Registration lapsed No litigation declared Residential / Group Housing project

Samarth Pride

By Samarth Pride

RG-MH-02727 · RERA P51500045981 · Last updated on MahaRERA portal: 3 Sep 2025

Source: official MahaRERA filing

Red flags

  • Registration lapsed
  • Possession 10 months past the filed date
  • Completion date moved by 11 months
  • 1 extension taken

Clear

  • No litigation declared
  • No complaints on record
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form

4 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Aurangabad registration emailed to you, free during the pilot beta.
Dec 2025Possession promised10 months past this date
15 of 44Construction stages doneacross 4 buildings; furthest along: Internal walls, 40%
0Complaints at MahaRERAon this registration
Jump to the 59 documents Report an error

Samarth Pride is a Residential / Group Housing project by Samarth Pride in Aurangabad, Maharashtra, registered with MahaRERA as P51500045981 on 15 Jun 2022. Possession was promised by 31 Dec 2025 and is now 10 months past that date. The completion date has moved by 11 months from the original filing.

At a glance

Project

  • NameSamarth Pride
  • TypeResidential / Group Housing
  • Location
    • Jalgaon Road
    • Near Visawa Hotel
    • Aurangabad (M Corp.)
    • Aurangabad
    • 431008
  • Pincode431008
  • RERA no.P51500045981
  • ReraGenie IDRG-MH-02727

Builder

  • NameSamarth Pride
  • Entity typePartnership
  • PartnerRaghunath Eknath Autade

Key dates

10 months past promisethis monthRegisteredJun 2022First promiseJan 2025Revised toDec 2025

Key facts

Registration and timeline

  • StatusRegistration lapsed
  • Registered on15 Jun 2022
  • Promised completion31 Dec 2025
  • Revised completionRevised to 31 Dec 2025 (originally 31 Jan 2025)
  • Buildings4 building records
  • Documents filed59 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Building ANA22000
Building BNA22000
Building CNA22000
Building DNA22000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building4

As on 3 Sep 2025, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

15 of 44 construction stages are filed complete across 4 buildings. The stage furthest along is Internal walls, at 40%.

Building A40%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises40%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Building B40%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises40%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Building C35%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure40%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises40%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Building D37%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises10%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 3 Sep 2025, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes0%
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsNoNot applicable
Landscaping & Tree PlantingYes0%
Street LightingYes0%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes0%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsNoNot applicable
Electrical meter room, sub-station, receiving stationNoNot applicable
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Land and ownership2

MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area2,850 sq m
Land owned byThe promoter, with other names on the file
Named landowners2
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on18 Dec 2025
LandownerVillageDistrict
Kiran Sunil DahihandeSawangiAurangabad
Jayshree Santosh DahihandeSawangiAurangabad

Approvals and building plan

Sanctioning authorityCIDCO
Permissible FSI2137.5
Proposed, not sanctioned2,138 sq m
Buildings approved4
Buildings sanctioned4

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchHudco Branch, Aurangabad-431003

Certifying professionals and partners4

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectDHANANJAY B DOIFODE
EngineerABHAY S PATIL
Chartered AccountantSHYAMKANT MAHADEVRAO BORDE
Chartered AccountantSUDHAKAR NANA AHER
PartnerRole in project
Samarth Pride-

Extensions applied for1

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EXT51500027789Jan 2025 → Dec 2025

Reason as filed by the promoter1) We are facing problem of no booking and delay in collection from customer's. If we force for payment the customers were cancelling bookings. We have applied for bankers but no banker is ready to finance. But with our own capital we have completed at most 80 pct of work as you can confirm from Form 1, 3 uploaded on portal. Now only 20 pct work is balance and in next 8/10 months we will defiantly finish the same. You are kindly requested to extend completion date up to 31/12/2025

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 18 May 2022
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 12 May 2022
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 12 May 2022
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 18 May 2022Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot on the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

Documents filed59

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Form 1File: Arch Form 01 SP38.pdf3 Sep 2025
Form 2File: Form02 Eng SP38.pdf3 Sep 2025
Form 3File: Form 3 CA SP38.pdf3 Sep 2025
Disclosure of Sold and Booked InventoryFile: Pride Sold unsold.pdf3 Sep 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Arch.pdf16 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Q4.pdf16 Apr 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Form 2A Samarth Pride.pdf16 Apr 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 ARCH June 2024.pdf3 Mar 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Arch June 22.pdf3 Mar 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 ARCH Dec 2024.pdf3 Mar 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 ARCH Sep 2024.pdf3 Mar 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 ARCH March 2024.pdf3 Mar 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Arch DT Dec 2023.pdf3 Mar 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 01 Arch Sep 2023.pdf3 Mar 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 ARCH June 2023.pdf3 Mar 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 ARCH March 2023.pdf3 Mar 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 ARCH DT Dec 2022.pdf3 Mar 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 ARCH Sep 2022.pdf3 Mar 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 CA Sep 2023.pdf3 Mar 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 CA Dec 2024.pdf3 Mar 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 CA Sept 2024.pdf3 Mar 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 CA DT June 2024.pdf3 Mar 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 CA March 2024.pdf3 Mar 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: form 3 CA Dec 2023.pdf3 Mar 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 CA June 2023.pdf3 Mar 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 CA March 2023.pdf3 Mar 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 CA Dec 2022.pdf3 Mar 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 CA Sep 2022.pdf3 Mar 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 CA June 2022.pdf3 Mar 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Engineer cert June 2022 samarth pride.pdf3 Mar 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Engineer Cert Sep 2022 Samarth pride.pdf3 Mar 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Engineer cert Dec 2022 samarth pride.pdf3 Mar 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 engineer cert March 2023 Samarth pride.pdf3 Mar 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 engineer cert June 2023 Samarth pride.pdf3 Mar 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Engineer Cert Sept 2023 Samarth pride.pdf3 Mar 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Engineer cert Dec 2023 Samarth pride.pdf3 Mar 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Engineer cert March 2024 samarth pride.pdf3 Mar 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Engineer cert June 2024 Samarth Pride.pdf3 Mar 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Engineer cert Sept 2024 samarth pride.pdf3 Mar 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 engineer cert Dec 2024 Samarth pride.pdf3 Mar 2025
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Form 5 Samarth Pride.pdf15 Mar 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: New Form 3pdf (1).pdf4 Jun 2022
Proforma of Allotment letterFile: ALLOTMENT LETTER format.pdf4 Jun 2022
Copy of the legal title reportFile: NEW SEARCH REPORT.pdf18 May 2022
Commencement Certificates / NA Order for plotted developmentFile: NA Order Collector SP38 Sawangi.pdf18 May 2022
CERSAI detailsFile: CERSAI_Search_Report_200237241540_For_Asset_Based_Search_12_05_2022_19_12_49_853.pdf18 May 2022
Layout approvalFile: Final Layout SP38 Sawangi 0.pdf12 May 2022
Building plan approvalFile: A AND B BUILDING PLAN.pdf12 May 2022
Building plan approvalFile: C TYPE BUILDING PLAN.pdf12 May 2022
Building plan approvalFile: D TYPE BUILDING PLAN.pdf12 May 2022
PAN CardFile: pan samarth pride.pdf12 May 2022
Details of encumbrancesFile: Non-Encumbrance Certificate.pdf12 May 2022
Copy of Layout Approval (in case of layout)File: Final Layout SP38 Sawangi 0.pdf12 May 2022
Building Plan Approval / NA Order for plotted developmentFile: A AND B BUILDING PLAN.pdf12 May 2022
Building Plan Approval / NA Order for plotted developmentFile: C TYPE BUILDING PLAN.pdf12 May 2022
Building Plan Approval / NA Order for plotted developmentFile: D TYPE BUILDING PLAN.pdf12 May 2022
Commencement Certificates / NA Order for plotted developmentFile: Building Permision.pdf12 May 2022
Declaration about Commencement CertificateFile: Format-D.pdf12 May 2022
Declaration in FORM BFile: Form B Dinesh Salunkhe Developers 0.pdf12 May 2022

How this compares with Aurangabad

14%of Aurangabad projects moved their completion datethis one moved by 11 months
32%of Aurangabad registrations have lapsed or been cancelledthis one is among them

Computed across the 1,400+ Aurangabad projects on ReraGenie, from their own filings.

Keep Samarth Pride on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Near Visawa Hotel1,400+ in Aurangabad

Builder: Samarth Pride

Samarth Pride has 1 registration on MahaRERA, including Samarth Pride. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Aurangabad district page.

Frequently asked questions

What does it mean that Samarth Pride shows as registration lapsed on MahaRERA?

A registration runs until the completion date the promoter declared. If the project is neither completed nor extended by then it lapses, and a de-registration or revocation ends it by order. In every case the promoter may no longer legally advertise, market or sell in the project, and the Authority can act under section 7 against a defaulting promoter. What it does not do is cancel an agreement for sale you have already signed, or extinguish your section 18 right to delay interest or refund; those run from your agreement, not from the registration. Get the current position from the promoter in writing, verify it on the MahaRERA portal, and take legal advice before paying any further instalment.

What are my rights if Samarth Pride is delayed beyond 31 Dec 2025?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Samarth Pride?

The registered promoter entity is Samarth Pride, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Samarth Pride?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for Samarth Pride?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Samarth Pride?

The professionals named in the filing: Architect: DHANANJAY B DOIFODE; Engineer: ABHAY S PATIL; Chartered Accountant: SHYAMKANT MAHADEVRAO BORDE; Chartered Accountant: SUDHAKAR NANA AHER. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Samarth Pride?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Samarth Pride. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Samarth Pride to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.