Home / Browse projects / Pune, Maharashtra / SAKSHAM APARTMENT
SAKSHAM APARTMENT
RG-MH-34886 · RERA P52100051920 · Last updated on MahaRERA portal: 29 Dec 2025
Source: official MahaRERA filing
Or get an email each time it changes, with the project watch
Red flags
- Registration lapsed
- Possession 10 months past the filed date
- 1 complaint at MahaRERA
Clear
- No litigation declared
- Completion date never moved
- No encumbrance on the project land
- Separate project account declared
- Allotment letter follows the model form
3 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.
See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
SAKSHAM APARTMENT is a Residential / Group Housing project by ANIKET RAVINDRA PATIL in Pune, Maharashtra, registered with MahaRERA as P52100051920 on 13 Jul 2023. Possession was promised by 31 Dec 2025 and is now 10 months past that date. 1 complaint is on record with the regulator.
At a glance
Project
- NameSAKSHAM APARTMENT
- TypeResidential / Group Housing
- Location
- Dehu Alalndi Road
- Moshi
- Haveli
- Pune
- 412105
- Pincode412105
- MapView location on Google Maps (as filed on RERA)
- RERA no.P52100051920
- ReraGenie IDRG-MH-34886
Builder
- NameANIKET RAVINDRA PATIL
- Entity typeIndividual
- Other registrations1 more →
- Completed1 of 2
- No longer live1 lapsed, de-registered or revoked
Key dates
Key facts
Registration and timeline
- StatusRegistration lapsed
- Registered on13 Jul 2023
- Promised completion31 Dec 2025
- Revised completionNone
- Buildings1 building record
- Documents filed63 files
Current status
Figures as on 29 Dec 2025, this project's latest MahaRERA filing.
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| SAKSHAM APARTMENT | NA | 5 | 0 | 0 | 0 | 0 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building1
As on 29 Dec 2025, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
11 of 11 construction stages are filed complete.
SAKSHAM APARTMENT: 100% average across the applicable activities
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 100% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
Progress on shared amenities15
As on 29 Dec 2025, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | Yes | 100% |
| Water Supply | Yes | 100% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 100% |
| Storm Water Drains | Yes | 100% |
| Landscaping & Tree Planting | Yes | 100% |
| Street Lighting | Yes | 100% |
| Community Buildings | No | Not applicable |
| Treatment And Disposal Of Sewage And Sullage Water | Yes | 100% |
| Solid Waste Management And Disposal | Yes | 100% |
| Water conservation /Rain water harvesting | Yes | 0% |
| Energy managemcnt | No | Not applicable |
| Fire protection and fire safety requirements | Yes | 100% |
| Electrical meter room, sub-station, receiving station | Yes | 100% |
| Aggregate area of recreational Open Space | Yes | 100% |
| Open Parking | Yes | 100% |
Parking filed50
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
Land and ownership1
MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.
| Landowner | Village | District |
|---|---|---|
| HIRAMAN DNYANESHWAR ALHAT | Moshi | Pune |
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
| Building | Wing | Estimated | Incurred |
|---|---|---|---|
| SAKSHAM APARTMENT | NA | Rs 3.50 cr | Rs 3.50 cr |
Certifying professionals and partners6
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | SHANKAR PHADAKE |
| Architect | SHASHANK PRAKASH PHADAKE |
| Engineer | KAILAS NAIDU |
| Chartered Accountant | CA YOGESHKUMAR THANVI |
| Chartered Accountant | YOGESHKUMAR THANVI |
| Chartered Accountant | GOVIND MURARILAL CHOMAL |
| Partner | Role in project |
|---|---|
| ANIKET RAVINDRA PATIL | - |
Complaints filed with MahaRERA1
| Case no. | Complainant | Respondent | Filed |
|---|---|---|---|
| CC12603743 | hiraman dnyaneshwar alhat | ANIKET RAVINDRA PATIL | 17/06/2026 |
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 15 May 2023 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 7 Jun 2023 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 10 Jul 2023 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 15 May 2023Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateNot on the file
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
Documents filed63
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Form 2A (FY 2023-2024)File: Form 2A_23-24.pdf | 29 Dec 2025 |
| Form 2A (FY 2024-2025)File: Form 2A_24-25.pdf | 29 Dec 2025 |
| Form 5 (FY 2024-2025)File: Form 5 _SIGN.pdf | 24 Dec 2025 |
| Withdrawal Update Form 1File: FORM1.pdf | 1 Dec 2025 |
| Withdrawal Update Form 2File: form 2.pdf | 1 Dec 2025 |
| Withdrawal Update Form 3File: Form 3.pdf | 1 Dec 2025 |
| Form 1File: Form 1.pdf | 4 Aug 2025 |
| Form 2File: form 2.pdf | 4 Aug 2025 |
| Form 3File: Form 3.pdf | 4 Aug 2025 |
| Disclosure of Sold and Booked InventoryFile: INVETORY_SOLD UNSOLD.pdf | 4 Aug 2025 |
| Form 1File: FORM1.pdf | 4 Aug 2025 |
| Form 2File: FORM 2.pdf | 4 Aug 2025 |
| Form 3File: FORM 3.pdf | 4 Aug 2025 |
| Disclosure of Sold and Booked InventoryFile: INVETORY_SLOLD_UNSOLD.pdf | 4 Aug 2025 |
| Form 1File: FORM1.pdf | 4 Aug 2025 |
| Form 2File: FORM 2.pdf | 4 Aug 2025 |
| Form 3File: FORM 3.pdf | 4 Aug 2025 |
| Disclosure of Sold and Booked InventoryFile: INVETORY_SLOLD_UNSOLD.pdf | 4 Aug 2025 |
| Withdrawal Update Form 1File: Aniket Patil - Form 1.pdf | 4 Aug 2025 |
| Withdrawal Update Form 2File: Withdrawal Application Form2.pdf | 4 Aug 2025 |
| Withdrawal Update Form 3File: Withdrawal Application form 3.pdf | 4 Aug 2025 |
| Form 1File: Aniket Patil- Form 1.pdf | 3 Jun 2025 |
| Form 1File: FORM1.pdf | 3 Jun 2025 |
| Form 2File: FORM 2.pdf | 3 Jun 2025 |
| Form 3File: FORM 3.pdf | 3 Jun 2025 |
| Form 1File: FORM1.pdf | 3 Jun 2025 |
| Form 2File: FORM 2.pdf | 3 Jun 2025 |
| Form 3File: FORM 3.pdf | 3 Jun 2025 |
| Form 1File: FORM1.pdf | 3 Jun 2025 |
| Form 2File: FORM 2.pdf | 3 Jun 2025 |
| Form 3File: FORM 3.pdf | 3 Jun 2025 |
| Form 5 (FY 2023-2024)File: Form 5Sign.pdf | 3 Jun 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1.pdf | 5 May 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2.pdf | 5 May 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1.pdf | 5 Feb 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3_compressed.pdf | 5 Feb 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2.pdf | 5 Feb 2025 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: FORM 2A.pdf | 5 Feb 2025 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Form5_23-24.pdf | 5 Feb 2025 |
| Building plan approvalFile: APPROVED LAYOUTCompress.pdf | 10 Jul 2023 |
| Building plan approvalFile: FLOOR PLAN 1.pdf | 10 Jul 2023 |
| Building plan approvalFile: FLOOR PLAN 2.pdf | 10 Jul 2023 |
| Building Plan Approval / NA Order for plotted developmentFile: APPROVED LAYOUTCompress.pdf | 10 Jul 2023 |
| Building Plan Approval / NA Order for plotted developmentFile: FLOOR PLAN 1.pdf | 10 Jul 2023 |
| Building Plan Approval / NA Order for plotted developmentFile: FLOOR PLAN 2.pdf | 10 Jul 2023 |
| Declaration in FORM BFile: FORM B.pdf | 10 Jul 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3.pdf | 15 Jun 2023 |
| Disclosure of Interest in Other Real Estate OrganizationsFile: Disclosure share in Other Firm.pdf | 15 Jun 2023 |
| Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: SEPRATE BANK ACCOUNT FORMAT A.pdf | 15 Jun 2023 |
| Deviation Report with respect to Allotment letterFile: deviation sheet allotment.pdf | 15 Jun 2023 |
| Deviation Report with respect to model copy of AgreementFile: DEVIATION SHEET FOR AGREEMENT TO SALEINAL_compressed.pdf | 15 Jun 2023 |
| Layout approvalFile: APPROVED LAYOUT.pdf | 7 Jun 2023 |
| Copy of Layout Approval (in case of layout)File: APPROVED LAYOUT.pdf | 7 Jun 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2.pdf | 7 Jun 2023 |
| CERSAI detailsFile: DEC SECURITY INSTEREST.pdf | 7 Jun 2023 |
| Declaration about Commencement CertificateFile: DECLARATION ABOUT COMMENCE CERTIFICATE.pdf | 16 May 2023 |
| PAN CardFile: PAN.pdf | 15 May 2023 |
| Copy of the legal title reportFile: Legal Title Report Moshi_compressed.pdf | 15 May 2023 |
| Details of encumbrances concerned to FinanceFile: ENCUMBERANCE CERTIFICATE.pdf | 15 May 2023 |
| Details of encumbrances concerned to LegalFile: ENCUMBERANCE CERTIFICATE.pdf | 15 May 2023 |
| Commencement Certificates / NA Order for plotted developmentFile: COMMENCEMENT CERTIFICATE_compressed (1).pdf | 15 May 2023 |
| Proforma of Agreement for saleFile: AGREEMENT TO SELL DRAFT.pdf | 15 May 2023 |
| Proforma of Allotment letterFile: ALLOTMENT LETTER DRAFT.pdf | 15 May 2023 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Pune
Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.
Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Built from this project's filings on the day you order, in plain language.
- 3 conditions on this project's record read and explained, with the clear checks alongside
- Joined against the promoter's 1 other registration and every project registered within 2 km, which the RERA portal never shows together
- All 63 filed documents as one ZIP, foldered, with a manifest
- The project watch below, included free for 90 days
Project watch
Only want to be told when something changes?
- An email each time this filing moves: new sales, a moved possession date, an extension, a complaint, the occupancy certificate
- Plain words, conditions that have happened marked in red
- A summary of everything that changed when the 90 days end
Keep SAKSHAM APARTMENT on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near Moshi13,700+ in Pune
Filed coordinates, straight-line distance. 153 registered projects within 2 km.
TANISH PARK
TANISH DEVELOPERS
Ajinkya Towers
APAK Bussiness Innovation Pvt Ltd
SILVER GARDENIA
SILVER PROMOTERS AND DEVELOPERS
Mangalam Life Park
Mangalam Buildcorp
SingaPune Ph 3
Xrbia Mirth Properties LLP
SingaPune Ph 2
Xrbia Mirth Properties LLP
Builder: ANIKET RAVINDRA PATIL
Aniket Ravindra Patil has 2 registrations on MahaRERA, including Aradhya Apartments and SAKSHAM APARTMENT. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Pune district page.
Frequently asked questions
What does it mean that SAKSHAM APARTMENT shows as registration lapsed on MahaRERA?
A registration runs until the completion date the promoter declared. If the project is neither completed nor extended by then it lapses, and a de-registration or revocation ends it by order. In every case the promoter may no longer legally advertise, market or sell in the project, and the Authority can act under section 7 against a defaulting promoter. What it does not do is cancel an agreement for sale you have already signed, or extinguish your section 18 right to delay interest or refund; those run from your agreement, not from the registration. Get the current position from the promoter in writing, verify it on the MahaRERA portal, and take legal advice before paying any further instalment.
What are my rights if SAKSHAM APARTMENT is delayed beyond 31 Dec 2025?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of SAKSHAM APARTMENT?
The registered promoter entity is ANIKET RAVINDRA PATIL, an individual as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in SAKSHAM APARTMENT?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How do I read the complaint cases filed against SAKSHAM APARTMENT?
Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.
How current is the construction progress shown for SAKSHAM APARTMENT?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at SAKSHAM APARTMENT?
The professionals named in the filing: Architect: SHANKAR PHADAKE; Architect: SHASHANK PRAKASH PHADAKE; Engineer: KAILAS NAIDU; Chartered Accountant: CA YOGESHKUMAR THANVI; Chartered Accountant: YOGESHKUMAR THANVI; Chartered Accountant: GOVIND MURARILAL CHOMAL. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in SAKSHAM APARTMENT?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback