Home / Browse projects / Pune, Maharashtra / SAMRAT SARTHAK

Completed No litigation declared Residential / Group Housing project

SAMRAT SARTHAK

By BORA REALTY LLP

RG-MH-14574 · RERA P52100023095 · Last updated on MahaRERA portal: 6 Jul 2024

Source: official MahaRERA filing

Red flags

  • 1 complaint at MahaRERA

Clear

  • No litigation declared
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form
  • Recorded completed on MahaRERA

1 condition is on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.
Feb 2025Possession promisedregistration recorded completed
10 of 11Construction stages donefurthest along: Stilt Floor, 0%
1Complaints at MahaRERAon this registration
Jump to the 77 documents Report an error

SAMRAT SARTHAK is a Residential / Group Housing project by BORA REALTY LLP in Pune, Maharashtra, registered with MahaRERA as P52100023095 on 29 Nov 2019. The registration is recorded completed; possession was promised by 28 Feb 2025. 1 complaint is on record with the regulator.

At a glance

Project

  • NameSAMRAT SARTHAK
  • TypeResidential / Group Housing
  • Location
    • PUNE SATARA ROAD
    • 411046
    • Katraj
    • Haveli
    • Pune
  • Pincode411046
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P52100023095
  • ReraGenie IDRG-MH-14574

Builder

  • NameBORA REALTY LLP
  • Entity typePartnership
  • PartnersSAGAR TEJMAL MANDLECHA, HITESH KISHOR NAWALAKHA, RAJENDRA KESHARCHAND BORA
  • Other registrations1 more →
  • Completed1 of 2
  • No longer live1 lapsed, de-registered or revoked
  • Declared earlier projects1 →

Key dates

this monthRegisteredNov 2019PromisedFeb 2025Recorded completed

Key facts

Registration and timeline

  • StatusCompleted
  • Registered on29 Nov 2019
  • Promised completion28 Feb 2025
  • Revised completionNone
  • Buildings1 building record
  • Documents filed77 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Wing A and Wing BNA140000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 6 Jul 2024, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

10 of 11 construction stages are filed complete. The stage furthest along is Stilt Floor, at 0%.

Wing A and Wing B: 91% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Progress on shared amenities15

As on 6 Jul 2024, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes100%
Water SupplyYes100%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsYes100%
Landscaping & Tree PlantingYes100%
Street LightingYes100%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterYes100%
Solid Waste Management And DisposalYes100%
Water conservation /Rain water harvestingYes100%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes100%
Electrical meter room, sub-station, receiving stationYes100%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingYes100%

Parking filed184

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots184
Closed/Covered184

Land and ownership

MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area4,000 sq m
Land owned byThe promoter
Named landownersNone

Approvals and building plan

Permissible FSI10500.0
Proposed, not sanctioned3,912 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchOSWAL BANDHU SAMAJ BUILDING SEVEN LOVES CHOWK SHANKER SHETH ROAD PUNE 411037

Certifying professionals and partners3

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectJAIDEEP DESHPANDE
EngineerHANUMANT VITHOBA JAMADAR
Chartered AccountantKAVITA TATIYA
PartnerRole in project
BORA REALTY LLP-

Complaints filed with MahaRERA1

Case no.ComplainantRespondentFiled
CC005000000471216Jaywant Maniklal ChavanM/s Bora realty LLP06/07/2024

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 6 Jul 2024
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 4 Jul 2024
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 26 Aug 2021
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 22 Jul 2022Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateOn the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    uploaded 14 Feb 2024

Documents filed77

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Copy of the legal title reportFile: TITLE REPORT RERA FORMAT Annexure A.pdf6 Jul 2024
Copy of the legal title reportFile: TITLE OPINION DTD 222023 1.pdf6 Jul 2024
Layout approvalFile: Sanction Plan.pdf4 Jul 2024
Copy of Layout Approval (in case of layout)File: Sanction Plan.pdf4 Jul 2024
Architect’s Certificate on Completion of Project (Form 4)File: Form 4 Samrat Sarthak MahaRERA.pdf4 Jul 2024
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: Full Occupancy Certificate 2024.pdf14 Feb 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Form 5 samrat sarthak 22-23.pdf13 Oct 2023
Disclosure of sold/ booked inventoryFile: A wing sold unsold inventory 11 Oct 23.pdf11 Oct 2023
Disclosure of sold/ booked inventoryFile: B wing sold unsold inventory 11 Oct 23.pdf11 Oct 2023
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: Occupany Certificate -B wing.pdf11 Oct 2023
Disclosure of sold/ booked inventoryFile: A wing 29623 Booked unsold inventory.pdf29 Jun 2023
Disclosure of sold/ booked inventoryFile: B wing 29623 Booked unsold inventory.pdf29 Jun 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: Declaration Katraj PRoject.pdf15 May 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: quality assurance.pdf5 May 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: BRLLP Katraj Form 5 FY 2019-20.pdf5 May 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: Annual Audit Report of Statutory CA (Form 5) (FY 2021-22).pdf25 Apr 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Work completion letter A wing.pdf20 Apr 2023
Disclosure of sold/ booked inventoryFile: Booked sold inventory.pdf20 Apr 2023
Disclosure of sold/ booked inventoryFile: B wing.pdf20 Apr 2023
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: Occupany Certificate -A wing.pdf14 Jan 2023
Commencement Certificates / NA Order for plotted developmentFile: Commencement Certificate 2022.pdf22 Jul 2022
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: IMG.pdf22 Jul 2022
Engineers Certificate on Quality Assurance (Form 2A)File: quality assurance.pdf14 Jul 2022
Disclosure of sold/ booked inventoryFile: Unsold inventory Rera.pdf14 Jul 2022
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect certificate rera.pdf3 Jun 2022
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: form 3 samrat sarthak Bora realty llp_compressed (1).pdf22 Apr 2022
Copy of the legal title reportFile: TITLE REPORT RERA FORMAT.pdf15 Mar 2022
Copy of the legal title reportFile: TITLE OPINION.pdf15 Mar 2022
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: FORM 2A.pdf16 Dec 2021
CERSAI detailsFile: CERSAI_Search_Report.pdf13 Dec 2021
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: Form 5.pdf13 Dec 2021
Building plan approvalFile: sanction copy 2020_1.pdf26 Aug 2021
Building plan approvalFile: sanction copy 2020_2.pdf26 Aug 2021
Building plan approvalFile: sanction copy 2020_3.pdf26 Aug 2021
Building plan approvalFile: sanction copy 2021-1.pdf26 Aug 2021
Building plan approvalFile: sanction copy 2021-2.pdf26 Aug 2021
Building plan approvalFile: sanction copy 2021-3.pdf26 Aug 2021
Copy of the legal title reportFile: search title report.pdf26 Aug 2021
Building Plan Approval / NA Order for plotted developmentFile: sanction copy 2020_1.pdf26 Aug 2021
Building Plan Approval / NA Order for plotted developmentFile: sanction copy 2020_2.pdf26 Aug 2021
Building Plan Approval / NA Order for plotted developmentFile: sanction copy 2020_3.pdf26 Aug 2021
Building Plan Approval / NA Order for plotted developmentFile: sanction copy 2021-1.pdf26 Aug 2021
Building Plan Approval / NA Order for plotted developmentFile: sanction copy 2021-2.pdf26 Aug 2021
Building Plan Approval / NA Order for plotted developmentFile: sanction copy 2021-3.pdf26 Aug 2021
Commencement Certificates / NA Order for plotted developmentFile: Commencement certificate 2021-compressed.pdf23 Aug 2021
Declaration about Commencement CertificateFile: Commencement certificate 2021-compressed.pdf23 Aug 2021
Proforma of Allotment letterFile: BORA REALITY KATRAJ - AGREEMENT BLANK FORMAT.pdf23 Aug 2021
Building plan approvalFile: parking sanction 3,3 2021_1.pdf18 Jun 2021
Building plan approvalFile: sanction copy 2021_1.pdf18 Jun 2021
Building Plan Approval / NA Order for plotted developmentFile: parking sanction 3,3 2021_1.pdf18 Jun 2021
Building Plan Approval / NA Order for plotted developmentFile: sanction copy 2021_1.pdf18 Jun 2021
Commencement Certificates / NA Order for plotted developmentFile: Commencement certificate 2021-compressed.pdf18 Jun 2021
Disclosure of sold/ booked inventoryFile: disclosure of sold booked inventory building wise_1 24-5-21.pdf24 May 2021
Layout approvalFile: katraj plot layout_compressed.pdf9 Nov 2019
Layout approvalFile: layout approval letter katraj_compressed.pdf9 Nov 2019
Building plan approvalFile: sanction drawing 28-3-19 sheet 1 of 4_compressed.pdf9 Nov 2019
Building plan approvalFile: sanction drawing 28-3-19 sheet 2 of 4_compressed.pdf9 Nov 2019
Building plan approvalFile: sanction drawing 28-3-19 sheet 3 of 4_compressed.pdf9 Nov 2019
Building plan approvalFile: sanction drawing 28-3-19 sheet 4 of 4_compressed.pdf9 Nov 2019
Copy of Layout Approval (in case of layout)File: katraj plot layout_compressed.pdf9 Nov 2019
Copy of Layout Approval (in case of layout)File: layout approval letter katraj_compressed.pdf9 Nov 2019
Building Plan Approval / NA Order for plotted developmentFile: sanction drawing 28-3-19 sheet 1 of 4_compressed.pdf9 Nov 2019
Building Plan Approval / NA Order for plotted developmentFile: sanction drawing 28-3-19 sheet 2 of 4_compressed.pdf9 Nov 2019
Building Plan Approval / NA Order for plotted developmentFile: sanction drawing 28-3-19 sheet 3 of 4_compressed.pdf9 Nov 2019
Building Plan Approval / NA Order for plotted developmentFile: sanction drawing 28-3-19 sheet 4 of 4_compressed.pdf9 Nov 2019
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 KATRAJ PROJECT.pdf2 Nov 2019
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3A KATRAJ PROJECT.pdf2 Nov 2019
Copy of the legal title reportFile: Title Report dated 27-11-2019_compressed.pdf31 Oct 2019
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 ENGINEERS CERTIFICATE.pdf31 Oct 2019
Engineers Certificate on Quality Assurance (Form 2A)File: FORM 2A ENGINEERS CERTIFICATE.pdf31 Oct 2019
Proforma of Allotment letterFile: PERFORMA AGREEMENT TO SALE AND ALLOTMENT LETTER.pdf31 Oct 2019
Proforma of Allotment letterFile: performa of allotment letter katraj.pdf31 Oct 2019
Declaration in FORM BFile: FORM B COMPRESSED affidavit cum decleration katraj 16-10-19-.pdf18 Oct 2019
Details of encumbrancesFile: self declaration 15-10-19.pdf15 Oct 2019
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM-1 ARCHITECT CERTIFICATE 15-10-2019.pdf15 Oct 2019
PAN CardFile: brllp pan.pdf7 Oct 2019
Commencement Certificates / NA Order for plotted developmentFile: katraj site commencement 28-3-2019 11.pdf7 Oct 2019

Promoter's earlier projects1

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

1 delivered late
ProjectLocationFlatsStatusPromisedDelivered
SAMRAT SWASTIKs.no 152 hadapsar72CompletedJan 2009Late, Feb 2009

How this compares with Pune

26%of Pune projects moved their completion datethis one has not
26%of Pune registrations have lapsed or been cancelledthis one is completed

Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.

Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep SAMRAT SARTHAK on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near 41104613,700+ in Pune

2 kmSAMRAT SARTHAKCompleted 55Lapsed / revoked 29Other 39Dot size: filed unitsN

Filed coordinates, straight-line distance. 123 registered projects within 2 km.

Builder: BORA REALTY LLP

BORA REALTY LLP has 2 registrations on MahaRERA, including LOTUS CAPITAL and SAMRAT SARTHAK. Its filings disclose 1 earlier MahaRERA project: declares 0 of 1 past projects completed on time. Read the full track record. See more projects on the Pune district page.

Frequently asked questions

What are my rights if SAMRAT SARTHAK is delayed beyond 28 Feb 2025?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of SAMRAT SARTHAK?

The registered promoter entity is BORA REALTY LLP, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in SAMRAT SARTHAK?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How do I read the complaint cases filed against SAMRAT SARTHAK?

Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.

How current is the construction progress shown for SAMRAT SARTHAK?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at SAMRAT SARTHAK?

The professionals named in the filing: Architect: JAIDEEP DESHPANDE; Engineer: HANUMANT VITHOBA JAMADAR; Chartered Accountant: KAVITA TATIYA. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in SAMRAT SARTHAK?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About SAMRAT SARTHAK. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save SAMRAT SARTHAK to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.