Registration lapsed No litigation declared Residential / Group Housing project

Sai Vihar

By Universal Infracon

RG-MH-60961 · RERA P51700035140 · Last updated on MahaRERA portal: 1 Jul 2026

Source: official MahaRERA filing

Red flags

  • Registration lapsed
  • Possession 10 months past the filed date
  • Completion date moved by 18 months
  • 2 extensions taken

Clear

  • No litigation declared
  • No complaints on record
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form

4 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Thane registration emailed to you, free during the pilot beta.
Dec 2025Possession promised10 months past this date
5 of 11Construction stages donefurthest along: Internal walls, 40%
20 of 28Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 78 documents Report an error

Sai Vihar is a Residential / Group Housing project by Universal Infracon in Thane, Maharashtra, registered with MahaRERA as P51700035140 on 10 May 2022. Possession was promised by 31 Dec 2025 and is now 10 months past that date. The completion date has moved by 18 months from the original filing. 8 of the 28 units on this registration are recorded sold or booked, and 5 of 11 construction stages are filed complete.

At a glance

Project

  • NameSai Vihar
  • TypeResidential / Group Housing
  • Location
    • Hissa No -2/B/25
    • 2/B/1
    • 2/B/53
    • 2/B/45
    • Ulhasnagar -3
    • Ulhasnagar (M Corp.)
    • Ulhasnagar
    • Thane
    • 421003
  • Pincode421003
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51700035140
  • ReraGenie IDRG-MH-60961

Builder

  • NameUniversal Infracon
  • Entity typePartnership
  • PartnersVasant Pradhan Bhanushali, Sopan Keshav Kale

Key dates

10 months past promisethis monthRegisteredMay 2022First promiseJun 2024Revised toDec 2025

Key facts

Registration and timeline

  • StatusRegistration lapsed
  • Registered on10 May 2022
  • Promised completion31 Dec 2025
  • Revised completionRevised to 31 Dec 2025 (originally 30 Jun 2024)
  • Buildings1 building record
  • Documents filed78 files

Current status

29%8 of 28 units booked

Figures as on 1 Jul 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Sai ViharNA9728028

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 1 Jul 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

5 of 11 construction stages are filed complete. The stage furthest along is Internal walls, at 40%.

Sai Vihar: 49% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises40%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 1 Jul 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsNoNot applicable
Landscaping & Tree PlantingYes0%
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes0%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsNoNot applicable
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Parking filed1

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots1
Closed/Covered1

Land and ownership5

MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area460 sq m
Land owned byThe promoter, with other names on the file
Named landowners5
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on8 Jul 2025
LandownerVillageDistrict
Dilip Shankar ShindeAmbiwaliThane
Indu Shankar ShindeBorivaliMumbai Suburban
Uma Shankar ShindeBorivaliMumbai Suburban
Nirmala Sudam ShindeAmbiwaliThane
Mayur Sudam ShindeAmbiwaliThane

Approvals and building plan

Sanctioning authorityUlhasnagar Municipal Corporation
Permissible FSI1080.88
Proposed, not sanctioned1,081 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branch1,2, 19,20,Kalandi Building Apmc Market Vashi Navi Mumbai -400705

Certifying professionals and partners4

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectR. V. Associates
EngineerSK Consultants & Engineers
Chartered AccountantN B Sayed & Associates
Chartered AccountantNB Sayed & Associates
PartnerRole in project
Universal Infracon-

Extensions applied for2

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EXT51700019230Jun 2024 → Jun 2025

Reason as filed by the promoterIn accordance with circular no 28, we hereby apply for extension of our project u/s 6 in Format B. The project was delayed for reasons beyond our control on account of various reasons and more particularly on account of the pandemic of Covid-19.

EXT51700028352Jun 2024 → Dec 2025

Reason as filed by the promoterWe apologize for the delay in the completion of the project and the submission of this request. The delay has occurred due to unforeseen circumstances, including procurement issues, financial constraints, and site challenges. Despite these setbacks, we are working diligently to address these issues and complete the remaining work. Given the circumstances, we kindly request an extension until 31-12-2025 to complete the project and fulfil all regulatory requirements

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 14 Apr 2022
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 8 Apr 2022
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 8 Apr 2022
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 8 Apr 2022Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot on the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

Documents filed78

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: Form 1 - Sai Vihar as on Sep 2024.pdf1 Jul 2026
Withdrawal Update Form 1File: Form 1 - Sai Vihar as on Sep 2024.pdf1 Jul 2026
Withdrawal Update Form 1File: Form 1 - Sai Vihar as on Sep 2024.pdf1 Jul 2026
Withdrawal Update Form 2File: Form 2 - Sai Vihar as on Sep 2024.pdf1 Jul 2026
Withdrawal Update Form 2File: Form 2 - Sai Vihar as on Sep 2024.pdf1 Jul 2026
Withdrawal Update Form 2File: Form 2 - Sai Vihar as on Sep 2024.pdf1 Jul 2026
Withdrawal Update Form 3File: Form 3 of Sai Vihar as on 30th September 2024.pdf1 Jul 2026
Withdrawal Update Form 3File: Form 3 of Sai Vihar as on 30th September 2024.pdf1 Jul 2026
Withdrawal Update Form 3File: Form 3 of Sai Vihar as on 30th September 2024.pdf1 Jul 2026
Disclosure of sold/ booked inventoryFile: _4 Disclosure of sold_ booked inventory (2).pdf28 May 2025
Other - TechnicalFile: Pert Chart.pdf28 May 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: img20250523_18164884_organized (1).pdf28 May 2025
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: SV - Form 5 23-24.pdf28 May 2025
Declaration in FORM BFile: FORM-B_11zon.pdf20 May 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Sept 24.pdf20 May 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Dec 24_11zon.pdf20 May 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Mar 25_11zon.pdf20 May 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - 31-03-2025.pdf20 May 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - 31-03-2025.pdf20 May 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - Mar 25.pdf20 May 2025
Disclosure of sold/ booked inventoryFile: Circular 29 - 31-03-2025.pdf20 May 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - Sai Vihar as on March 2025.pdf2 May 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - Sai Vihar as on March 2025.pdf2 May 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - Sai Vihar as on Dec 2024.pdf11 Feb 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - Sai Vihar as on Dec 2024.pdf11 Feb 2025
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Form 5 of Sai Vihar FY 2023-24.pdf11 Feb 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 - Sai Vihar as on Sep 2024.pdf24 Oct 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 of Sai Vihar as on 30th September 2024.pdf20 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - Sai Vihar as on Sep 2024.pdf20 Oct 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 - Sai Vihar as on June 2024.pdf20 Jul 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2- Sai Vihar as on June 2024.pdf20 Jul 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Sai Vihar as on 30-06-2024.pdf20 Jul 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2- Sai Vihar as on March 2024.pdf16 Apr 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Sai Vihar as on 31-03-2024.pdf16 Apr 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 20240412011617.pdf12 Apr 2024
Disclosure of sold/ booked inventoryFile: WhatsApp Image 2024-04-12 at.pdf12 Apr 2024
Declaration in FORM BFile: Form B.pdf2 Mar 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Dec.pdf2 Mar 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Dec.pdf2 Mar 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Form 2A 22-23.pdf2 Mar 2024
Disclosure of sold/ booked inventoryFile: CIrcular 29.pdf2 Mar 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Dec.pdf2 Mar 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: Annexure A.pdf2 Mar 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Form 5 22-23.pdf2 Mar 2024
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Format A.pdf2 Mar 2024
Disclosure of sold/ booked inventoryFile: Circular 29 - Sai Vihar as on Dec 2023.pdf22 Feb 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - Sai Vihar as on Dec 2023.pdf2 Feb 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - Sai Vihar as on Dec 2023.pdf2 Feb 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - Sai Vihar as on Dec 2023.pdf2 Feb 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2- Sai Vihar as on Sept 2023.pdf20 Oct 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Sai Vihar as on 30-09-2023.pdf19 Oct 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2- Sai Vihar as on 31-12-2022.pdf15 Sep 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2- Sai Vihar as on 24-03-2023.pdf15 Sep 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2- Sai Vihar as on June 2023.pdf15 Sep 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3- Sai Vihar as on 31-12-2022.pdf15 Sep 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3- Sai Vihar as on 24-03-2023.pdf15 Sep 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3- Sai Vihar as on 30-06-2023.pdf15 Sep 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Form 5- Sai Vihar as on 2022-23.pdf15 Sep 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1- Sai Vihar as on 05-07-2023.pdf27 Jul 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Sai Vihar - Form 1.pdf18 May 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Sai Vihar as on September 2022.pdf26 Nov 2022
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Sai Vihar as on September 2022_compressed.pdf26 Nov 2022
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Sai Vihar as on August 2022.pdf11 Oct 2022
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - Sai Vihar as on 31-08-2022.pdf11 Oct 2022
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: ilovepdf_merged (5).pdf27 Apr 2022
Proforma of Allotment letterFile: agreement of sale Sai Vihar.pdf27 Apr 2022
Copy of the legal title reportFile: Title Certificate Ulhasnagar_11zon.pdf14 Apr 2022
CERSAI detailsFile: CERSAI_Search_Report_200235185470_For_Asset_Based_Search_14_04_2022_19_38_13_561.pdf14 Apr 2022
Proforma of Allotment letterFile: Allotment Letter.pdf14 Apr 2022
Declaration in FORM BFile: Affidavit cum Deeclaration_compressed.pdf12 Apr 2022
Details of encumbrancesFile: Universal infracom Encumbrance.pdf11 Apr 2022
Declaration about Commencement CertificateFile: Universal infracom CC Declaration.pdf11 Apr 2022
Layout approvalFile: Plan_compressed.pdf8 Apr 2022
Building plan approvalFile: Plan_compressed.pdf8 Apr 2022
PAN CardFile: universal pan card.pdf8 Apr 2022
Copy of Layout Approval (in case of layout)File: Plan_compressed.pdf8 Apr 2022
Building Plan Approval / NA Order for plotted developmentFile: Plan_compressed.pdf8 Apr 2022
Commencement Certificates / NA Order for plotted developmentFile: CC_compressed.pdf8 Apr 2022

How this compares with Thane

29%of this project is bookeddistrict median 26%
24%of Thane projects moved their completion datethis one moved by 18 months
23%of Thane registrations have lapsed or been cancelledthis one is among them

Computed across the 7,600+ Thane projects on ReraGenie, from their own filings.

Free monthly report: Thane on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep Sai Vihar on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Ulhasnagar -37,600+ in Thane

2 kmSai ViharCompleted 93Lapsed / revoked 39Other 59Dot size: filed unitsN

Filed coordinates, straight-line distance. 191 registered projects within 2 km.

Builder: Universal Infracon

Universal Infracon has 1 registration on MahaRERA, including Sai Vihar. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Thane district page.

Frequently asked questions

What does it mean that Sai Vihar shows as registration lapsed on MahaRERA?

A registration runs until the completion date the promoter declared. If the project is neither completed nor extended by then it lapses, and a de-registration or revocation ends it by order. In every case the promoter may no longer legally advertise, market or sell in the project, and the Authority can act under section 7 against a defaulting promoter. What it does not do is cancel an agreement for sale you have already signed, or extinguish your section 18 right to delay interest or refund; those run from your agreement, not from the registration. Get the current position from the promoter in writing, verify it on the MahaRERA portal, and take legal advice before paying any further instalment.

What are my rights if Sai Vihar is delayed beyond 31 Dec 2025?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Sai Vihar?

The registered promoter entity is Universal Infracon, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Sai Vihar?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for Sai Vihar?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Sai Vihar?

The professionals named in the filing: Architect: R. V. Associates; Engineer: SK Consultants & Engineers; Chartered Accountant: N B Sayed & Associates; Chartered Accountant: NB Sayed & Associates. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Sai Vihar?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Sai Vihar. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Sai Vihar to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.