburban
    • 400102
  • Pincode400102
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51800007030
  • ReraGenie IDRG-MH-25124

Builder

  • NameSANI MASCOT DEVELOPERS
  • Entity typePartnership
  • GSTIN27ABGFS1574E1Z5
  • PartnerABDUL RAHIM SULEMAN GHASWALA

Key dates

this monthRegisteredAug 2017First promiseDec 2024Revised toDec 2027

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on17 Aug 2017
  • Promised completion31 Dec 2027
  • Revised completionRevised to 31 Dec 2027 (originally 30 Dec 2024)
  • Buildings2 building records
  • Documents filed205 files

Current status

34%27 of 80 units booked
30.0%Work done, per cost certificate

Figures as on 17 Apr 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
SANI TOWERS BNA231957057
SANI TOWERS ANA6023023

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building2

As on 17 Apr 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

10 of 22 construction stages are filed complete across 2 buildings. The stage furthest along is External plumbing and external plaster, at 95%.

SANI TOWERS B89%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)80%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises90%
Sanitary Fittings within the flats / premises30%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.95%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.85%
SANI TOWERS A36%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 17 Apr 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes0%
Water SupplyYes50%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsYes100%
Landscaping & Tree PlantingYes50%
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes0%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes90%
Electrical meter room, sub-station, receiving stationYes80%
Aggregate area of recreational Open SpaceYes70%
Open ParkingYes0%

Parking filed65

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots65
Closed/Covered28
Open Space37
BuildingClosed/CoveredOpen SpaceTotal
SANI TOWERS B163753
SANI TOWERS A12012

Land and ownership

Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area9,299 sq m
Land owned byThe promoter
Named landownersNone
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on21 Apr 2026

Approvals and building plan

Sanctioning authoritySlum Rehabilitation Authority
Permissible FSI6466.7
Proposed, not sanctioned2,316 sq m
Buildings approved2
Buildings sanctioned2

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchFAIZAN APARTMENTS, S V ROAD, JOGESHWARI WEST, MUMBAI-400102
Estimated costRs 27.48 cr
Cost incurredRs 8.24 cr
Work done30.0%
BuildingWingEstimatedIncurred
SANI TOWERS BNARs 27.48 crRs 8.24 cr

Certifying professionals and partners4

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectK ZAMAN
EngineerSIDDIQUE SUNASARA
EngineerALTAF HINGORA
Chartered AccountantSUNIL VANKAWALA
PartnerRole in project
SANI MASCOT DEVELOPERS-

Extensions applied for1

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EXT51800025112Dec 2024 → Dec 2027

Reason as filed by the promoterThe project consists of construction of 2 buildings i.e. extension of wing A consisting of 24 number of flats & complete Wing B consisting of 57 number of flats. The construction was delayed due to delay in getting the NOC from the civil aviation authorities due to many technical glitches hence delaying the permission for commencement certificate. We have now received the NOC from civil aviation authorities and also received the full permissions to commence the construction work of both the wings. Now on receiving the full permissions from the authorities for both the wings to commence the wor

Litigation declared1

CaseCourtStatus
642/2014CITY CIVILPENDING

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 29 Jul 2017
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 29 Jul 2017
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 29 Jul 2017
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 21 Nov 2024Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Dec 2027

Documents filed205

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 205 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Form 1File: architect cert.pdf17 Apr 2026
Form 2File: ENGINEER 23-24.pdf17 Apr 2026
Form 3File: form 3 ca_compressed.pdf17 Apr 2026
Disclosure of Sold and Booked InventoryFile: sani sold inventory.pdf17 Apr 2026
Form 1File: architect cert.pdf17 Apr 2026
Form 2File: ENGINEER 23-24.pdf17 Apr 2026
Form 3File: form 3 ca_compressed.pdf17 Apr 2026
Disclosure of Sold and Booked InventoryFile: sani sold inventory.pdf17 Apr 2026
Form 1File: form 1.pdf17 Apr 2026
Form 2File: form 2.pdf17 Apr 2026
Form 3File: form 3 ca_compressed.pdf17 Apr 2026
Disclosure of Sold and Booked InventoryFile: sold.pdf17 Apr 2026
Form 1File: form 1.pdf17 Apr 2026
Form 2File: form 2.pdf17 Apr 2026
Form 3File: form 3 ca_compressed.pdf17 Apr 2026
Disclosure of Sold and Booked InventoryFile: sold.pdf17 Apr 2026
Form 1File: form 1.pdf17 Apr 2026
Form 2File: form 2.pdf17 Apr 2026
Form 3File: form 3 ca_compressed.pdf17 Apr 2026
Disclosure of Sold and Booked InventoryFile: sold.pdf17 Apr 2026
Form 1File: form 1.pdf17 Apr 2026
Form 2File: form 2.pdf17 Apr 2026
Form 3File: form 3 ca_compressed.pdf17 Apr 2026
Disclosure of Sold and Booked InventoryFile: sold.pdf17 Apr 2026
Form 1File: form 1.pdf17 Apr 2026
Form 2File: form 2.pdf17 Apr 2026
Form 3File: form 3 ca_compressed.pdf17 Apr 2026
Disclosure of Sold and Booked InventoryFile: sold.pdf17 Apr 2026
Form 1File: form 1.pdf17 Apr 2026
Form 2File: form 2.pdf17 Apr 2026
Form 3File: form 3 ca_compressed.pdf17 Apr 2026
Disclosure of Sold and Booked InventoryFile: sold.pdf17 Apr 2026
Form 2A (FY 2017-2018)File: 2017-18.pdf17 Apr 2026
Form 2A (FY 2018-2019)File: 2018-19.pdf17 Apr 2026
Form 2A (FY 2019-2020)File: 2019-20.pdf17 Apr 2026
Form 2A (FY 2020-2021)File: 2020-21.pdf17 Apr 2026
Form 2A (FY 2021-2022)File: 2021-22.pdf17 Apr 2026
Form 2A (FY 2022-2023)File: 2022-23.pdf17 Apr 2026
Form 2A (FY 2023-2024)File: 2023-24.pdf17 Apr 2026
Form 2A (FY 2024-2025)File: 2024-25.pdf17 Apr 2026
Form 2A (FY 2025-2026)File: 2025-26.pdf17 Apr 2026
Form 1File: ARCHITECT CERTIFICATE.pdf13 Apr 2026
Form 2File: ENGINNER CERTIFICATE.pdf13 Apr 2026
Form 3File: FORM 3 FROM CA.pdf13 Apr 2026
Disclosure of Sold and Booked InventoryFile: sani sold inventory.pdf13 Apr 2026
Disclosure of Sold and Booked InventoryFile: sani sold inventory.pdf13 Apr 2026
Form 1File: ARCHITECT CERTIFICATE.pdf13 Apr 2026
Form 2File: ENGINNER CERTIFICATE.pdf13 Apr 2026
Form 3File: FORM 3 CA CERTIFICATE.pdf13 Apr 2026
Disclosure of Sold and Booked InventoryFile: sani sold inventory.pdf13 Apr 2026
Form 1File: ARCHITECT CERTIFICATE.pdf13 Apr 2026
Form 2File: ENGINNER CERTIFICATE.pdf13 Apr 2026
Form 3File: FORM 3 CA CERTIFICATE.pdf13 Apr 2026
Disclosure of Sold and Booked InventoryFile: sani sold inventory.pdf13 Apr 2026
Form 1File: ARCHITECT CERTIFICATE.pdf13 Apr 2026
Form 2File: ENGINEER CERTIFICATE.pdf13 Apr 2026
Form 3File: FORM 3 CA CERTIFICATE.pdf13 Apr 2026
Disclosure of Sold and Booked InventoryFile: sani sold inventory.pdf13 Apr 2026
Form 1File: ARCHITECT CERTIFICATE.pdf13 Apr 2026
Form 2File: ENGINEER CERTIFICATE.pdf13 Apr 2026
Form 3File: FORM 3 CA CERTIFICATE.pdf13 Apr 2026
Disclosure of Sold and Booked InventoryFile: sani sold inventory.pdf13 Apr 2026
Form 1File: ARCHITECT CERTIFICATE.pdf13 Apr 2026
Form 2File: ENGINEER CERTIFICATE.pdf13 Apr 2026
Form 3File: FORM 3 CA CERTIFICATE.pdf13 Apr 2026
Disclosure of Sold and Booked InventoryFile: sani sold inventory.pdf13 Apr 2026
Form 1File: ARCHITECT CERTIFICATE.pdf13 Apr 2026
Form 2File: ENGINEER CERTIFICATE.pdf13 Apr 2026
Form 3File: FORM 3 CA CERTIFICATE.pdf13 Apr 2026
Disclosure of Sold and Booked InventoryFile: sani sold inventory.pdf13 Apr 2026
Form 1File: ARCHITECT CERTIFICATE.pdf13 Apr 2026
Form 2File: ENGINEER CERTIFICATE.pdf13 Apr 2026
Form 3File: FORM 3 FROM CA.pdf13 Apr 2026
Form 2File: ENGINEER CERTIFICATE.pdf13 Apr 2026
Form 3File: FORM 3 FROM CA.pdf13 Apr 2026
Form 1File: ARCHITECT CERTIFICATE.pdf13 Apr 2026
Disclosure of Sold and Booked InventoryFile: sani sold inventory.pdf13 Apr 2026
Disclosure of Sold and Booked InventoryFile: sani sold inventory.pdf13 Apr 2026
Form 1File: ARCHITECT CERTIFICATE.pdf13 Apr 2026
Form 2File: ENGINEER CERTIFICATE.pdf13 Apr 2026

How this compares with Mumbai Suburban

34%of this project is bookeddistrict median 30%
33%of Mumbai Suburban projects moved their completion datethis one moved by 36 months
21%of Mumbai Suburban registrations have lapsed or been cancelledthis one is on the register

Computed across the 6,700+ Mumbai Suburban projects on ReraGenie, from their own filings.

Free monthly report: Mumbai on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep SANI MASCOT on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near JOGESHWARI WEST6,700+ in Mumbai Suburban

Builder: SANI MASCOT DEVELOPERS

SANI MASCOT DEVELOPERS has 1 registration on MahaRERA, including SANI MASCOT. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Mumbai Suburban district page.

Frequently asked questions

What are my rights if SANI MASCOT is delayed beyond 31 Dec 2027?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of SANI MASCOT?

The registered promoter entity is SANI MASCOT DEVELOPERS, a partnership as per the filing. Its GSTIN 27ABGFS1574E1Z5 can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in SANI MASCOT?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for SANI MASCOT?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at SANI MASCOT?

The professionals named in the filing: Architect: K ZAMAN; Engineer: SIDDIQUE SUNASARA; Engineer: ALTAF HINGORA; Chartered Accountant: SUNIL VANKAWALA. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in SANI MASCOT?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About SANI MASCOT. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save SANI MASCOT to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.