Home / Browse projects / Mumbai Suburban, Maharashtra / SANGHVI SOLITAIRE
SANGHVI SOLITAIRE
By Sanghvi Premises Private Limited
RG-MH-09755 · RERA P51800003858 · Last updated on MahaRERA portal: 24 Jan 2025
Source: official MahaRERA filing
Red flags
- 18 complaints at MahaRERA
- Completion date moved by 90 months
- 2 extensions taken
Clear
- No litigation declared
- Separate project account declared
- Allotment letter follows the model form
- Recorded completed on MahaRERA
3 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.
See what the report covers Free either way: or have every new Mumbai Suburban registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
SANGHVI SOLITAIRE is a Others project by Sanghvi Premises Private Limited in Mumbai Suburban, Maharashtra, registered with MahaRERA as P51800003858 on 6 Aug 2017. The registration is recorded completed; possession was promised by 30 Jun 2026. The completion date has moved by 90 months from the original filing. 18 complaints are on record with the regulator.
At a glance
Project
- NameSANGHVI SOLITAIRE
- TypeOthers
- Location
- Jestaram Kapadia Rd
- Chinchpada
- Borivali
- Borivali
- Mumbai Suburban
- 400066
- Pincode400066
- MapView location on Google Maps (as filed on RERA)
- RERA no.P51800003858
- ReraGenie IDRG-MH-09755
Key dates
Key facts
Registration and timeline
- StatusCompleted
- Registered on6 Aug 2017
- Promised completion30 Jun 2026
- Revised completionRevised to 30 Jun 2026 (originally 31 Dec 2018)
- Buildings1 building record
- Documents filed68 files
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| Sanghvi Solitaire | NA | 22 | 0 | 0 | 0 | 0 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building1
As on 24 Jan 2025, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
11 of 11 construction stages are filed complete.
Sanghvi Solitaire: 100% average across the applicable activities
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 100% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
Progress on shared amenities15
As on 24 Jan 2025, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | No | Not applicable |
| Water Supply | Yes | 100% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 100% |
| Storm Water Drains | Yes | 100% |
| Landscaping & Tree Planting | No | Not applicable |
| Street Lighting | No | Not applicable |
| Community Buildings | No | Not applicable |
| Treatment And Disposal Of Sewage And Sullage Water | No | Not applicable |
| Solid Waste Management And Disposal | No | Not applicable |
| Water conservation /Rain water harvesting | Yes | 100% |
| Energy managemcnt | Yes | 100% |
| Fire protection and fire safety requirements | Yes | 100% |
| Electrical meter room, sub-station, receiving station | Yes | 100% |
| Aggregate area of recreational Open Space | No | Not applicable |
| Open Parking | No | Not applicable |
Parking filed46
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
Land and ownership
MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
Certifying professionals and partners2
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | Arcvishan Infratech Ltd |
| Engineer | Patel Kulkarni Consultants |
| Partner | Role in project |
|---|---|
| Sanghvi Premises Private Limited | - |
Extensions applied for2
A revised date filed with the regulator does not change the possession date in your agreement for sale.
Reason as filed by the promoterWe have applied for O.C. and amendment of plans vide our Architect’s letter with Ref no. AIL/10866 dated 01/10/2018 and dated 04/04/2019 respectively. However, due to implementation of New DCPR-2034 and Parliament election, the engineering staff of the concerned authorities were busy and hence, the above referred applications could not get processed. Recently vide letter dated 10/07/2019, SRA has rejected our proposal of Occupation Certificate citing the reasons that, an order came to be passed by National Commission for Schedule Tribes in its meeting dated 27.02.2019 whereby the said Commissi
Reason as filed by the promoterThe primary reason for this extension request is the ongoing issue related to the old and dilapidated compound wall near the main gate of the said project which has been illegally encroached by persons not known to us they have also unauthorizedly constructed 3/4 structures using the support of said wall, which has led to certain challenges in obtaining the Full Occupation Certificate (OC) for the entire project.
Complaints filed with MahaRERA18
| Case no. | Complainant | Respondent | Filed |
|---|---|---|---|
| CC006000000120969 | Dinesh Jain | M/s. Sanghvi Premises Pvt Ltd | 15/10/2019 |
| CC006000000120970 | Mr.Chandra Shekhar Kotian | M/s. Sanghvi Premises Pvt Ltd | 15/10/2019 |
| CC006000000120971 | Mr. Maniben R. Rathod | M/s. Sanghvi Premises PVt Limited | 15/10/2019 |
| CC006000000120972 | Priyanka V. Samant | M/s. Sanghvi Premises Pvt Limited | 15/10/2019 |
| CC006000000120973 | Aruna R. Adagatla | M/s. Sanghvi Premises Pvt. Ltd | 15/10/2019 |
| CC006000000120974 | Vivek .S Malvankar | M/s. Sanghvi Premises Pvt Limited | 15/10/2019 |
| CC006000000120975 | Mr. Aaditya A. Walawalkar | M/s. Sanghvi Premises Pvt.Ltd | 15/10/2019 |
| CC006000000120977 | Mrs. Lata T. Salian | M/s. Sanghvi Premises Pvt Limited | 15/10/2019 |
| CC006000000120978 | Ramesh Parmar & Sudha Parmar | Sanghvi Premises P Ltd | 11/11/2021 |
| CC006000000120979 | Sugan Ostwal | Sanghvi Premises P Ltd | 11/11/2021 |
| CC006000000209835 | SANGHVI PREMISES PRIVATE LIMITED | PRIYANKA V. SAMANT | 31/01/2022 |
| CC006000000209839 | SANGHVI PREMISES PRIVATE LIMITED | LATA T. SALIAN | 31/01/2022 |
| CC006000000209840 | SANGHVI PREMISES PRIVATE LIMITED | DINESH BABULAL JAIN | 31/01/2022 |
| CC006000000209841 | SANGHVI PREMISES PRIVATE LIMITED | CHANDRA SHEKHAR KOTIAN | 31/01/2022 |
| CC006000000209842 | SANGHVI PREMISES PRIVATE LIMITED | MANIBEN R. RATHOD | 31/01/2022 |
| CC006000000209843 | SANGHVI PREMISES PRIVATE LIMITED | ARUNA R. ADAGATLA | 31/01/2022 |
| CC006000000209845 | SANGHVI PREMISES PRIVATE LIMITED | VIVEK MALVANKAR | 31/01/2022 |
| CC006000000209846 | SANGHVI PREMISES PRIVATE LIMITED | AADITYA A. WALAWALKAR | 31/01/2022 |
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 4 Oct 2021 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 4 Oct 2021 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 7 Jun 2018 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 2 Sep 2021Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateOn the file
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
uploaded 1 Apr 2022
Documents filed68
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Disclosure of sold/ booked inventoryFile: DSC_Solitaire MIS_11zon.pdf | 24 Jan 2025 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Form 5_FY 23-24_Sanghvi Solitaire_V2.pdf | 31 Dec 2024 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1.pdf | 7 Nov 2024 |
| Disclosure of sold/ booked inventoryFile: sold unsold _ Solitaire_11zon.pdf | 31 Jul 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: Form 2A_FY 19-20_Sanghvi Solitaire_11zon.pdf | 5 Jul 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: Form 2A_FY 19-20_Sanghvi Solitaire_11zon (1).pdf | 5 Jul 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Form 2A_FY 20-21_Sanghvi Solitaire_11zon.pdf | 5 Jul 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Form 2A_FY 20-21_Sanghvi Solitaire_11zon (1).pdf | 5 Jul 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: Form 2A_FY 21-22_Sanghvi Solitaire_11zon.pdf | 5 Jul 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: Form 2A_FY 21-22_Sanghvi Solitaire_11zon (1).pdf | 5 Jul 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Form 2A_FY 22-23_Sanghvi Solitaire_11zon.pdf | 5 Jul 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Form 2A_FY 23-24_Sanghvi Solitaire_11zon.pdf | 5 Jul 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Form 2A_FY 22-23_Sanghvi Solitaire_11zon (1).pdf | 5 Jul 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Form 2A_FY 23-24_Sanghvi Solitaire_11zon (1).pdf | 5 Jul 2024 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1_Solitaire.pdf | 4 Jul 2024 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 Solitaire.pdf | 11 Jun 2024 |
| Certificates of CA (Form 3)File: Form 3 - Final_11zon.pdf | 11 Jun 2024 |
| Disclosure of sold/ booked inventoryFile: Disclosure of sold unsold units_11zon.pdf | 9 May 2024 |
| Disclosure of sold/ booked inventoryFile: Disclosure of sold unsold units_v1.pdf | 9 May 2024 |
| Disclosure of sold/ booked inventoryFile: Sanghvi Solitaire_2.pdf | 6 Nov 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Form 5 _Sanghvi Solitaire 22-23_SIGNED Final.pdf | 17 Oct 2023 |
| Disclosure of sold/ booked inventoryFile: Sanghvi Soliatire as on 30062023.pdf | 29 Aug 2023 |
| Disclosure of sold/ booked inventoryFile: Sanghvi Solitaire_Disclosure of sold unsold.pdf | 28 Jan 2023 |
| Disclosure of sold/ booked inventoryFile: Sanghvi Solitare - Sold Unsold details.pdf | 24 Nov 2022 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: Sanghvi Solitaire_Form 5 FY 21-22.pdf | 14 Oct 2022 |
| Disclosure of sold/ booked inventoryFile: Sanghvi Solitaire30062022.pdf | 19 Jul 2022 |
| Disclosure of sold/ booked inventoryFile: Sanghvi Solitaire31122021.pdf | 2 Jun 2022 |
| Disclosure of sold/ booked inventoryFile: Sanghvi Solitaire31032022.pdf | 2 Jun 2022 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: solitaire certificate 03052022.pdf | 1 Jun 2022 |
| Certificates of CA (Form 3)File: Sanghvi Solitaire as on 31122021.pdf | 5 Apr 2022 |
| Certificates of CA (Form 3)File: Sanghvi Solitaireas on 31122021.pdf | 5 Apr 2022 |
| Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: O C borivali OCT 2021.pdf | 1 Apr 2022 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: Form 5_Sanghvi Solitaire_20-21 Signed.pdf | 21 Jan 2022 |
| Layout approvalFile: Layout Approval Upload_compressed.pdf | 4 Oct 2021 |
| Copy of the legal title reportFile: Layout Approval Upload_compressed.pdf | 4 Oct 2021 |
| Copy of Layout Approval (in case of layout)File: Layout Approval Upload_compressed.pdf | 4 Oct 2021 |
| Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: Part OC Solitaire_17 floors.pdf | 14 Sep 2021 |
| Commencement Certificates / NA Order for plotted developmentFile: Sanghvi solitaire borivali further CC date 01_09_2021_compressed.pdf | 2 Sep 2021 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)File: Sanghvi Solitaire Form 5 18-19.pdf | 18 Feb 2021 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: Sanghvi Heights Form 5 19-20.pdf | 18 Feb 2021 |
| Architect’s Certificate on Completion of Project (Form 4)File: Form 4 Solitare.pdf | 13 Jul 2020 |
| Commencement Certificates / NA Order for plotted developmentFile: CC Composite Ashray_compressed.pdf | 9 Oct 2019 |
| OtherFile: Part OC Solitaire.pdf | 9 Oct 2019 |
| OtherFile: NCST Borivali Matter Order uploaded.pdf | 4 Oct 2019 |
| Details of encumbrancesFile: Solitaire Encumbrance 29-01-2019.pdf | 29 Jan 2019 |
| Certificates of CA (Form 5)File: Rera Form 5 Solitaire.pdf | 30 Sep 2018 |
| Building plan approvalFile: 18 and 19 Revised Floor Plans.pdf | 7 Jun 2018 |
| Building Plan Approval (IOD)File: 18 and 19 Revised Floor Plans.pdf | 7 Jun 2018 |
| Certificates of CA (Form 3)File: solitaire ca certificate.pdf | 30 Jul 2017 |
| Layout approvalFile: buiding plan IOD 1 2.pdf | 29 Jul 2017 |
| Copy of Layout Approval (in case of layout)File: buiding plan IOD 1 2.pdf | 29 Jul 2017 |
| Declaration in FORM BFile: FORM B Solitaire.pdf | 29 Jul 2017 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: engineer certificate solitaire.pdf | 29 Jul 2017 |
| Proforma of Allotment letterFile: Agreement for Sale - solitaire.pdf | 29 Jul 2017 |
| Building plan approvalFile: buiding plan IOD 1 2.pdf | 28 Jul 2017 |
| Building plan approvalFile: building plan 3 4 IOD.pdf | 28 Jul 2017 |
| Building plan approvalFile: building plan IOD 5 6.pdf | 28 Jul 2017 |
| Building plan approvalFile: building plan IOD 7 8.pdf | 28 Jul 2017 |
| Copy of the legal title reportFile: solitaire title cert.pdf | 28 Jul 2017 |
| Details of encumbrancesFile: Encumbrance Certificate Solitaire.pdf | 28 Jul 2017 |
| Building Plan Approval (IOD)File: buiding plan IOD 1 2.pdf | 28 Jul 2017 |
| Building Plan Approval (IOD)File: building plan 3 4 IOD.pdf | 28 Jul 2017 |
| Building Plan Approval (IOD)File: building plan IOD 5 6.pdf | 28 Jul 2017 |
| Building Plan Approval (IOD)File: building plan IOD 7 8.pdf | 28 Jul 2017 |
| Commencement Certificates / NA Order for plotted developmentFile: commencement certificate.pdf | 28 Jul 2017 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect Certificate-Solitiare.pdf | 28 Jul 2017 |
| PAN CardFile: SAPPL Pdf.pdf | 25 Jul 2017 |
| Proforma of Allotment letterFile: Allotment letter solitaire.pdf | 25 Jul 2017 |
Promoter's earlier projects9
As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.
| Project | Location | Flats | Status | Promised | Delivered |
|---|---|---|---|---|---|
| Sanghvi Valley Phase II | Old Mumbai Pune Road Next to Vastu Anand Parsik Nagar Kalwa West Thane 400 605 | 124 | Completed | Dec 2015 | Late, Feb 2016 |
| Sanghvi S3 Ecocity Sprint | Near Thakur Mall. Mira Road East | 226 | Completed | Dec 2015 | Late, Apr 2016 |
| Sanghvi Nisarg Phase II | Raywood Park Colony Near Khondgewadi Lonavala 410401 | 12 | Completed | Jun 2015 | Late, Jul 2015 |
| Shree Mohankheda Heights | Rambhau Bhogale Marg Near MHADA Colony Ghodapdev Mazgaon Mumbai 400033 | 60 | Completed | Dec 2013 | Late, Mar 2014 |
| Sanghvi Galaxy | 10th Khetwadi Lane Girgaon Mumbai 400004 | 34 | Completed | Dec 2011 | Late, Nov 2012 |
| Sanghvi Exotica | Opp Movie Gem Rajshree Theatre Maratha Colony Road Dahisar E Mumbai | 75 | Completed | Dec 2011 | Late, Jul 2012 |
| Sanghvi Nakshtra | Pokar Colony Dhindori Road Mhasrul Nasik 422004 | 96 | Completed | Jul 2011 | Late, Aug 2011 |
| Sanghvi Nisarg Phase I | Raywood Park Colony Near Khondgewadi Lonavala 410401 | 44 | Completed | Mar 2011 | Late, Dec 2015 |
| Sanghvi Valley Phase I | Old Mumbai Pune Road Next to Vastu Anand Parsik Nagar Kalwa West Thane 400 605 | 176 | Completed | Dec 2009 | Late, Jun 2010 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Mumbai Suburban
Computed across the 6,700+ Mumbai Suburban projects on ReraGenie, from their own filings.
Free monthly report: Mumbai on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Useful on a completed registration when you are buying resale, or checking what was promised against what was delivered.
- 3 conditions on this project's record read and explained, with the clear checks alongside
- Joined against the promoter's 7 other registrations and every project registered within 2 km, which the RERA portal never shows together
- All 68 filed documents as one ZIP, foldered, with a manifest
Keep SANGHVI SOLITAIRE on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near Chinchpada, Borivali6,700+ in Mumbai Suburban
Filed coordinates, straight-line distance. 447 registered projects within 2 km.
Shraddha Park City
Shraddha Prime Projects Limited
GREENAIRY
SAROJ LANDMARK REALTY LLP
Sky City Tower H
Incline Realty Private Limited
Sky City Tower G
Incline Realty Private Limited
SHEETAL REGALIA
D G S TOWNSHIP PRIVATE LIMITED
JANGID ELYSIUM
IMPRINT CONSTRUCTION PRIVATE LIMITED
See every Mumbai Suburban project, with the district possession charts
Builder: Sanghvi Premises Private Limited
Sanghvi Premises Private Limited has 8 registrations on MahaRERA, including Sanghvi Evana and SANGHVI SOLITAIRE. Its filings disclose 19 earlier MahaRERA projects: declares 1 of 18 past projects completed on time. Read the full track record. See more projects on the Mumbai Suburban district page.
Frequently asked questions
What are my rights if SANGHVI SOLITAIRE is delayed beyond 30 Jun 2026?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of SANGHVI SOLITAIRE?
The registered promoter entity is Sanghvi Premises Private Limited, a company as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in SANGHVI SOLITAIRE?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How do I read the complaint cases filed against SANGHVI SOLITAIRE?
Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.
How current is the construction progress shown for SANGHVI SOLITAIRE?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at SANGHVI SOLITAIRE?
The professionals named in the filing: Architect: Arcvishan Infratech Ltd; Engineer: Patel Kulkarni Consultants. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in SANGHVI SOLITAIRE?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback