ReraGenieLog inGet a buyer report

Home / Browse projects / Mumbai Suburban, Maharashtra / Sanghvi Pride

Registered No litigation declared Others project

Sanghvi Pride

By Sangvi Lifespace Private Limited

RG-MH-06989 · RERA P51800053635 · Last updated on MahaRERA portal: 21 Jul 2025

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form
  • All 1 earlier projects delivered on promise

Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against the promoter's 1 other registration.

See what the report covers Free either way: or have every new Mumbai Suburban registration emailed to you, free during the pilot beta.
Dec 2030Possession promisedno revision filed
6 of 22Construction stages doneacross 2 buildings; furthest along: Podiums (if any), 0%
0Complaints at MahaRERAon this registration
Jump to the 56 documents Report an error

Sanghvi Pride is a Others project by Sangvi Lifespace Private Limited in Mumbai Suburban, Maharashtra, registered with MahaRERA as P51800053635 on 21 Nov 2023. Possession is promised by 31 Dec 2030.

At a glance

Project

  • NameSanghvi Pride
  • TypeOthers
  • Location
    • Hari Shankar Joshi Road
    • Dahisar
    • Borivali
    • Mumbai Suburban
    • 400068
  • Pincode400068
  • RERA no.P51800053635
  • ReraGenie IDRG-MH-06989

Builder

  • NameSangvi Lifespace Private Limited
  • Entity typeCompany
  • DirectorsRakesh Sankalchand Sanghvi, Shikhar Rakesh Sanghvi
  • Other registrations1 more →
  • Declared earlier projects1 →

Key dates

this monthRegisteredNov 2023PromisedDec 2030

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on21 Nov 2023
  • Promised completion31 Dec 2030
  • Revised completionNone
  • Buildings2 building records
  • Documents filed56 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
A - WingNA00000
B - WingNA00000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building2

As on 21 Jul 2025, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

6 of 22 construction stages are filed complete across 2 buildings. The stage furthest along is Podiums (if any), at 0%.

A - Wing27%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
B - Wing27%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 21 Jul 2025, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes0%
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalYes0%
Water conservation /Rain water harvestingYes0%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Land and ownership1

MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area2,718 sq m
Land owned byThe promoter, with other names on the file
Named landowners1
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on27 Sep 2024
LandownerVillageDistrict
Adarsh Dahisar Gaurav Co-op. Hsg. Soc. Ltd.DahisarMumbai Suburban

Approvals and building plan

Sanctioning authorityMCGM
Permissible FSI10200.0
Buildings approved2
Buildings sanctioned2

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchShop No 16 Ground Floor LBS CTS Road Junction BKC Annex, Kurla West, Mumbai 400070

Certifying professionals and partners6

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectChirag S Rayani
EngineerAniket Chauhan
EngineerShailesh Ashok Raul
Chartered AccountantAgarwal Amit K & Company Chartered Accountants
Chartered AccountantR A N K & Associates
Chartered AccountantR A N K & Associates LLP
PartnerRole in project
Sangvi Lifespace Private Limited-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 2 Nov 2023
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 2 Nov 2023
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 2 Nov 2023
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 2 Nov 2023Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Dec 2030

Documents filed56

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Form 1File: Pride Form 1 31032025_compressed.pdf21 Jul 2025
Form 2File: Form - 2 - Pride _ 31032025_compressed.pdf21 Jul 2025
Disclosure of Sold and Booked InventoryFile: Disclousure of sold_31032025 pride_compressed.pdf21 Jul 2025
Form 3File: Form 3_Sanghvi Pride as on 31 03 2025 signed.pdf21 Jul 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: form 3_sanghvi pride_dec 24.pdf27 Feb 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2_Sep 24_Com.pdf24 Feb 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2_Q3 of FY 24-25.pdf24 Feb 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1_DEC 2024.pdf24 Jan 2025
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Form 5 FY 23-24_Sanghvi Pride.pdf2 Jan 2025
Disclosure of sold/ booked inventoryFile: DOS_Q3 FY 223-24_11zon.pdf8 Nov 2024
Disclosure of sold/ booked inventoryFile: DOS_Q1_11zon.pdf8 Nov 2024
Disclosure of sold/ booked inventoryFile: DOS_Q2_11zon.pdf8 Nov 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1_Q3 of FY 23-24.pdf29 Oct 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1_Mar 24.pdf29 Oct 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1_June 24.pdf29 Oct 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1_Sep 24.pdf29 Oct 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3_Dec 23_Com.pdf29 Oct 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3_Mar 24_Com.pdf29 Oct 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3_Jun 24_Signed_Com.pdf29 Oct 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3_Q2 of FY 24-25_Com.pdf29 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2_Sep 24_Com.pdf29 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2_June 24_11zon.pdf29 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2_Mar 24_Comp.pdf29 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2_Q3 of FY 23-24_Com.pdf29 Oct 2024
Disclosure of sold/ booked inventoryFile: Sanghvi Pride Disclosure of sold unsold as on 31032024.pdf19 Jun 2024
Other - LegalFile: Self declaration_Non applicability of quarterly update.pdf29 Jan 2024
Other - FinanceFile: Self declaration_Non applicability of quarterly update.pdf29 Jan 2024
Other - TechnicalFile: Self declaration_Non applicability of quarterly update.pdf29 Jan 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: Nilesh Rolekar.pdf4 Nov 2023
Other - LegalFile: Nilesh Rolekar.pdf4 Nov 2023
Other - FinanceFile: Nilesh Rolekar.pdf4 Nov 2023
Other - TechnicalFile: Nilesh Rolekar.pdf4 Nov 2023
Layout approvalFile: 1 Copy of Layout Approval (in case of layout).pdf2 Nov 2023
Building plan approvalFile: 1 Building Plan Approval _ NA Order for plotted development.pdf2 Nov 2023
PAN CardFile: 1 PAN Card.pdf2 Nov 2023
Copy of the legal title reportFile: 1 Copy of the legal title report.pdf2 Nov 2023
Details of encumbrances concerned to FinanceFile: Non-Encumbrance Certificate finance_v1.pdf2 Nov 2023
Details of encumbrances concerned to FinanceFile: Non-Encumbrance Certificate legal_v1.pdf2 Nov 2023
Details of encumbrances concerned to LegalFile: Non-Encumbrance Certificate finance_v1.pdf2 Nov 2023
Details of encumbrances concerned to LegalFile: Non-Encumbrance Certificate legal_v1.pdf2 Nov 2023
Copy of Layout Approval (in case of layout)File: 1 Copy of Layout Approval (in case of layout).pdf2 Nov 2023
Building Plan Approval / NA Order for plotted developmentFile: 1 Building Plan Approval _ NA Order for plotted development.pdf2 Nov 2023
Commencement Certificates / NA Order for plotted developmentFile: 1 Commencement Certificates _ NA Order for plotted development.pdf2 Nov 2023
Declaration about Commencement CertificateFile: Format D - Declaration on CC_new_V1.pdf2 Nov 2023
Declaration in FORM BFile: Form B - Affidavit_Promoter_v1.pdf2 Nov 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1_Architect’s Certificate of Percentage of Completion of Work.pdf2 Nov 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form_2_Sanghvi Pride_V1.pdf2 Nov 2023
CERSAI detailsFile: Undertaking for no lien_CERSAI_v1.pdf2 Nov 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3.pdf2 Nov 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: Disclosure of interest in other real estate organizations_RKS_v1.pdf2 Nov 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: Disclosure of interest in other real estate organizations_RRS_v1.pdf2 Nov 2023
Proforma of Agreement for saleFile: Adarsh - Agreement For Sale_V5.pdf2 Nov 2023
Proforma of Allotment letterFile: 1 Proforma of Allotment letter.pdf2 Nov 2023
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Declaration About Seperate Account.pdf2 Nov 2023
Deviation Report with respect to Allotment letterFile: Undertaking no deviation Allotment letter.pdf2 Nov 2023
Deviation Report with respect to model copy of AgreementFile: AFS_Deviation Report_v5.pdf2 Nov 2023

Promoter's earlier projects1

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

1 delivered on promise
ProjectLocationFlatsStatusPromisedDelivered
Sanghvi EdgeCTS No 1 as per PR Card and CTS No 2 by 6 as per DP Remarks at Andheri Mumbai Suburban 400055137OngoingDec 2026Dec 2026

How this compares with Mumbai Suburban

33%of Mumbai Suburban projects moved their completion datethis one has not
21%of Mumbai Suburban registrations have lapsed or been cancelledthis one is on the register

Computed across the 6,700+ Mumbai Suburban projects on ReraGenie, from their own filings.

Free monthly report: Mumbai on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep Sanghvi Pride on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Dahisar6,700+ in Mumbai Suburban

Builder: Sangvi Lifespace Private Limited

Sangvi Lifespace Private Limited has 2 registrations on MahaRERA, including Sanghvi Edge and Sanghvi Pride. Its filings disclose 1 earlier MahaRERA project: declares 1 of 1 past projects completed on time. Read the full track record. See more projects on the Mumbai Suburban district page.

Frequently asked questions

What are my rights if Sanghvi Pride is delayed beyond 31 Dec 2030?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Sanghvi Pride?

The registered promoter entity is Sangvi Lifespace Private Limited, a company as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Sanghvi Pride?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for Sanghvi Pride?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Sanghvi Pride?

The professionals named in the filing: Architect: Chirag S Rayani; Engineer: Aniket Chauhan; Engineer: Shailesh Ashok Raul; Chartered Accountant: Agarwal Amit K & Company Chartered Accountants; Chartered Accountant: R A N K & Associates; Chartered Accountant: R A N K & Associates LLP. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Sanghvi Pride?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Sanghvi Pride. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Sanghvi Pride to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.