Home / Browse projects / Pune, Maharashtra / Sajan Siddhi D Wing
Sajan Siddhi D Wing
By Nemichand Bhandari Associates
RG-MH-85816 · RERA P52100080970 · Last updated on MahaRERA portal: 20 Aug 2026
Source: official MahaRERA filing
Or get an email each time it changes, with the project watch
Red flags
- Completion date moved by 12 months
- 1 extension taken
Clear
- No litigation declared
- No complaints on record
- No encumbrance on the project land
- Separate project account declared
- Allotment letter follows the model form
2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.
See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
Sajan Siddhi D Wing is a Residential / Group Housing project by Nemichand Bhandari Associates in Pune, Maharashtra, registered with MahaRERA as P52100080970 on 11 Sep 2025. Possession is promised by 31 Dec 2026. The completion date has moved by 12 months from the original filing. 11 of the 36 units on this registration are recorded sold or booked, and 7 of 11 construction stages are filed complete.
At a glance
Project
- NameSajan Siddhi D Wing
- TypeResidential / Group Housing
- Location
- Sarde Baug
- Shivane
- Shivne (Part)
- Haveli
- Pune
- 411023
- Pincode411023
- MapView location on Google Maps (as filed on RERA)
- RERA no.P52100080970
- ReraGenie IDRG-MH-85816
Key dates
Key facts
Registration and timeline
- StatusRegistered
- Registered on11 Sep 2025
- Promised completion31 Dec 2026
- Revised completionRevised to 31 Dec 2026 (originally 31 Dec 2025)
- Buildings1 building record
- Documents filed115 files
Current status
Figures as on 20 Aug 2026, this project's latest MahaRERA filing.
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| Wing D | NA | 6 | 6 | 36 | 0 | 36 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building1
As on 20 Aug 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
7 of 11 construction stages are filed complete. The stage furthest along is Basement (if any), at 0%.
Wing D: 64% average across the applicable activities
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 0% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
Progress on shared amenities15
As on 20 Aug 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | Yes | 100% |
| Water Supply | Yes | 100% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 100% |
| Storm Water Drains | Yes | 100% |
| Landscaping & Tree Planting | Yes | 100% |
| Street Lighting | No | Not applicable |
| Community Buildings | No | Not applicable |
| Treatment And Disposal Of Sewage And Sullage Water | No | Not applicable |
| Solid Waste Management And Disposal | No | Not applicable |
| Water conservation /Rain water harvesting | Yes | 100% |
| Energy managemcnt | Yes | 95% |
| Fire protection and fire safety requirements | Yes | 95% |
| Electrical meter room, sub-station, receiving station | Yes | 100% |
| Aggregate area of recreational Open Space | No | Not applicable |
| Open Parking | Yes | 0% |
Parking filed52
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
Land and ownership4
MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.
| Landowner | Village | District |
|---|---|---|
| Sopan Pundalik Sarade | Pune (M Corp.) | Pune |
| Neta Sopan Sarade | Pune (M Corp.) | Pune |
| Ganesh Pundalik Sarade | Pune (M Corp.) | Pune |
| Smita Ganesh Sarade | Pune (M Corp.) | Pune |
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
| Building | Wing | Estimated | Incurred |
|---|---|---|---|
| Wing D | NA | Rs 4.71 cr | Rs 4.02 cr |
Certifying professionals and partners6
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | Babasaheb Dhavale & Associates |
| Engineer | Akshay Oswal |
| Engineer | Kedar Phadnis |
| Chartered Accountant | SAC & CO LLP |
| Chartered Accountant | SAC & Co. LLP |
| Chartered Accountant | Priyanka Chordiya |
| Partner | Role in project |
|---|---|
| Nemichand Bhandari Associates | - |
Extensions applied for1
A revised date filed with the regulator does not change the possession date in your agreement for sale.
Reason as filed by the promoterOut of the total sanction layout. The building work is completed. But, Amenity space handover procedure is to be completed by PMC and the required TDR is to be generated. The timeline for this procedure is required. Without this handover of amenity space, PMC is not ready to give completion certificate. This may take us 12 months as a usual standard timeline for this process.
Complaints filed with MahaRERA
No complaints on record against this registration.
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 11 Nov 2024 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 29 Nov 2024 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 11 Nov 2024 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 19 Aug 2025Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateNot due yet
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
possession is promised for 31 Dec 2026
Documents filed115
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 115 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Form 2A (FY 2025-2026)File: FORM 2A ENGINEERS CERTIFICATE QUALITY ASSURANCE CERTIFICATE 2025-26 (2).pdf | 20 Aug 2026 |
| Withdrawal Update Form 1File: Form 1 11082026 sign.pdf | 12 Aug 2026 |
| Withdrawal Update Form 2File: Form 2 30062026 sign.pdf | 12 Aug 2026 |
| Withdrawal Update Form 3File: Form 3 30062026 sign sajan siddhi D wing.pdf | 12 Aug 2026 |
| Withdrawal Update Form 1File: Form 1 sign.pdf | 20 Apr 2026 |
| Withdrawal Update Form 2File: FORM 2_31032026 sign_compressed.pdf | 20 Apr 2026 |
| Withdrawal Update Form 3File: Form 3 Sajan Siddhi D Wing as on 31032026 sign_compressed.pdf | 20 Apr 2026 |
| Withdrawal Update Form 1File: Form 1 Architect Certificate dt 311225.pdf | 29 Jan 2026 |
| Withdrawal Update Form 2File: Form 2 Engineer Certificate Dt 311225.pdf | 29 Jan 2026 |
| Withdrawal Update Form 3File: Form 3 Sajan Siddhi D Wing as on 31122025 sign_compressed.pdf | 29 Jan 2026 |
| Withdrawal Update Form 1File: Form 1_Architectu0027s Certificate Dt_30092025.pdf | 13 Oct 2025 |
| Withdrawal Update Form 2File: Engineeru0027s Certificate_Dt_30092025.pdf | 13 Oct 2025 |
| Withdrawal Update Form 3File: form 3 Sajan Siddhi D wing 30-09-2025_SIGN COPY_compressed.pdf | 13 Oct 2025 |
| Commencement Certificates / NA Order for plotted developmentFile: CC new_compressed.pdf | 19 Aug 2025 |
| Commencement Certificates / NA Order for plotted developmentFile: CC new_compressed.pdf | 19 Aug 2025 |
| Commencement Certificates / NA Order for plotted developmentFile: CC new_compressed.pdf | 19 Aug 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 9 Form 1.pdf | 4 Aug 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 12 Form 3 Sajan Siddhi D Wing-Registration sing_compressed.pdf | 4 Aug 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 11 Form 2 Engineer's Certificate.pdf | 4 Aug 2025 |
| Disclosure of sold/ booked inventoryFile: 10 Disclosure of sold - booked inventory.pdf | 4 Aug 2025 |
| Declaration about Commencement CertificateFile: 1 Format D Commencement certificate declaration new_.pdf | 4 Aug 2025 |
| Declaration about all RERA Designated Bank Accounts (Format A)File: 5 New_Format A for single promoter_.pdf | 4 Aug 2025 |
| Other - TechnicalFile: 13 plinth inward certificate (6).pdf | 4 Aug 2025 |
| Other - TechnicalFile: 16 mail 20250725 at 41339 PM.pdf | 4 Aug 2025 |
| Other - TechnicalFile: 2 declaration cum annexure.pdf | 4 Aug 2025 |
| Letter from the bank regarding the opening of RERA Designated Bank Accounts (Format B)File: 8 Nemichand bhandari Assocites Formate B Bank.pdf | 4 Aug 2025 |
| Disclosure for secured/unsecured finance availed for the projectFile: 6 Disclosure of Sedured- unsecured-Promoter.pdf | 4 Aug 2025 |
| Disclosure for secured/unsecured finance availed for the projectFile: 7 CA Certificate - secured-unsecured Finance.pdf | 4 Aug 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 9 Form 1.pdf | 4 Aug 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 12 Form 3 Sajan Siddhi D Wing-Registration sing_compressed.pdf | 4 Aug 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 11 Form 2 Engineer's Certificate.pdf | 4 Aug 2025 |
| Disclosure of sold/ booked inventoryFile: 10 Disclosure of sold - booked inventory.pdf | 4 Aug 2025 |
| Declaration about Commencement CertificateFile: 1 Format D Commencement certificate declaration new_.pdf | 4 Aug 2025 |
| Declaration about all RERA Designated Bank Accounts (Format A)File: 5 New_Format A for single promoter_.pdf | 4 Aug 2025 |
| Other - TechnicalFile: 13 plinth inward certificate (6).pdf | 4 Aug 2025 |
| Other - TechnicalFile: 16 mail 20250725 at 41339 PM.pdf | 4 Aug 2025 |
| Other - TechnicalFile: 2 declaration cum annexure.pdf | 4 Aug 2025 |
| Letter from the bank regarding the opening of RERA Designated Bank Accounts (Format B)File: 8 Nemichand bhandari Assocites Formate B Bank.pdf | 4 Aug 2025 |
| Disclosure for secured/unsecured finance availed for the projectFile: 6 Disclosure of Sedured- unsecured-Promoter.pdf | 4 Aug 2025 |
| Disclosure for secured/unsecured finance availed for the projectFile: 7 CA Certificate - secured-unsecured Finance.pdf | 4 Aug 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 9 Form 1.pdf | 4 Aug 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 12 Form 3 Sajan Siddhi D Wing-Registration sing_compressed.pdf | 4 Aug 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 11 Form 2 Engineer's Certificate.pdf | 4 Aug 2025 |
| Disclosure of sold/ booked inventoryFile: 10 Disclosure of sold - booked inventory.pdf | 4 Aug 2025 |
| Declaration about Commencement CertificateFile: 1 Format D Commencement certificate declaration new_.pdf | 4 Aug 2025 |
| Declaration about all RERA Designated Bank Accounts (Format A)File: 5 New_Format A for single promoter_.pdf | 4 Aug 2025 |
| Other - TechnicalFile: 13 plinth inward certificate (6).pdf | 4 Aug 2025 |
| Other - TechnicalFile: 16 mail 20250725 at 41339 PM.pdf | 4 Aug 2025 |
| Other - TechnicalFile: 2 declaration cum annexure.pdf | 4 Aug 2025 |
| Letter from the bank regarding the opening of RERA Designated Bank Accounts (Format B)File: 8 Nemichand bhandari Assocites Formate B Bank.pdf | 4 Aug 2025 |
| Disclosure for secured/unsecured finance availed for the projectFile: 6 Disclosure of Sedured- unsecured-Promoter.pdf | 4 Aug 2025 |
| Disclosure for secured/unsecured finance availed for the projectFile: 7 CA Certificate - secured-unsecured Finance.pdf | 4 Aug 2025 |
| Layout approvalFile: Shivne D wing 1_4 Layout_compressed.pdf | 29 Nov 2024 |
| Layout approvalFile: Shivne D wing 1_4 Layout_compressed.pdf | 29 Nov 2024 |
| Layout approvalFile: Shivne D wing 1_4 Layout_compressed.pdf | 29 Nov 2024 |
| Copy of Layout Approval (in case of layout)File: Shivne D wing 1_4 Layout_compressed.pdf | 29 Nov 2024 |
| Copy of Layout Approval (in case of layout)File: Shivne D wing 1_4 Layout_compressed.pdf | 29 Nov 2024 |
| Copy of Layout Approval (in case of layout)File: Shivne D wing 1_4 Layout_compressed.pdf | 29 Nov 2024 |
| Declaration in FORM BFile: Form _B Sajan Sidhi.pdf | 23 Nov 2024 |
| Declaration in FORM BFile: Form _B Sajan Sidhi.pdf | 23 Nov 2024 |
| Declaration in FORM BFile: Form _B Sajan Sidhi.pdf | 23 Nov 2024 |
| Details of encumbrances concerned to FinanceFile: 2Details of encumbrances concerned to Finance Legal.pdf | 22 Nov 2024 |
| Details of encumbrances concerned to FinanceFile: 2Details of encumbrances concerned to Finance Legal.pdf | 22 Nov 2024 |
| Proforma of Allotment letterFile: Model Form of Allotment Letter_compress.pdf | 22 Nov 2024 |
| CERSAI detailsFile: cersai-signed.pdf | 22 Nov 2024 |
| Details of encumbrances concerned to LegalFile: 2Details of encumbrances concerned to Finance Legal.pdf | 22 Nov 2024 |
| Details of encumbrances concerned to LegalFile: 2Details of encumbrances concerned to Finance Legal.pdf | 22 Nov 2024 |
| Proforma of Agreement for saleFile: Model Agreement to Sale RERA document_compress.pdf | 22 Nov 2024 |
| Details of encumbrances concerned to FinanceFile: 2Details of encumbrances concerned to Finance Legal.pdf | 22 Nov 2024 |
| Details of encumbrances concerned to FinanceFile: 2Details of encumbrances concerned to Finance Legal.pdf | 22 Nov 2024 |
| Proforma of Allotment letterFile: Model Form of Allotment Letter_compress.pdf | 22 Nov 2024 |
| CERSAI detailsFile: cersai-signed.pdf | 22 Nov 2024 |
| Details of encumbrances concerned to LegalFile: 2Details of encumbrances concerned to Finance Legal.pdf | 22 Nov 2024 |
| Details of encumbrances concerned to LegalFile: 2Details of encumbrances concerned to Finance Legal.pdf | 22 Nov 2024 |
| Proforma of Agreement for saleFile: Model Agreement to Sale RERA document_compress.pdf | 22 Nov 2024 |
| Details of encumbrances concerned to FinanceFile: 2Details of encumbrances concerned to Finance Legal.pdf | 22 Nov 2024 |
| Details of encumbrances concerned to FinanceFile: 2Details of encumbrances concerned to Finance Legal.pdf | 22 Nov 2024 |
| Proforma of Allotment letterFile: Model Form of Allotment Letter_compress.pdf | 22 Nov 2024 |
| CERSAI detailsFile: cersai-signed.pdf | 22 Nov 2024 |
| Details of encumbrances concerned to LegalFile: 2Details of encumbrances concerned to Finance Legal.pdf | 22 Nov 2024 |
Promoter's earlier projects1
As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.
| Project | Location | Flats | Status | Promised | Delivered |
|---|---|---|---|---|---|
| Bhumi Siddhi | 32A at Pimpri Chichwad M Corp Haveli Pune 411044 | 71 | Completed | Apr 2017 | Late, Jun 2018 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Pune
Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.
Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Built from this project's filings on the day you order, in plain language.
- 2 conditions on this project's record read and explained, with the clear checks alongside
- Joined against the promoter's 1 other registration and every project registered within 2 km, which the RERA portal never shows together
- All 115 filed documents as one ZIP, foldered, with a manifest
- The project watch below, included free for 90 days
Project watch
Only want to be told when something changes?
- An email each time this filing moves: new sales, a moved possession date, an extension, a complaint, the occupancy certificate
- Plain words, conditions that have happened marked in red
- A summary of everything that changed when the 90 days end
Keep Sajan Siddhi D Wing on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near Shivane13,700+ in Pune
Filed coordinates, straight-line distance. 33 registered projects within 2 km.
Mont Vert Kingstown Sector 1 Residential Wings
Niraj Kumar Associates Pvt Ltd
RANJAI
Shinde & Patil Construction
SAI NISARG
SHRI SAI SHRADDHA DEVELOPERS
ANSHRAJ ICON
VIJAY DEVELOPERS
Belview
Tranquil Infratech LLP
Audumbar Nest A1 A2 and B Building
Om Chidanand Developers
Builder: Nemichand Bhandari Associates
Nemichand Bhandari Associates has 2 registrations on MahaRERA, including Bhumi Siddhi and Sajan Siddhi D Wing. Its filings disclose 2 earlier MahaRERA projects: declares 1 of 2 past projects completed on time. Read the full track record. See more projects on the Pune district page.
Frequently asked questions
What are my rights if Sajan Siddhi D Wing is delayed beyond 31 Dec 2026?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of Sajan Siddhi D Wing?
The registered promoter entity is Nemichand Bhandari Associates, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in Sajan Siddhi D Wing?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How current is the construction progress shown for Sajan Siddhi D Wing?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at Sajan Siddhi D Wing?
The professionals named in the filing: Architect: Babasaheb Dhavale & Associates; Engineer: Akshay Oswal; Engineer: Kedar Phadnis; Chartered Accountant: SAC & CO LLP; Chartered Accountant: SAC & Co. LLP; Chartered Accountant: Priyanka Chordiya. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in Sajan Siddhi D Wing?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback