ReraGenieLog inGet a buyer report

Home / Browse projects / Pune, Maharashtra / Sajan Siddhi D Wing

Registered No litigation declared Residential / Group Housing project

Sajan Siddhi D Wing

By Nemichand Bhandari Associates

RG-MH-85816 · RERA P52100080970 · Last updated on MahaRERA portal: 20 Aug 2026

Source: official MahaRERA filing

Red flags

  • Completion date moved by 12 months
  • 1 extension taken

Clear

  • No litigation declared
  • No complaints on record
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form

2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.
Dec 2026Possession promisedmoved 12 months from the original
7 of 11Construction stages donefurthest along: Basement (if any), 0%
25 of 36Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 115 documents Report an error

Sajan Siddhi D Wing is a Residential / Group Housing project by Nemichand Bhandari Associates in Pune, Maharashtra, registered with MahaRERA as P52100080970 on 11 Sep 2025. Possession is promised by 31 Dec 2026. The completion date has moved by 12 months from the original filing. 11 of the 36 units on this registration are recorded sold or booked, and 7 of 11 construction stages are filed complete.

At a glance

Project

  • NameSajan Siddhi D Wing
  • TypeResidential / Group Housing
  • Location
    • Sarde Baug
    • Shivane
    • Shivne (Part)
    • Haveli
    • Pune
    • 411023
  • Pincode411023
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P52100080970
  • ReraGenie IDRG-MH-85816

Builder

  • NameNemichand Bhandari Associates
  • Entity typePartnership
  • Other registrations1 more →
  • Completed1 of 2
  • Declared earlier projects2 →

Key dates

this monthRegisteredSep 2025First promiseDec 2025Revised toDec 2026

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on11 Sep 2025
  • Promised completion31 Dec 2026
  • Revised completionRevised to 31 Dec 2026 (originally 31 Dec 2025)
  • Buildings1 building record
  • Documents filed115 files

Current status

31%11 of 36 units booked
85.4%Work done, per cost certificate

Figures as on 20 Aug 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Wing DNA6636036

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 20 Aug 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

7 of 11 construction stages are filed complete. The stage furthest along is Basement (if any), at 0%.

Wing D: 64% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Progress on shared amenities15

As on 20 Aug 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes100%
Water SupplyYes100%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsYes100%
Landscaping & Tree PlantingYes100%
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes100%
Energy managemcntYes95%
Fire protection and fire safety requirementsYes95%
Electrical meter room, sub-station, receiving stationYes100%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingYes0%

Parking filed52

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots52
Closed/Covered26
Open Space26

Land and ownership4

MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area1,613 sq m
Land owned byThe promoter, with other names on the file
Named landowners4
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on11 Oct 2025
LandownerVillageDistrict
Sopan Pundalik SaradePune (M Corp.)Pune
Neta Sopan SaradePune (M Corp.)Pune
Ganesh Pundalik SaradePune (M Corp.)Pune
Smita Ganesh SaradePune (M Corp.)Pune

Approvals and building plan

Sanctioning authorityPune Municipal Corporation
Permissible FSI1763.49
Proposed, not sanctioned1,763 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchA C COLLEGE OF COMMERCE, JALPAIGURI PUNE SATARA ROAD, SAHAKAR NAGAR,
Estimated costRs 4.71 cr
Cost incurredRs 4.02 cr
Work done85.43%
BuildingWingEstimatedIncurred
Wing DNARs 4.71 crRs 4.02 cr

Certifying professionals and partners6

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectBabasaheb Dhavale & Associates
EngineerAkshay Oswal
EngineerKedar Phadnis
Chartered AccountantSAC & CO LLP
Chartered AccountantSAC & Co. LLP
Chartered AccountantPriyanka Chordiya
PartnerRole in project
Nemichand Bhandari Associates-

Extensions applied for1

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EA02122518485Dec 2025 → Dec 2026

Reason as filed by the promoterOut of the total sanction layout. The building work is completed. But, Amenity space handover procedure is to be completed by PMC and the required TDR is to be generated. The timeline for this procedure is required. Without this handover of amenity space, PMC is not ready to give completion certificate. This may take us 12 months as a usual standard timeline for this process.

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 11 Nov 2024
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 29 Nov 2024
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 11 Nov 2024
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 19 Aug 2025Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Dec 2026

Documents filed115

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 115 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Form 2A (FY 2025-2026)File: FORM 2A ENGINEERS CERTIFICATE QUALITY ASSURANCE CERTIFICATE 2025-26 (2).pdf20 Aug 2026
Withdrawal Update Form 1File: Form 1 11082026 sign.pdf12 Aug 2026
Withdrawal Update Form 2File: Form 2 30062026 sign.pdf12 Aug 2026
Withdrawal Update Form 3File: Form 3 30062026 sign sajan siddhi D wing.pdf12 Aug 2026
Withdrawal Update Form 1File: Form 1 sign.pdf20 Apr 2026
Withdrawal Update Form 2File: FORM 2_31032026 sign_compressed.pdf20 Apr 2026
Withdrawal Update Form 3File: Form 3 Sajan Siddhi D Wing as on 31032026 sign_compressed.pdf20 Apr 2026
Withdrawal Update Form 1File: Form 1 Architect Certificate dt 311225.pdf29 Jan 2026
Withdrawal Update Form 2File: Form 2 Engineer Certificate Dt 311225.pdf29 Jan 2026
Withdrawal Update Form 3File: Form 3 Sajan Siddhi D Wing as on 31122025 sign_compressed.pdf29 Jan 2026
Withdrawal Update Form 1File: Form 1_Architectu0027s Certificate Dt_30092025.pdf13 Oct 2025
Withdrawal Update Form 2File: Engineeru0027s Certificate_Dt_30092025.pdf13 Oct 2025
Withdrawal Update Form 3File: form 3 Sajan Siddhi D wing 30-09-2025_SIGN COPY_compressed.pdf13 Oct 2025
Commencement Certificates / NA Order for plotted developmentFile: CC new_compressed.pdf19 Aug 2025
Commencement Certificates / NA Order for plotted developmentFile: CC new_compressed.pdf19 Aug 2025
Commencement Certificates / NA Order for plotted developmentFile: CC new_compressed.pdf19 Aug 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 9 Form 1.pdf4 Aug 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 12 Form 3 Sajan Siddhi D Wing-Registration sing_compressed.pdf4 Aug 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 11 Form 2 Engineer's Certificate.pdf4 Aug 2025
Disclosure of sold/ booked inventoryFile: 10 Disclosure of sold - booked inventory.pdf4 Aug 2025
Declaration about Commencement CertificateFile: 1 Format D Commencement certificate declaration new_.pdf4 Aug 2025
Declaration about all RERA Designated Bank Accounts (Format A)File: 5 New_Format A for single promoter_.pdf4 Aug 2025
Other - TechnicalFile: 13 plinth inward certificate (6).pdf4 Aug 2025
Other - TechnicalFile: 16 mail 20250725 at 41339 PM.pdf4 Aug 2025
Other - TechnicalFile: 2 declaration cum annexure.pdf4 Aug 2025
Letter from the bank regarding the opening of RERA Designated Bank Accounts (Format B)File: 8 Nemichand bhandari Assocites Formate B Bank.pdf4 Aug 2025
Disclosure for secured/unsecured finance availed for the projectFile: 6 Disclosure of Sedured- unsecured-Promoter.pdf4 Aug 2025
Disclosure for secured/unsecured finance availed for the projectFile: 7 CA Certificate - secured-unsecured Finance.pdf4 Aug 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 9 Form 1.pdf4 Aug 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 12 Form 3 Sajan Siddhi D Wing-Registration sing_compressed.pdf4 Aug 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 11 Form 2 Engineer's Certificate.pdf4 Aug 2025
Disclosure of sold/ booked inventoryFile: 10 Disclosure of sold - booked inventory.pdf4 Aug 2025
Declaration about Commencement CertificateFile: 1 Format D Commencement certificate declaration new_.pdf4 Aug 2025
Declaration about all RERA Designated Bank Accounts (Format A)File: 5 New_Format A for single promoter_.pdf4 Aug 2025
Other - TechnicalFile: 13 plinth inward certificate (6).pdf4 Aug 2025
Other - TechnicalFile: 16 mail 20250725 at 41339 PM.pdf4 Aug 2025
Other - TechnicalFile: 2 declaration cum annexure.pdf4 Aug 2025
Letter from the bank regarding the opening of RERA Designated Bank Accounts (Format B)File: 8 Nemichand bhandari Assocites Formate B Bank.pdf4 Aug 2025
Disclosure for secured/unsecured finance availed for the projectFile: 6 Disclosure of Sedured- unsecured-Promoter.pdf4 Aug 2025
Disclosure for secured/unsecured finance availed for the projectFile: 7 CA Certificate - secured-unsecured Finance.pdf4 Aug 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 9 Form 1.pdf4 Aug 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 12 Form 3 Sajan Siddhi D Wing-Registration sing_compressed.pdf4 Aug 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 11 Form 2 Engineer's Certificate.pdf4 Aug 2025
Disclosure of sold/ booked inventoryFile: 10 Disclosure of sold - booked inventory.pdf4 Aug 2025
Declaration about Commencement CertificateFile: 1 Format D Commencement certificate declaration new_.pdf4 Aug 2025
Declaration about all RERA Designated Bank Accounts (Format A)File: 5 New_Format A for single promoter_.pdf4 Aug 2025
Other - TechnicalFile: 13 plinth inward certificate (6).pdf4 Aug 2025
Other - TechnicalFile: 16 mail 20250725 at 41339 PM.pdf4 Aug 2025
Other - TechnicalFile: 2 declaration cum annexure.pdf4 Aug 2025
Letter from the bank regarding the opening of RERA Designated Bank Accounts (Format B)File: 8 Nemichand bhandari Assocites Formate B Bank.pdf4 Aug 2025
Disclosure for secured/unsecured finance availed for the projectFile: 6 Disclosure of Sedured- unsecured-Promoter.pdf4 Aug 2025
Disclosure for secured/unsecured finance availed for the projectFile: 7 CA Certificate - secured-unsecured Finance.pdf4 Aug 2025
Layout approvalFile: Shivne D wing 1_4 Layout_compressed.pdf29 Nov 2024
Layout approvalFile: Shivne D wing 1_4 Layout_compressed.pdf29 Nov 2024
Layout approvalFile: Shivne D wing 1_4 Layout_compressed.pdf29 Nov 2024
Copy of Layout Approval (in case of layout)File: Shivne D wing 1_4 Layout_compressed.pdf29 Nov 2024
Copy of Layout Approval (in case of layout)File: Shivne D wing 1_4 Layout_compressed.pdf29 Nov 2024
Copy of Layout Approval (in case of layout)File: Shivne D wing 1_4 Layout_compressed.pdf29 Nov 2024
Declaration in FORM BFile: Form _B Sajan Sidhi.pdf23 Nov 2024
Declaration in FORM BFile: Form _B Sajan Sidhi.pdf23 Nov 2024
Declaration in FORM BFile: Form _B Sajan Sidhi.pdf23 Nov 2024
Details of encumbrances concerned to FinanceFile: 2Details of encumbrances concerned to Finance Legal.pdf22 Nov 2024
Details of encumbrances concerned to FinanceFile: 2Details of encumbrances concerned to Finance Legal.pdf22 Nov 2024
Proforma of Allotment letterFile: Model Form of Allotment Letter_compress.pdf22 Nov 2024
CERSAI detailsFile: cersai-signed.pdf22 Nov 2024
Details of encumbrances concerned to LegalFile: 2Details of encumbrances concerned to Finance Legal.pdf22 Nov 2024
Details of encumbrances concerned to LegalFile: 2Details of encumbrances concerned to Finance Legal.pdf22 Nov 2024
Proforma of Agreement for saleFile: Model Agreement to Sale RERA document_compress.pdf22 Nov 2024
Details of encumbrances concerned to FinanceFile: 2Details of encumbrances concerned to Finance Legal.pdf22 Nov 2024
Details of encumbrances concerned to FinanceFile: 2Details of encumbrances concerned to Finance Legal.pdf22 Nov 2024
Proforma of Allotment letterFile: Model Form of Allotment Letter_compress.pdf22 Nov 2024
CERSAI detailsFile: cersai-signed.pdf22 Nov 2024
Details of encumbrances concerned to LegalFile: 2Details of encumbrances concerned to Finance Legal.pdf22 Nov 2024
Details of encumbrances concerned to LegalFile: 2Details of encumbrances concerned to Finance Legal.pdf22 Nov 2024
Proforma of Agreement for saleFile: Model Agreement to Sale RERA document_compress.pdf22 Nov 2024
Details of encumbrances concerned to FinanceFile: 2Details of encumbrances concerned to Finance Legal.pdf22 Nov 2024
Details of encumbrances concerned to FinanceFile: 2Details of encumbrances concerned to Finance Legal.pdf22 Nov 2024
Proforma of Allotment letterFile: Model Form of Allotment Letter_compress.pdf22 Nov 2024
CERSAI detailsFile: cersai-signed.pdf22 Nov 2024
Details of encumbrances concerned to LegalFile: 2Details of encumbrances concerned to Finance Legal.pdf22 Nov 2024

Promoter's earlier projects1

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

1 delivered late
ProjectLocationFlatsStatusPromisedDelivered
Bhumi Siddhi32A at Pimpri Chichwad M Corp Haveli Pune 41104471CompletedApr 2017Late, Jun 2018

How this compares with Pune

31%of this project is bookeddistrict median 31%
26%of Pune projects moved their completion datethis one moved by 12 months
26%of Pune registrations have lapsed or been cancelledthis one is on the register

Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.

Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep Sajan Siddhi D Wing on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Shivane13,700+ in Pune

2 kmSajan Siddhi D WingCompleted 11Lapsed / revoked 13Other 9Dot size: filed unitsN

Filed coordinates, straight-line distance. 33 registered projects within 2 km.

Builder: Nemichand Bhandari Associates

Nemichand Bhandari Associates has 2 registrations on MahaRERA, including Bhumi Siddhi and Sajan Siddhi D Wing. Its filings disclose 2 earlier MahaRERA projects: declares 1 of 2 past projects completed on time. Read the full track record. See more projects on the Pune district page.

Frequently asked questions

What are my rights if Sajan Siddhi D Wing is delayed beyond 31 Dec 2026?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Sajan Siddhi D Wing?

The registered promoter entity is Nemichand Bhandari Associates, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Sajan Siddhi D Wing?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for Sajan Siddhi D Wing?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Sajan Siddhi D Wing?

The professionals named in the filing: Architect: Babasaheb Dhavale & Associates; Engineer: Akshay Oswal; Engineer: Kedar Phadnis; Chartered Accountant: SAC & CO LLP; Chartered Accountant: SAC & Co. LLP; Chartered Accountant: Priyanka Chordiya. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Sajan Siddhi D Wing?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Sajan Siddhi D Wing. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Sajan Siddhi D Wing to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.