ReraGenieLog inGet a buyer report

Home / Browse projects / Nagpur, Maharashtra / SAILEELA RESIDENCY

Registered No litigation declared Plotted project

SAILEELA RESIDENCY

By M/s SHREE SAILEELA INFRASTRUCTURE

RG-MH-95893 · RERA P50500050879 · Last updated on MahaRERA portal: 20 Apr 2026

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form

Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against every project registered within 2 km.

See what the report covers Free either way: or have every new Nagpur registration emailed to you, free during the pilot beta.
Dec 2026Possession promisedno revision filed
2 of 98Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 77 documents Report an error

SAILEELA RESIDENCY is a Plotted project by M/s SHREE SAILEELA INFRASTRUCTURE in Nagpur, Maharashtra, registered with MahaRERA as P50500050879 on 15 May 2023. Possession is promised by 31 Dec 2026. 96 of the 98 units on this registration are recorded sold or booked.

At a glance

Project

  • NameSAILEELA RESIDENCY
  • TypePlotted
  • Location
    • P.H. NO. 74
    • MOHGAON
    • Nagpur (Rural)
    • Nagpur
    • 441110
  • Pincode441110
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P50500050879
  • ReraGenie IDRG-MH-95893

Builder

  • NameM/s SHREE SAILEELA INFRASTRUCTURE
  • Entity typePartnership
  • PartnersAKHILKUMAR UMESHCHANDRA LADDHA, DINESH JAGADISHCHANDRA LADDHA, APURV SACHIN MAMIDWAR

Key dates

this monthRegisteredMay 2023PromisedDec 2026

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on15 May 2023
  • Promised completion31 Dec 2026
  • Revised completionNone
  • BuildingsNot stated in filing
  • Documents filed77 files

Current status

98%96 of 98 units booked
76.5%Work done, per cost certificate

Figures as on 20 Apr 2026, this project's latest MahaRERA filing.

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 20 Apr 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

NA Plot Without Structure:

ActivityProgress
ExcavationNot applicable
Basement (if any)Not applicable
Podiums (if any)Not applicable
PlinthNot applicable
Stilt FloorNot applicable
Slabs of Super StructureNot applicable
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/PremisesNot applicable
Sanitary Fittings within the flats / premisesNot applicable
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water TanksNot applicable
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.Not applicable
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.Not applicable

Progress on shared amenities15

As on 20 Apr 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes95%
Water SupplyYes100%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes65%
Storm Water DrainsYes100%
Landscaping & Tree PlantingYes0%
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterYes100%
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingNoNot applicable
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsNoNot applicable
Electrical meter room, sub-station, receiving stationYes100%
Aggregate area of recreational Open SpaceYes90%
Open ParkingNoNot applicable

Land and ownership

Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area16,967 sq m
Land owned byThe promoter
Named landownersNone
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on6 Aug 2025

Approvals and building plan

Sanctioning authorityNagpur Metropolitan Region Development Authority
Permissible FSI27174.46
Proposed, not sanctioned27,174 sq m

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchAKARSHAN BUSIPLEX, 26, CENTRAL BAZAR ROAD, RAMDASPETH, NAGPUR - 440010
Estimated costRs 328
Cost incurredRs 251
Work done76.46%
BuildingWingEstimatedIncurred
-NARs 328Rs 251

Certifying professionals and partners6

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectDEVIDAS BORKAR
ArchitectYASH GOVINDWAR
EngineerRAMDAS WAGH
Chartered AccountantRACHANA AGRAWAL
Chartered AccountantA.S.MUNDADA & CO.
Chartered AccountantAdhish Agarwal and Co
PartnerRole in project
M/s SHREE SAILEELA INFRASTRUCTURE-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 7 Apr 2023
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 3 Feb 2023
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 3 Feb 2023
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 3 Feb 2023Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Dec 2026

Documents filed77

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: FORM-1 SAILEELA MAR-26.pdf20 Apr 2026
Withdrawal Update Form 2File: FORM-2 SAILEELA MAR-26.pdf20 Apr 2026
Withdrawal Update Form 3File: FORM-3 SAILEELA MAR-26_compressed.pdf20 Apr 2026
Withdrawal Update Form 1File: FORM-1 SAILEELA DEC-25.pdf20 Jan 2026
Withdrawal Update Form 2File: FORM-2 SAILEELA DEC-25.pdf20 Jan 2026
Withdrawal Update Form 3File: FORM-3 SAILEELA DEC-25.pdf20 Jan 2026
Withdrawal Update Form 1File: SHREE SAILEELA INFRA Form 1 sept 25.pdf20 Oct 2025
Withdrawal Update Form 2File: SHREE SAILEELA INFRA Form2 sept 25.pdf20 Oct 2025
Withdrawal Update Form 3File: SHREE SAILEELA INFRA Form 3 sept 25.pdf20 Oct 2025
Form 2A (FY 2024-2025)File: FORM 2A SAI LEELA_compressed.pdf30 Sep 2025
Form 5 (FY 2024-2025)File: Form 5 saileela_compressed.pdf30 Sep 2025
Withdrawal Update Form 1File: FORM 1 YASH GOVINDWAR ARCHITECH cert june25.pdf16 Sep 2025
Withdrawal Update Form 2File: Engineers Certificate - Mohagaon.pdf16 Sep 2025
Withdrawal Update Form 3File: FORM-3 SAILEELA.pdf16 Sep 2025
Form 1File: FORM 1 YASH GOVINDWAR ARCHITECH cert june25.pdf4 Aug 2025
Form 3File: FORM-3 SAILEELA.pdf4 Aug 2025
Disclosure of Sold and Booked InventoryFile: SOLD BOOKED INVENTORY SAILEELA.pdf4 Aug 2025
Form 2File: FORM-2 SAILEELA 30JUN25.pdf4 Aug 2025
Form 1File: YASH GOVINDWAR ARCHITECH cert mar25.pdf23 Jul 2025
Form 2File: saileela ENGINEER CERTIFICATE MARCH25.pdf23 Jul 2025
Form 3File: Saileela CA CERTIFICATE mar25.pdf23 Jul 2025
Disclosure of Sold and Booked InventoryFile: SOLD BOOK INVENTORY OF SSI march25.pdf23 Jul 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Sai Leela residency from1 dec24.pdf24 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Sai Leela residency from1 dec24.pdf24 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: saileela residency from2 dec24.pdf24 Jan 2025
Disclosure of sold/ booked inventoryFile: sold unsold inventory saileela dec24.pdf24 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: saileela form-1 30 SEPT 23.pdf18 Dec 2024
Disclosure of sold/ booked inventoryFile: sold unsold inv sept 24.pdf9 Dec 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Saileela 30 June 2024.pdf6 Dec 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Saileela 30 sept 2024.pdf6 Dec 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 SaiLeela Mar 2024_compressed.pdf6 Dec 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Saileela 30 Dec 2023.pdf6 Dec 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Saileela 30 sept 2023.pdf6 Dec 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Saileela June 2023_compressed.pdf6 Dec 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Form 5 Saileela 23 to 24.pdf6 Dec 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: saileela form1 30june23.pdf23 Nov 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: saileela form 2 30sept23.pdf23 Nov 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: saileela form1 30dec23.pdf23 Nov 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: sailee form1 31mar24.pdf23 Nov 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: saileela form1 30June24.pdf23 Nov 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: saileela form1 30sept24.pdf23 Nov 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: saileela form 2 30june23.pdf23 Nov 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: saileela form 2 30sept23.pdf23 Nov 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: saileela form-2 31dec23.pdf23 Nov 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: saileela form-2 31Mar24.pdf23 Nov 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: saileela form 2 30june4.pdf23 Nov 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: saileela form 2 30sept24.pdf23 Nov 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: saileela form-2A 30jUN24.pdf23 Nov 2024
Declaration about Commencement CertificateFile: PH No declaration.pdf19 Apr 2023
Copy of the legal title reportFile: Title Report Both Lands Saileela_compressed.pdf7 Apr 2023
Proforma of Agreement for saleFile: Sai Leela Proforma Agrt for Sale.pdf22 Mar 2023
Details of encumbrances concerned to FinanceFile: Financial.pdf10 Mar 2023
Details of encumbrances concerned to FinanceFile: Legal.pdf10 Mar 2023
Details of encumbrances concerned to LegalFile: Financial.pdf10 Mar 2023
Details of encumbrances concerned to LegalFile: Legal.pdf10 Mar 2023
CERSAI detailsFile: CERSAI_Search_Report_200262093272_For_Asset_Based_Search_04_03_2023_17_57_15_664.pdf10 Mar 2023
CERSAI detailsFile: CERSAI_Search_Report_200262094584_For_Asset_Based_Search_04_03_2023_18_05_01_719.pdf10 Mar 2023
Disclosure of sold/ booked inventoryFile: Discloser of Sold_compressed.pdf10 Mar 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: Disclosure of Int Anilkumar Laddha.pdf10 Mar 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: Disclosure of Int Apurva Mamidwar.pdf10 Mar 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: Disclosure of Int Dinesh Laddha.pdf10 Mar 2023
Proforma of Allotment letterFile: Allotment Letter.pdf10 Mar 2023
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Declaration Bank Account final.pdf10 Mar 2023
Deviation Report with respect to Allotment letterFile: Deviation of Allotment.pdf10 Mar 2023
Deviation Report with respect to model copy of AgreementFile: SaiLeela Agrt for Sale.pdf10 Mar 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3.pdf14 Feb 2023
Layout approvalFile: Sai Leela - Map278_compressed (1).pdf3 Feb 2023
Building plan approval or NA orderFile: NA Order.pdf3 Feb 2023
PAN CardFile: Shree Saileela Infra - PAN.pdf3 Feb 2023
Copy of Layout Approval (in case of layout)File: Sai Leela - Map278_compressed (1).pdf3 Feb 2023
Building Plan Approval / NA Order for plotted developmentFile: NA Order.pdf3 Feb 2023
Commencement Certificates / NA Order for plotted developmentFile: NA Order.pdf3 Feb 2023
Declaration about Commencement CertificateFile: Commencement Cert declaration.pdf3 Feb 2023
Declaration in FORM BFile: Notarised Form B Sai Leela_organized_compressed.pdf3 Feb 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate - Mohgaon.pdf3 Feb 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineers Certificate - Mohagaon.pdf3 Feb 2023
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: SSLI Bank Detail.pdf3 Feb 2023

How this compares with Nagpur

98%of this project is bookeddistrict median 35%
13%of Nagpur projects moved their completion datethis one has not
22%of Nagpur registrations have lapsed or been cancelledthis one is on the register

Computed across the 2,800+ Nagpur projects on ReraGenie, from their own filings.

Free monthly report: Nagpur on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep SAILEELA RESIDENCY on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near MOHGAON2,800+ in Nagpur

Builder: M/s SHREE SAILEELA INFRASTRUCTURE

M/s SHREE SAILEELA INFRASTRUCTURE has 1 registration on MahaRERA, including SAILEELA RESIDENCY. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Nagpur district page.

Frequently asked questions

What are my rights if SAILEELA RESIDENCY is delayed beyond 31 Dec 2026?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of SAILEELA RESIDENCY?

The registered promoter entity is M/s SHREE SAILEELA INFRASTRUCTURE, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in SAILEELA RESIDENCY?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for SAILEELA RESIDENCY?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at SAILEELA RESIDENCY?

The professionals named in the filing: Architect: DEVIDAS BORKAR; Architect: YASH GOVINDWAR; Engineer: RAMDAS WAGH; Chartered Accountant: RACHANA AGRAWAL; Chartered Accountant: A.S.MUNDADA & CO.; Chartered Accountant: Adhish Agarwal and Co. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in SAILEELA RESIDENCY?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About SAILEELA RESIDENCY. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save SAILEELA RESIDENCY to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.