Completed No litigation declared Others project

SAMARTH RESIDENCY

By SHIVSAMARTH DEVELOPERS

RG-MH-68849 · RERA P52100049691 · Last updated on MahaRERA portal: 1 Oct 2025

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form
  • Recorded completed on MahaRERA

Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against every project registered within 2 km.

See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.
Dec 2025Possession promisedregistration recorded completed
9 of 11Construction stages donefurthest along: Podiums (if any), 0%
23 of 45Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 64 documents Report an error

SAMARTH RESIDENCY is a Others project by SHIVSAMARTH DEVELOPERS in Pune, Maharashtra, registered with MahaRERA as P52100049691 on 22 Feb 2023. The registration is recorded completed; possession was promised by 31 Dec 2025. 22 of the 45 units on this registration are recorded sold or booked, and 9 of 11 construction stages are filed complete.

At a glance

Project

  • NameSAMARTH RESIDENCY
  • TypeOthers
  • Location
    • ALANDI KHED
    • Alandi (M Cl)
    • Khed
    • Pune
    • 412105
  • Pincode412105
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P52100049691
  • ReraGenie IDRG-MH-68849

Builder

  • NameSHIVSAMARTH DEVELOPERS
  • Entity typePartnership
  • GSTIN27AEWFS0128M1ZE
  • PartnerRAHUL NARAYAN BHALERAO
  • PartnerDeepak Maruti Thorat

Key dates

this monthRegisteredFeb 2023PromisedDec 2025Recorded completed

Key facts

Registration and timeline

  • StatusCompleted
  • Registered on22 Feb 2023
  • Promised completion31 Dec 2025
  • Revised completionNone
  • Buildings1 building record
  • Documents filed64 files

Current status

49%22 of 45 units booked

Figures as on 1 Oct 2025, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
SAMARTH RESIDENCYNA8742345

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 1 Oct 2025, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

9 of 11 construction stages are filed complete. The stage furthest along is Podiums (if any), at 0%.

SAMARTH RESIDENCY: 82% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Progress on shared amenities15

As on 1 Oct 2025, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes100%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsYes100%
Landscaping & Tree PlantingYes100%
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingNoNot applicable
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsNoNot applicable
Electrical meter room, sub-station, receiving stationYes100%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Parking filed63

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots63
Closed/Covered21
Open Space42

Land and ownership4

MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area825 sq m
Land owned byThe promoter, with other names on the file
Named landowners4
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on13 Jun 2025
LandownerVillageDistrict
DEEPAK KESHAV VARKHADEPune (M Corp.)Pune
ASHOK KESHAV WARKHADEPune (M Corp.)Pune
NANDINI H THITEPune (M Corp.)Pune
AJIT KESHAVRAO VARKHADEPune (M Corp.)Pune

Approvals and building plan

Sanctioning authorityAlandi Municipal Council Office
Permissible FSI3550.11
Proposed, not sanctioned2,450 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchALANDI DEVACHI

Certifying professionals and partners5

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectSK ASSOCIATES
EngineerALN ENGINEERS & ASSOCIATES
Chartered AccountantPGMJ AND ASSOCIATES
Chartered AccountantA S JANGADA & ASSOCIATES
Chartered AccountantNITISH VAIDYA & ASSOCIATES
PartnerRole in project
SHIVSAMARTH DEVELOPERS-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 15 Feb 2023
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 10 Feb 2023
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 8 Feb 2023
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 8 Feb 2023Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot on the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

Documents filed64

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Occupational CertificateFile: Completion Certificate.pdf1 Oct 2025
Form 5 (FY 2024-2025)File: Form 5 Final.pdf30 Sep 2025
Form 1File: Form 1.pdf20 Jul 2025
Form 2File: Form 2 Final.pdf20 Jul 2025
Form 3File: Form 3 Final.pdf20 Jul 2025
Disclosure of Sold and Booked InventoryFile: Sold Circular.pdf20 Jul 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1.pdf19 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Final.pdf19 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Final.pdf19 Apr 2025
Disclosure of sold/ booked inventoryFile: Sold Circular.pdf19 Apr 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Final.pdf20 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Final_compressed.pdf20 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2.pdf20 Jan 2025
Disclosure of sold/ booked inventoryFile: Sold Circular.pdf20 Jan 2025
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Form 5 FY 2023-24.pdf9 Dec 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1.pdf18 Oct 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Uploaded.pdf18 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2.pdf18 Oct 2024
Disclosure of sold/ booked inventoryFile: Sold Circular 29.pdf18 Oct 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 Final.pdf10 Jul 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 Final.pdf10 Jul 2024
Disclosure of sold/ booked inventoryFile: Sold Circular 2024 jun.pdf10 Jul 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Final_compressed.pdf10 Jul 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1.pdf26 Apr 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2.pdf26 Apr 2024
Disclosure of sold/ booked inventoryFile: FINAL DISCLOSURE OF SOLD.pdf26 Apr 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Final Form 3_compressed.pdf26 Apr 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Final Form 1.pdf16 Jan 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2.pdf16 Jan 2024
Disclosure of sold/ booked inventoryFile: Sold Circular.pdf16 Jan 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Final Form 3_compressed.pdf16 Jan 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Form 5 Final.pdf27 Dec 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2.pdf19 Oct 2023
Disclosure of sold/ booked inventoryFile: Sold.pdf19 Oct 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Uploaded_compressed.pdf19 Oct 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1.pdf18 Oct 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architech cerificate_compressed.pdf17 Jul 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineers Certificate.pdf17 Jul 2023
Disclosure of sold/ booked inventoryFile: Sold circular.pdf17 Jul 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Confirmation_compressed.pdf17 Jul 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1- Architect Certificate for ongoing project .pdf3 May 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ALN.pdf3 May 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: ALN (1).pdf3 May 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 upload.pdf3 May 2023
Copy of the legal title reportFile: legal title report (1).pdf15 Feb 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: ANNEXURE A 02.pdf14 Feb 2023
Proforma of Agreement for saleFile: Agreement to sale draft.pdf14 Feb 2023
Layout approvalFile: UPLOAD LAYOUT PLAN FINAL.pdf10 Feb 2023
Copy of Layout Approval (in case of layout)File: UPLOAD LAYOUT PLAN FINAL.pdf10 Feb 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 UPLOAD.pdf10 Feb 2023
Building plan approvalFile: darwing 02.pdf8 Feb 2023
PAN CardFile: FIRM PAN.pdf8 Feb 2023
Details of encumbrances concerned to FinanceFile: Fiancialand Legal Encumbrances.pdf8 Feb 2023
Details of encumbrances concerned to LegalFile: Fiancialand Legal Encumbrances.pdf8 Feb 2023
Building Plan Approval / NA Order for plotted developmentFile: darwing 02.pdf8 Feb 2023
Commencement Certificates / NA Order for plotted developmentFile: COMMENCEMENT CERTIFICATE.pdf8 Feb 2023
Declaration about Commencement CertificateFile: Declaration About commencement certificate .pdf8 Feb 2023
Declaration in FORM BFile: Form B Promoter .pdf8 Feb 2023
CERSAI detailsFile: CERSAI_Search_Report_200259858034_For_Asset_Based_Search_08_02_2023_15_55_07_066.pdf8 Feb 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: Promoters Declaration.pdf8 Feb 2023
Proforma of Allotment letterFile: Model form of allotment letter.pdf8 Feb 2023
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Declaration of Separate Bank Account For real estate projects.pdf8 Feb 2023
Deviation Report with respect to Allotment letterFile: No deviation with respect to allotment letter .pdf8 Feb 2023
Deviation Report with respect to model copy of AgreementFile: No Deviation .pdf8 Feb 2023

How this compares with Pune

49%of this project is bookeddistrict median 31%
26%of Pune projects moved their completion datethis one has not
26%of Pune registrations have lapsed or been cancelledthis one is completed

Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.

Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep SAMARTH RESIDENCY on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near ALANDI KHED13,700+ in Pune

2 kmSAMARTH RESIDENCYCompleted 31Lapsed / revoked 19Other 24Dot size: filed unitsN

Filed coordinates, straight-line distance. 74 registered projects within 2 km.

Builder: SHIVSAMARTH DEVELOPERS

SHIVSAMARTH DEVELOPERS has 1 registration on MahaRERA, including SAMARTH RESIDENCY. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Pune district page.

Frequently asked questions

What are my rights if SAMARTH RESIDENCY is delayed beyond 31 Dec 2025?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of SAMARTH RESIDENCY?

The registered promoter entity is SHIVSAMARTH DEVELOPERS, a partnership as per the filing. Its GSTIN 27AEWFS0128M1ZE can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in SAMARTH RESIDENCY?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for SAMARTH RESIDENCY?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at SAMARTH RESIDENCY?

The professionals named in the filing: Architect: SK ASSOCIATES; Engineer: ALN ENGINEERS & ASSOCIATES; Chartered Accountant: PGMJ AND ASSOCIATES; Chartered Accountant: A S JANGADA & ASSOCIATES; Chartered Accountant: NITISH VAIDYA & ASSOCIATES. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in SAMARTH RESIDENCY?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About SAMARTH RESIDENCY. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save SAMARTH RESIDENCY to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.