Red flags

  • 18 complaints at MahaRERA
  • Completion date moved by 90 months
  • 2 extensions taken

Clear

  • No litigation declared
  • Separate project account declared
  • Allotment letter follows the model form
  • Recorded completed on MahaRERA

3 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Mumbai Suburban registration emailed to you, free during the pilot beta.
Jun 2026Possession promisedregistration recorded completed
11 of 11Construction stages doneevery applicable stage filed complete
18Complaints at MahaRERAon this registration
Jump to the 68 documents Report an error

SANGHVI SOLITAIRE is a Others project by Sanghvi Premises Private Limited in Mumbai Suburban, Maharashtra, registered with MahaRERA as P51800003858 on 6 Aug 2017. The registration is recorded completed; possession was promised by 30 Jun 2026. The completion date has moved by 90 months from the original filing. 18 complaints are on record with the regulator.

At a glance

Project

  • NameSANGHVI SOLITAIRE
  • TypeOthers
  • Location
    • Jestaram Kapadia Rd
    • Chinchpada
    • Borivali
    • Borivali
    • Mumbai Suburban
    • 400066
  • Pincode400066
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51800003858
  • ReraGenie IDRG-MH-09755

Builder

  • NameSanghvi Premises Private Limited
  • Entity typeCompany
  • Other registrations7 more →
  • Completed5 of 8
  • No longer live3 lapsed, de-registered or revoked
  • Declared earlier projects19 →

Key dates

this monthRegisteredAug 2017First promiseDec 2018Revised toJun 2026Recorded completed

Key facts

Registration and timeline

  • StatusCompleted
  • Registered on6 Aug 2017
  • Promised completion30 Jun 2026
  • Revised completionRevised to 30 Jun 2026 (originally 31 Dec 2018)
  • Buildings1 building record
  • Documents filed68 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Sanghvi SolitaireNA220000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 24 Jan 2025, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

11 of 11 construction stages are filed complete.

Sanghvi Solitaire: 100% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Progress on shared amenities15

As on 24 Jan 2025, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes100%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsYes100%
Landscaping & Tree PlantingNoNot applicable
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes100%
Energy managemcntYes100%
Fire protection and fire safety requirementsYes100%
Electrical meter room, sub-station, receiving stationYes100%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Parking filed46

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots46
Closed/Covered46

Land and ownership

MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area1,638 sq m
Land owned byThe promoter
Named landownersNone

Approvals and building plan

Permissible FSI3547.81
Proposed, not sanctioned3,548 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchShapoorji Pallonji Building, Dr Shirodkar Marg, Near KEM Hospital, Opp Bata Showroom, Mumbai 400012

Certifying professionals and partners2

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectArcvishan Infratech Ltd
EngineerPatel Kulkarni Consultants
PartnerRole in project
Sanghvi Premises Private Limited-

Extensions applied for2

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EXT51800002125Dec 2018 → Dec 2019

Reason as filed by the promoterWe have applied for O.C. and amendment of plans vide our Architect’s letter with Ref no. AIL/10866 dated 01/10/2018 and dated 04/04/2019 respectively. However, due to implementation of New DCPR-2034 and Parliament election, the engineering staff of the concerned authorities were busy and hence, the above referred applications could not get processed. Recently vide letter dated 10/07/2019, SRA has rejected our proposal of Occupation Certificate citing the reasons that, an order came to be passed by National Commission for Schedule Tribes in its meeting dated 27.02.2019 whereby the said Commissi

EXT51800019748Dec 2018 → Jun 2026

Reason as filed by the promoterThe primary reason for this extension request is the ongoing issue related to the old and dilapidated compound wall near the main gate of the said project which has been illegally encroached by persons not known to us they have also unauthorizedly constructed 3/4 structures using the support of said wall, which has led to certain challenges in obtaining the Full Occupation Certificate (OC) for the entire project.

Complaints filed with MahaRERA18

Case no.ComplainantRespondentFiled
CC006000000120969Dinesh JainM/s. Sanghvi Premises Pvt Ltd15/10/2019
CC006000000120970Mr.Chandra Shekhar KotianM/s. Sanghvi Premises Pvt Ltd15/10/2019
CC006000000120971Mr. Maniben R. RathodM/s. Sanghvi Premises PVt Limited15/10/2019
CC006000000120972Priyanka V. SamantM/s. Sanghvi Premises Pvt Limited15/10/2019
CC006000000120973Aruna R. AdagatlaM/s. Sanghvi Premises Pvt. Ltd15/10/2019
CC006000000120974Vivek .S MalvankarM/s. Sanghvi Premises Pvt Limited15/10/2019
CC006000000120975Mr. Aaditya A. WalawalkarM/s. Sanghvi Premises Pvt.Ltd15/10/2019
CC006000000120977Mrs. Lata T. SalianM/s. Sanghvi Premises Pvt Limited15/10/2019
CC006000000120978Ramesh Parmar & Sudha ParmarSanghvi Premises P Ltd11/11/2021
CC006000000120979Sugan OstwalSanghvi Premises P Ltd11/11/2021
CC006000000209835SANGHVI PREMISES PRIVATE LIMITEDPRIYANKA V. SAMANT31/01/2022
CC006000000209839SANGHVI PREMISES PRIVATE LIMITEDLATA T. SALIAN31/01/2022
CC006000000209840SANGHVI PREMISES PRIVATE LIMITEDDINESH BABULAL JAIN31/01/2022
CC006000000209841SANGHVI PREMISES PRIVATE LIMITEDCHANDRA SHEKHAR KOTIAN31/01/2022
CC006000000209842SANGHVI PREMISES PRIVATE LIMITEDMANIBEN R. RATHOD31/01/2022
CC006000000209843SANGHVI PREMISES PRIVATE LIMITEDARUNA R. ADAGATLA31/01/2022
CC006000000209845SANGHVI PREMISES PRIVATE LIMITEDVIVEK MALVANKAR31/01/2022
CC006000000209846SANGHVI PREMISES PRIVATE LIMITEDAADITYA A. WALAWALKAR31/01/2022

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 4 Oct 2021
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 4 Oct 2021
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 7 Jun 2018
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 2 Sep 2021Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateOn the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    uploaded 1 Apr 2022

Documents filed68

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Disclosure of sold/ booked inventoryFile: DSC_Solitaire MIS_11zon.pdf24 Jan 2025
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Form 5_FY 23-24_Sanghvi Solitaire_V2.pdf31 Dec 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1.pdf7 Nov 2024
Disclosure of sold/ booked inventoryFile: sold unsold _ Solitaire_11zon.pdf31 Jul 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: Form 2A_FY 19-20_Sanghvi Solitaire_11zon.pdf5 Jul 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: Form 2A_FY 19-20_Sanghvi Solitaire_11zon (1).pdf5 Jul 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Form 2A_FY 20-21_Sanghvi Solitaire_11zon.pdf5 Jul 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Form 2A_FY 20-21_Sanghvi Solitaire_11zon (1).pdf5 Jul 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: Form 2A_FY 21-22_Sanghvi Solitaire_11zon.pdf5 Jul 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: Form 2A_FY 21-22_Sanghvi Solitaire_11zon (1).pdf5 Jul 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Form 2A_FY 22-23_Sanghvi Solitaire_11zon.pdf5 Jul 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Form 2A_FY 23-24_Sanghvi Solitaire_11zon.pdf5 Jul 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Form 2A_FY 22-23_Sanghvi Solitaire_11zon (1).pdf5 Jul 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Form 2A_FY 23-24_Sanghvi Solitaire_11zon (1).pdf5 Jul 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1_Solitaire.pdf4 Jul 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 Solitaire.pdf11 Jun 2024
Certificates of CA (Form 3)File: Form 3 - Final_11zon.pdf11 Jun 2024
Disclosure of sold/ booked inventoryFile: Disclosure of sold unsold units_11zon.pdf9 May 2024
Disclosure of sold/ booked inventoryFile: Disclosure of sold unsold units_v1.pdf9 May 2024
Disclosure of sold/ booked inventoryFile: Sanghvi Solitaire_2.pdf6 Nov 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Form 5 _Sanghvi Solitaire 22-23_SIGNED Final.pdf17 Oct 2023
Disclosure of sold/ booked inventoryFile: Sanghvi Soliatire as on 30062023.pdf29 Aug 2023
Disclosure of sold/ booked inventoryFile: Sanghvi Solitaire_Disclosure of sold unsold.pdf28 Jan 2023
Disclosure of sold/ booked inventoryFile: Sanghvi Solitare - Sold Unsold details.pdf24 Nov 2022
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: Sanghvi Solitaire_Form 5 FY 21-22.pdf14 Oct 2022
Disclosure of sold/ booked inventoryFile: Sanghvi Solitaire30062022.pdf19 Jul 2022
Disclosure of sold/ booked inventoryFile: Sanghvi Solitaire31122021.pdf2 Jun 2022
Disclosure of sold/ booked inventoryFile: Sanghvi Solitaire31032022.pdf2 Jun 2022
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: solitaire certificate 03052022.pdf1 Jun 2022
Certificates of CA (Form 3)File: Sanghvi Solitaire as on 31122021.pdf5 Apr 2022
Certificates of CA (Form 3)File: Sanghvi Solitaireas on 31122021.pdf5 Apr 2022
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: O C borivali OCT 2021.pdf1 Apr 2022
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: Form 5_Sanghvi Solitaire_20-21 Signed.pdf21 Jan 2022
Layout approvalFile: Layout Approval Upload_compressed.pdf4 Oct 2021
Copy of the legal title reportFile: Layout Approval Upload_compressed.pdf4 Oct 2021
Copy of Layout Approval (in case of layout)File: Layout Approval Upload_compressed.pdf4 Oct 2021
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: Part OC Solitaire_17 floors.pdf14 Sep 2021
Commencement Certificates / NA Order for plotted developmentFile: Sanghvi solitaire borivali further CC date 01_09_2021_compressed.pdf2 Sep 2021
Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)File: Sanghvi Solitaire Form 5 18-19.pdf18 Feb 2021
Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: Sanghvi Heights Form 5 19-20.pdf18 Feb 2021
Architect’s Certificate on Completion of Project (Form 4)File: Form 4 Solitare.pdf13 Jul 2020
Commencement Certificates / NA Order for plotted developmentFile: CC Composite Ashray_compressed.pdf9 Oct 2019
OtherFile: Part OC Solitaire.pdf9 Oct 2019
OtherFile: NCST Borivali Matter Order uploaded.pdf4 Oct 2019
Details of encumbrancesFile: Solitaire Encumbrance 29-01-2019.pdf29 Jan 2019
Certificates of CA (Form 5)File: Rera Form 5 Solitaire.pdf30 Sep 2018
Building plan approvalFile: 18 and 19 Revised Floor Plans.pdf7 Jun 2018
Building Plan Approval (IOD)File: 18 and 19 Revised Floor Plans.pdf7 Jun 2018
Certificates of CA (Form 3)File: solitaire ca certificate.pdf30 Jul 2017
Layout approvalFile: buiding plan IOD 1 2.pdf29 Jul 2017
Copy of Layout Approval (in case of layout)File: buiding plan IOD 1 2.pdf29 Jul 2017
Declaration in FORM BFile: FORM B Solitaire.pdf29 Jul 2017
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: engineer certificate solitaire.pdf29 Jul 2017
Proforma of Allotment letterFile: Agreement for Sale - solitaire.pdf29 Jul 2017
Building plan approvalFile: buiding plan IOD 1 2.pdf28 Jul 2017
Building plan approvalFile: building plan 3 4 IOD.pdf28 Jul 2017
Building plan approvalFile: building plan IOD 5 6.pdf28 Jul 2017
Building plan approvalFile: building plan IOD 7 8.pdf28 Jul 2017
Copy of the legal title reportFile: solitaire title cert.pdf28 Jul 2017
Details of encumbrancesFile: Encumbrance Certificate Solitaire.pdf28 Jul 2017
Building Plan Approval (IOD)File: buiding plan IOD 1 2.pdf28 Jul 2017
Building Plan Approval (IOD)File: building plan 3 4 IOD.pdf28 Jul 2017
Building Plan Approval (IOD)File: building plan IOD 5 6.pdf28 Jul 2017
Building Plan Approval (IOD)File: building plan IOD 7 8.pdf28 Jul 2017
Commencement Certificates / NA Order for plotted developmentFile: commencement certificate.pdf28 Jul 2017
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect Certificate-Solitiare.pdf28 Jul 2017
PAN CardFile: SAPPL Pdf.pdf25 Jul 2017
Proforma of Allotment letterFile: Allotment letter solitaire.pdf25 Jul 2017

Promoter's earlier projects9

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

9 delivered late
ProjectLocationFlatsStatusPromisedDelivered
Sanghvi Valley Phase IIOld Mumbai Pune Road Next to Vastu Anand Parsik Nagar Kalwa West Thane 400 605124CompletedDec 2015Late, Feb 2016
Sanghvi S3 Ecocity SprintNear Thakur Mall. Mira Road East226CompletedDec 2015Late, Apr 2016
Sanghvi Nisarg Phase IIRaywood Park Colony Near Khondgewadi Lonavala 41040112CompletedJun 2015Late, Jul 2015
Shree Mohankheda HeightsRambhau Bhogale Marg Near MHADA Colony Ghodapdev Mazgaon Mumbai 40003360CompletedDec 2013Late, Mar 2014
Sanghvi Galaxy10th Khetwadi Lane Girgaon Mumbai 40000434CompletedDec 2011Late, Nov 2012
Sanghvi ExoticaOpp Movie Gem Rajshree Theatre Maratha Colony Road Dahisar E Mumbai75CompletedDec 2011Late, Jul 2012
Sanghvi NakshtraPokar Colony Dhindori Road Mhasrul Nasik 42200496CompletedJul 2011Late, Aug 2011
Sanghvi Nisarg Phase IRaywood Park Colony Near Khondgewadi Lonavala 41040144CompletedMar 2011Late, Dec 2015
Sanghvi Valley Phase IOld Mumbai Pune Road Next to Vastu Anand Parsik Nagar Kalwa West Thane 400 605176CompletedDec 2009Late, Jun 2010

How this compares with Mumbai Suburban

33%of Mumbai Suburban projects moved their completion datethis one moved by 90 months
21%of Mumbai Suburban registrations have lapsed or been cancelledthis one is completed

Computed across the 6,700+ Mumbai Suburban projects on ReraGenie, from their own filings.

Free monthly report: Mumbai on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep SANGHVI SOLITAIRE on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Chinchpada, Borivali6,700+ in Mumbai Suburban

2 kmSANGHVI SOLITAIRECompleted 149Lapsed / revoked 89Other 209Dot size: filed unitsN

Filed coordinates, straight-line distance. 447 registered projects within 2 km.

Builder: Sanghvi Premises Private Limited

Sanghvi Premises Private Limited has 8 registrations on MahaRERA, including Sanghvi Evana and SANGHVI SOLITAIRE. Its filings disclose 19 earlier MahaRERA projects: declares 1 of 18 past projects completed on time. Read the full track record. See more projects on the Mumbai Suburban district page.

Frequently asked questions

What are my rights if SANGHVI SOLITAIRE is delayed beyond 30 Jun 2026?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of SANGHVI SOLITAIRE?

The registered promoter entity is Sanghvi Premises Private Limited, a company as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in SANGHVI SOLITAIRE?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How do I read the complaint cases filed against SANGHVI SOLITAIRE?

Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.

How current is the construction progress shown for SANGHVI SOLITAIRE?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at SANGHVI SOLITAIRE?

The professionals named in the filing: Architect: Arcvishan Infratech Ltd; Engineer: Patel Kulkarni Consultants. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in SANGHVI SOLITAIRE?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About SANGHVI SOLITAIRE. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save SANGHVI SOLITAIRE to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.