Home / Browse projects / Pune, Maharashtra / SAIPLAZA
SAIPLAZA
RG-MH-62955 · RERA P52100018259 · Last updated on MahaRERA portal: 18 Mar 2025
Source: official MahaRERA filing
Or get an email each time it changes, with the project watch
Red flags
- Registration lapsed
- Possession 10 months past the filed date
- 1 complaint at MahaRERA
- Completion date moved by 69 months
- 5 extensions taken
Clear
- No litigation declared
- Separate project account declared
- Allotment letter follows the model form
5 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.
See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
SAIPLAZA is a Commercial project by AGASTI DEVELOPERS in Pune, Maharashtra, registered with MahaRERA as P52100018259 on 22 Oct 2018. Possession was promised by 31 Dec 2025 and is now 10 months past that date. The completion date has moved by 69 months from the original filing. 1 complaint is on record with the regulator.
At a glance
Project
- NameSAIPLAZA
- TypeCommercial
- Location
- Pune Nashik Highway
- Rajgurunagar
- Rajgurunagar (CT)
- Khed
- Pune
- 410505
- Pincode410505
- MapView location on Google Maps (as filed on RERA)
- RERA no.P52100018259
- ReraGenie IDRG-MH-62955
Builder
- NameAGASTI DEVELOPERS
- Entity typePartnership
- GSTIN27ABEFA1859L1Z6
- PartnersLAXMIKANT AMBADAS NAIKWADI, SONALI LAXMIKANT NAIKWADI, ATUL GULABRAO TAMBE
Key dates
Key facts
Registration and timeline
- StatusRegistration lapsed
- Registered on22 Oct 2018
- Promised completion31 Dec 2025
- Revised completionRevised to 31 Dec 2025 (originally 31 Mar 2020)
- Buildings1 building record
- Documents filed69 files
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| SAIPLAZA | NA | 7 | 0 | 0 | 0 | 0 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building1
As on 18 Mar 2025, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
11 of 11 construction stages are filed complete.
SAIPLAZA: 100% average across the applicable activities
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 100% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
Progress on shared amenities15
As on 18 Mar 2025, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | No | Not applicable |
| Water Supply | Yes | 100% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 100% |
| Storm Water Drains | Yes | 100% |
| Landscaping & Tree Planting | Yes | 100% |
| Street Lighting | Yes | 100% |
| Community Buildings | No | Not applicable |
| Treatment And Disposal Of Sewage And Sullage Water | No | Not applicable |
| Solid Waste Management And Disposal | No | Not applicable |
| Water conservation /Rain water harvesting | Yes | 100% |
| Energy managemcnt | No | Not applicable |
| Fire protection and fire safety requirements | Yes | 100% |
| Electrical meter room, sub-station, receiving station | Yes | 100% |
| Aggregate area of recreational Open Space | No | Not applicable |
| Open Parking | Yes | 100% |
Parking filed144
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
Land and ownership1
MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.
| Landowner | Village | District |
|---|---|---|
| AGASTI DEVELOPERS | Akola | Ahmednagar |
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
Certifying professionals and partners3
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | LAXMIKANT NAIKWADI |
| Engineer | Vijay Ranade |
| Chartered Accountant | Vikas Naikwadi |
| Partner | Role in project |
|---|---|
| AGASTI DEVELOPERS | - |
Extensions applied for5
A revised date filed with the regulator does not change the possession date in your agreement for sale.
Reason as filed by the promoterConstruction of the project is almost completed and we have already applied for part completion certificate but due to some RTI applications and transfer of concerns officials , completion certificate is getting delayed. As we do not want to apply for further extension we are applying for one time for 10 months extension for the last time. Reasons of the same are explained in detail in the attachment uploaded in Other Tab.
Reason as filed by the promoterDear Authority, We have already completed the construction part and have applied for occupancy certificate but same is pending due to "Mojani Notice" from Bhumi Abhilesh Vibhag, Maharashtra Shasan. One of the citizen had made a complain and had demanded the Mojani, There were multiple applications made under RTI act and this resulted into to delay in processing of application of completion certificate. We request authority to check the details submitted in our last extension request, and we humbly state that the construction part is already done. We are requesting respective authorities to pro
Reason as filed by the promoterNo of days Mansoon stayed in West Maharasthra in FY 2019-20 were quite large as compared to average days. This resulted into delay in construction progress. No of permissions and sanctions were required to be obtained at different stages of construction from different Government authorities. But as there were Central and State Elections in last year, sanctioning authorities were occupied with other responsibilities also. We started our project activities with faster pace but due to unfortunate Corona Virus (nCOVID 9) epidemic number of contractors went to their native places. As we are not sur
Reason as filed by the promoterWe hereby submit this request to kindly grant an extension of three months for the completion timeline of our project [Project Name] registered under RERA with Registration No. P52100018259 Reason for Extension Request: 1. Engagement in Maharashtra State Elections: o Our CEO and key team members were actively engaged and occupied during the Maharashtra State Elections. This included responsibilities that limited their ability to oversee the timely completion of the documentation process. o Additionally, the implementation of the Model Code of Conduct (Acharsanhita) during this period further r
Reason as filed by the promoterWe had applied for extension up to 31/12/2025 in previous application in FORM B but at the time of filing the online application we had selected 31/03/2025 as the extension date by mistake. We hereby request the authority to consider the application once again and grant the extension up to 31/12/2025. Thank you.
Complaints filed with MahaRERA1
| Case no. | Complainant | Respondent | Filed |
|---|---|---|---|
| CC005000000340734 | Mr. Mahesh Kashinath Deshmukh | M/s. Agasti Developers Through its partner Mr. Lakshmikant Ambadas Naikwadi | 07/04/2024 |
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 13 Oct 2018 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 13 Oct 2018 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 13 Oct 2018 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 13 Oct 2018Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateOn the file
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
uploaded 12 Jan 2023
Documents filed69
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Declaration in FORM BFile: Declaration in Form B Format - Promoter.pdf | 18 Mar 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1-D.pdf | 18 Mar 2025 |
| Certificates of CA (Form 3)File: FORM 3_CA.pdf | 18 Mar 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2_D.pdf | 18 Mar 2025 |
| Disclosure of sold/ booked inventoryFile: Sold Inventory_D.pdf | 18 Mar 2025 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: FORM 2A_D.pdf | 18 Mar 2025 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: FORM 5_D.pdf | 18 Mar 2025 |
| Declaration in FORM BFile: FORM B.pdf | 27 Feb 2025 |
| Declaration in FORM BFile: Declaration in Form B Format - Promoter.pdf | 27 Feb 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1.pdf | 27 Feb 2025 |
| Certificates of CA (Form 3)File: FORM 3_CA.pdf | 27 Feb 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2.pdf | 27 Feb 2025 |
| Disclosure of sold/ booked inventoryFile: Sold Inventory.pdf | 27 Feb 2025 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: FORM 2A.pdf | 27 Feb 2025 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: FORM 2A.pdf | 27 Feb 2025 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: FORM 5.pdf | 27 Feb 2025 |
| Declaration in FORM BFile: FORM B.pdf | 31 Jan 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1.pdf | 31 Jan 2025 |
| Certificates of CA (Form 3)File: FORM 3_CA_.pdf | 31 Jan 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2A.pdf | 31 Jan 2025 |
| Disclosure of sold/ booked inventoryFile: Sold_Booked_Unsold Inventory.pdf | 31 Jan 2025 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: FORM 2A.pdf | 31 Jan 2025 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: FORM 5_CA.pdf | 31 Jan 2025 |
| Declaration in FORM BFile: FORMAT-B.pdf | 16 Jan 2025 |
| Disclosure of sold/ booked inventoryFile: Sold_Booked_Unsold Inventory.pdf | 16 Jan 2025 |
| Declaration in FORM BFile: Declaration in Form B Format - Promoter.pdf | 1 Jun 2023 |
| Disclosure of sold/ booked inventoryFile: DISCLOSURE OF SOLD.pdf | 1 Jun 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1.pdf | 24 May 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2.pdf | 24 May 2023 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: Form 2A.pdf | 24 May 2023 |
| Disclosure of sold/ booked inventoryFile: DISCLOSURE OF SOLD BOOKED INVENTORY.pdf | 24 May 2023 |
| Certificates of CA (Form 3)File: Form 3.pdf | 24 May 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: Form 5.pdf | 24 May 2023 |
| Disclosure of Interest in Other Real Estate OrganizationsFile: Interest Declaration.pdf | 12 Jan 2023 |
| Proforma of Agreement for saleFile: Proforma Agrrement of Sale.pdf | 12 Jan 2023 |
| Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: Completion Certificate by Architect.pdf | 12 Jan 2023 |
| Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Bank Account Details.pdf | 12 Jan 2023 |
| Deviation Report with respect to Allotment letterFile: Deviation Statement.pdf | 12 Jan 2023 |
| Deviation Report with respect to model copy of AgreementFile: Deviation Statement.pdf | 12 Jan 2023 |
| Details of encumbrances concerned to FinanceFile: 1 Commencement Certificates _ NA Order for plotted development.pdf | 5 Jan 2023 |
| Details of encumbrances concerned to LegalFile: 1 Commencement Certificates _ NA Order for plotted development.pdf | 5 Jan 2023 |
| Declaration about Commencement CertificateFile: 1 Commencement Certificates _ NA Order for plotted development.pdf | 5 Jan 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Commencement Certificate.pdf | 5 Jan 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Eng Certificate.pdf | 5 Jan 2023 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: Eng Certificate Quality.pdf | 5 Jan 2023 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Eng Certificate Quality.pdf | 5 Jan 2023 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: Eng Certificate Quality.pdf | 5 Jan 2023 |
| Disclosure of sold/ booked inventoryFile: Booked Inventory.pdf | 5 Jan 2023 |
| CERSAI detailsFile: CERSAI Declaration.pdf | 5 Jan 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2017-18)File: Form 5 Annual Statement of Accountant.pdf | 5 Jan 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)File: Form 5 Annual Statement of Accountant.pdf | 5 Jan 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: Form 5 Annual Statement of Accountant.pdf | 5 Jan 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: Form 5 Annual Statement of Accountant.pdf | 5 Jan 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: Form 5 Annual Statement of Accountant.pdf | 5 Jan 2023 |
| Building plan approvalFile: PLAN-1.pdf | 13 Oct 2018 |
| Building plan approvalFile: PLAN-2.pdf | 13 Oct 2018 |
| Layout approvalFile: PLAN-1.pdf | 13 Oct 2018 |
| Layout approvalFile: PLAN-2.pdf | 13 Oct 2018 |
| PAN CardFile: PAN CARD PDF.pdf | 13 Oct 2018 |
| Copy of the legal title reportFile: SEARCH AND TITLE REPORT.pdf | 13 Oct 2018 |
| Details of encumbrancesFile: ENCUMBEREANCE CERTFICATE.pdf | 13 Oct 2018 |
| Copy of Layout Approval (in case of layout)File: PLAN-1.pdf | 13 Oct 2018 |
| Copy of Layout Approval (in case of layout)File: PLAN-2.pdf | 13 Oct 2018 |
| Building Plan Approval (IOD)File: PLAN-1.pdf | 13 Oct 2018 |
| Building Plan Approval (IOD)File: PLAN-2.pdf | 13 Oct 2018 |
| Commencement Certificates / NA Order for plotted developmentFile: COMMENCEMENT CUM SANCTION LETTER.pdf | 13 Oct 2018 |
| Declaration in FORM BFile: FORM B ARCHITECT CERTFICATE.pdf | 13 Oct 2018 |
| Certificates of CA (Form 3)File: CA CERTIFICATE FORM 3.pdf | 13 Oct 2018 |
| Proforma of Allotment letterFile: AGREEMENT TO SALE.pdf | 13 Oct 2018 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Pune
Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.
Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Built from this project's filings on the day you order, in plain language.
- 5 conditions on this project's record read and explained, with the clear checks alongside
- Joined against every project registered within 2 km, which the RERA portal never shows together
- All 69 filed documents as one ZIP, foldered, with a manifest
- The project watch below, included free for 90 days
Project watch
- A watch tells you the moment that changes, including if the registration lapses or a complaint is filed
- But on this project's record so far, expect it to be quiet. You can also save this project free and keep it on your shortlist
Keep SAIPLAZA on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near Rajgurunagar13,700+ in Pune
Filed coordinates, straight-line distance. 433 registered projects within 2 km.
First City
Xrbia Developers Ltd
SURAJ EKYUM
SURAJ INFRA
Shankeshwar World
Nitin Chhaganlal Jain
Escape City Ph 1
Gajendra Patil , Pramod Patil , Vinod Pati
YESAI PARK
SIDDHIVINAYAK DEVELOPERS
Escape City Ph 2
Gajendra Patil , Pramod Patil , Vinod Pati
Builder: AGASTI DEVELOPERS
AGASTI DEVELOPERS has 1 registration on MahaRERA, including SAIPLAZA. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Pune district page.
Frequently asked questions
What does it mean that SAIPLAZA shows as registration lapsed on MahaRERA?
A registration runs until the completion date the promoter declared. If the project is neither completed nor extended by then it lapses, and a de-registration or revocation ends it by order. In every case the promoter may no longer legally advertise, market or sell in the project, and the Authority can act under section 7 against a defaulting promoter. What it does not do is cancel an agreement for sale you have already signed, or extinguish your section 18 right to delay interest or refund; those run from your agreement, not from the registration. Get the current position from the promoter in writing, verify it on the MahaRERA portal, and take legal advice before paying any further instalment.
What are my rights if SAIPLAZA is delayed beyond 31 Dec 2025?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of SAIPLAZA?
The registered promoter entity is AGASTI DEVELOPERS, a partnership as per the filing. Its GSTIN 27ABEFA1859L1Z6 can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in SAIPLAZA?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How do I read the complaint cases filed against SAIPLAZA?
Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.
How current is the construction progress shown for SAIPLAZA?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at SAIPLAZA?
The professionals named in the filing: Architect: LAXMIKANT NAIKWADI; Engineer: Vijay Ranade; Chartered Accountant: Vikas Naikwadi. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in SAIPLAZA?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.