Home / Browse projects / Nagpur, Maharashtra / SANGAM

Registered No litigation declared Residential / Group Housing project

SANGAM

By KAILAS DEONATHJI GURAO AND RAJENDRA VINAYAK BAHE

RG-MH-76588 · RERA P50500052334 · Last updated on MahaRERA portal: 19 Apr 2026

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form

Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against every project registered within 2 km.

See what the report covers Free either way: or have every new Nagpur registration emailed to you, free during the pilot beta.
Dec 2027Possession promisedno revision filed
3 of 22Construction stages doneacross 2 buildings; furthest along: Stilt Floor, 10%
56 of 56Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 67 documents Report an error

SANGAM is a Residential / Group Housing project by KAILAS DEONATHJI GURAO AND RAJENDRA VINAYAK BAHE in Nagpur, Maharashtra, registered with MahaRERA as P50500052334 on 14 Aug 2023. Possession is promised by 31 Dec 2027. 0 of the 56 units on this registration are recorded sold or booked, and 3 of 22 construction stages are filed complete.

At a glance

Project

  • NameSANGAM
  • TypeResidential / Group Housing
  • Location
    • KALMESHWAR
    • Kalmeshwar (MCL)
    • Kalameshwar
    • Nagpur
    • 441501
  • Pincode441501
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P50500052334
  • ReraGenie IDRG-MH-76588

Builder

  • NameKAILAS DEONATHJI GURAO AND RAJENDRA VINAYAK BAHE
  • Entity typeOthers
  • Named personsKAILAS DEONATHJI GURAO, RAJENDRA VINAYAK BAHE

Key dates

this monthRegisteredAug 2023PromisedDec 2027

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on14 Aug 2023
  • Promised completion31 Dec 2027
  • Revised completionNone
  • Buildings2 building records
  • Documents filed67 files

Current status

0%0 of 56 units booked

Figures as on 19 Apr 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
SANGAM- WING ANA8728028
SANGAM- WING BNA8728028

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building2

As on 19 Apr 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

3 of 22 construction stages are filed complete across 2 buildings. The stage furthest along is Stilt Floor, at 10%.

SANGAM- WING A0%
ActivityProgress
Excavation2%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
SANGAM- WING B28%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor10%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 19 Apr 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes2%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes15%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes0%
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalYes0%
Water conservation /Rain water harvestingYes1%
Energy managemcntYes0%
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Parking filed2

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots2
Closed/Covered2
BuildingClosed/CoveredTotal
SANGAM- WING A11
SANGAM- WING B11

Land and ownership

MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area1,638 sq m
Land owned byThe promoter
Named landownersNone

Approvals and building plan

Sanctioning authorityKALMESHWAR MUNICIPAL COUNCIL
Permissible FSI5096.7
Proposed, not sanctioned4,311 sq m
Buildings approved2
Buildings sanctioned2

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchABHAYANKAR ROAD, DHANTOLI, NAGPUR- 440012

Certifying professionals and partners3

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectCHANDRASHEKHAR GIRIPUNJE GIRIPUNJE
EngineerKAMAL SAHU
Chartered AccountantCA ANKIT TALREJA
PartnerRole in project
KAILAS DEONATHJI GURAO AND RAJENDRA VINAYAK BAHE-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 4 Aug 2023
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 16 Jul 2023
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 20 Jul 2023
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 16 Jul 2023Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Dec 2027

Documents filed67

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: Form 1 Sangam June 24_.pdf19 Apr 2026
Withdrawal Update Form 2File: Form 2 Sangam March-24.pdf19 Apr 2026
Withdrawal Update Form 3File: FORM 3 Sangam_Mar-24.pdf19 Apr 2026
Withdrawal Update Form 1File: Form 1 Sangam June 24_.pdf23 Jan 2026
Withdrawal Update Form 1File: Form 1 Sangam June 24_.pdf23 Jan 2026
Withdrawal Update Form 1File: Form 1 Sangam June 24_.pdf23 Jan 2026
Withdrawal Update Form 2File: Form 2 Sangam March-24.pdf23 Jan 2026
Withdrawal Update Form 2File: Form 2 Sangam March-24.pdf23 Jan 2026
Withdrawal Update Form 2File: Form 2 Sangam March-24.pdf23 Jan 2026
Withdrawal Update Form 3File: FORM 3 Sangam_Mar-24.pdf23 Jan 2026
Withdrawal Update Form 3File: FORM 3 Sangam_Mar-24.pdf23 Jan 2026
Withdrawal Update Form 3File: FORM 3 Sangam_Mar-24.pdf23 Jan 2026
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Sangam.pdf23 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Sangam.pdf23 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Sangam.pdf23 Apr 2025
Disclosure of sold/ booked inventoryFile: Sold Sangam.pdf23 Apr 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Sangam_Dec-2024.pdf1 Feb 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM -1_.pdf7 Dec 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Form 5 Sangam.pdf6 Dec 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Sangam June 24_.pdf24 Jul 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Sangam Sep -23.pdf20 May 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Sangam Dec -23.pdf20 May 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Sangam March-24.pdf20 May 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Form 2A Sangam March-24.pdf20 May 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Form 2A Sangam March-24.pdf20 May 2024
Disclosure of sold/ booked inventoryFile: SEP-23.pdf15 May 2024
Disclosure of sold/ booked inventoryFile: DEC-23.pdf15 May 2024
Disclosure of sold/ booked inventoryFile: MAR-24.pdf15 May 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 Sangam_Sep-23.pdf15 May 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 Sangam_Dec-23.pdf15 May 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 Sangam_Dec-23.pdf15 May 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 Sangam_Mar-24.pdf15 May 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Sangam March 24.pdf25 Apr 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1.pdf22 Apr 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 1.pdf22 Apr 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: SANGAM_Form-1- Architect Certificate_Sep-23.pdf21 Jan 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: SANGAM_Form-1- Architect Certificate_Dec-23.pdf21 Jan 2024
Copy of the legal title reportFile: Search Report - SANGAM.pdf4 Aug 2023
Declaration about Commencement CertificateFile: form d_Sangam.pdf29 Jul 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: form-3_Sangam.pdf29 Jul 2023
Proforma of Allotment letterFile: Allotment Letter _3 Sangam.pdf29 Jul 2023
Other - LegalFile: DECLARATION-final.pdf29 Jul 2023
Other - FinanceFile: DECLARATION-final.pdf29 Jul 2023
Other - TechnicalFile: DECLARATION-final.pdf29 Jul 2023
Proforma of Agreement for saleFile: ATS_ Sangam.pdf23 Jul 2023
Building plan approvalFile: FINAL BUILDING PLANS KALMESHWAR-1.pdf20 Jul 2023
Building Plan Approval / NA Order for plotted developmentFile: FINAL BUILDING PLANS KALMESHWAR-1.pdf20 Jul 2023
CERSAI detailsFile: CERSAI_Search_Report_200274898503_For_Asset_Based_Search_19_07_2023_22_39_33_599 (1).pdf20 Jul 2023
PAN CardFile: PAN CARD_Kailas Gurao.pdf19 Jul 2023
PAN CardFile: PAN CARD_Bahe.pdf19 Jul 2023
Layout approvalFile: FINAL BUILDING PLANS KALMESHWAR-3.pdf16 Jul 2023
Building plan approvalFile: FINAL BUILDING PLANS KALMESHWAR-3.pdf16 Jul 2023
Building plan approvalFile: FINAL BUILDING PLANS KALMESHWAR-2.pdf16 Jul 2023
Details of encumbrances concerned to FinanceFile: ENCUM_FInance_Sangam.pdf16 Jul 2023
Details of encumbrances concerned to FinanceFile: ENCUM_Legal_Sangam.pdf16 Jul 2023
Details of encumbrances concerned to LegalFile: ENCUM_FInance_Sangam.pdf16 Jul 2023
Details of encumbrances concerned to LegalFile: ENCUM_Legal_Sangam.pdf16 Jul 2023
Copy of Layout Approval (in case of layout)File: FINAL BUILDING PLANS KALMESHWAR-3.pdf16 Jul 2023
Building Plan Approval / NA Order for plotted developmentFile: FINAL BUILDING PLANS KALMESHWAR-3.pdf16 Jul 2023
Building Plan Approval / NA Order for plotted developmentFile: FINAL BUILDING PLANS KALMESHWAR-2.pdf16 Jul 2023
Commencement Certificates / NA Order for plotted developmentFile: FINAL CERTIFICATE KALMESHWAR.pdf16 Jul 2023
Declaration in FORM BFile: Form B_Sangam.pdf16 Jul 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: Intreest Declaration -Kailas Gurao.pdf16 Jul 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: Intreest Declaration -Rajendra Bahe.pdf16 Jul 2023
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Bank Account Disclosure_Prepared_Sangam.pdf16 Jul 2023
Deviation Report with respect to Allotment letterFile: Deviation Report - ALLOTMENT LETTER _Sangam.pdf16 Jul 2023
Deviation Report with respect to model copy of AgreementFile: DEVIATION REPORT_ATS -Sangam.pdf16 Jul 2023

How this compares with Nagpur

0%of this project is bookeddistrict median 35%
13%of Nagpur projects moved their completion datethis one has not
22%of Nagpur registrations have lapsed or been cancelledthis one is on the register

Computed across the 2,800+ Nagpur projects on ReraGenie, from their own filings.

Free monthly report: Nagpur on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep SANGAM on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near KALMESHWAR2,800+ in Nagpur

2 kmSANGAMCompleted 2Other 3Dot size: filed unitsN

Filed coordinates, straight-line distance. 5 registered projects within 2 km.

Builder: KAILAS DEONATHJI GURAO AND RAJENDRA VINAYAK BAHE

KAILAS DEONATHJI GURAO AND RAJENDRA VINAYAK BAHE has 1 registration on MahaRERA, including SANGAM. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Nagpur district page.

Frequently asked questions

What are my rights if SANGAM is delayed beyond 31 Dec 2027?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of SANGAM?

The registered promoter entity is KAILAS DEONATHJI GURAO AND RAJENDRA VINAYAK BAHE, an others as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in SANGAM?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for SANGAM?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at SANGAM?

The professionals named in the filing: Architect: CHANDRASHEKHAR GIRIPUNJE GIRIPUNJE; Engineer: KAMAL SAHU; Chartered Accountant: CA ANKIT TALREJA. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in SANGAM?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About SANGAM. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save SANGAM to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.