ReraGenieLog inGet a buyer report

Home / Browse projects / Thane, Maharashtra / SHARDA ROYCE

Completed No litigation declared Others project

SHARDA ROYCE

By SHARDA HOMES

RG-MH-06158 · RERA P51700052697 · Last updated on MahaRERA portal: 20 Apr 2026

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form
  • Recorded completed on MahaRERA

Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against every project registered within 2 km.

See what the report covers Free either way: or have every new Thane registration emailed to you, free during the pilot beta.
Dec 2028Possession promisedregistration recorded completed
3 of 11Construction stages donefurthest along: Basement (if any), 95%
59 of 105Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 81 documents Report an error

SHARDA ROYCE is a Others project by SHARDA HOMES in Thane, Maharashtra, registered with MahaRERA as P51700052697 on 22 Sep 2023. The registration is recorded completed; possession was promised by 31 Dec 2028. 46 of the 105 units on this registration are recorded sold or booked, and 3 of 11 construction stages are filed complete.

At a glance

Project

  • NameSHARDA ROYCE
  • TypeOthers
  • Location
    • Plot No 701 and 704
    • Section 7-B
    • CTS No 8636
    • 8639
    • 8640
    • 8641
    • 31198
    • 31204
    • Near Aman Talkies Road
    • Ulhasnagar
    • Ulhasnagar (M Corp.)
    • Thane
    • 421003
  • Pincode421003
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51700052697
  • ReraGenie IDRG-MH-06158

Builder

  • NameSHARDA HOMES
  • Entity typePartnership
  • GSTIN27AETFS4842M1Z4
  • PartnersBRIJESH RAMESH KUMAR NANDWANI, RAHUL BRIJESH NANDWANI

Key dates

this monthRegisteredSep 2023PromisedDec 2028Recorded completed

Key facts

Registration and timeline

  • StatusCompleted
  • Registered on22 Sep 2023
  • Promised completion31 Dec 2028
  • Revised completionNone
  • Buildings1 building record
  • Documents filed81 files

Current status

44%46 of 105 units booked
76.6%Work done, per cost certificate

Figures as on 20 Apr 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
SHARDA ROYCENA18168421105

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 20 Apr 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

3 of 11 construction stages are filed complete. The stage furthest along is Basement (if any), at 95%.

SHARDA ROYCE: 63% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)95%
Podiums (if any)75%
Plinth100%
Stilt Floor90%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises50%
Sanitary Fittings within the flats / premises15%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks30%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.25%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.10%

Progress on shared amenities15

As on 20 Apr 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes35%
Water SupplyYes30%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes50%
Storm Water DrainsYes30%
Landscaping & Tree PlantingYes0%
Street LightingYes25%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterYes20%
Solid Waste Management And DisposalYes0%
Water conservation /Rain water harvestingYes30%
Energy managemcntYes0%
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes15%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingYes10%

Parking filed60

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots60
Closed/Covered54
Open Space6

Land and ownership1

MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area1,967 sq m
Land owned byThe promoter, with other names on the file
Named landowners1
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on31 Oct 2025
LandownerVillageDistrict
JAI SAI BABA CO-OPERATIVE HOUSING SOCIETY LIMITEDUlhasnagar (M Corp.)Thane

Approvals and building plan

Sanctioning authorityUlhasnagar Mahanagar Palika
Permissible FSI8956.22
Proposed, not sanctioned8,956 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchBalani Arcade, Plot No 680, Sadhu Vaswani Road, Near Chopra Court, Ulhasnagar - 421003
Estimated costRs 25.50 cr
Cost incurredRs 19.54 cr
Work done76.63%
BuildingWingEstimatedIncurred
SHARDA ROYCENARs 23.25 crRs 18.01 cr
-NARs 2.25 crRs 1.53 cr

Certifying professionals and partners4

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectPrime Consultants
EngineerPrime Consultants
Chartered AccountantMukesh Gurnani
Chartered AccountantVRP & Associates
PartnerRole in project
SHARDA HOMES-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 29 Jul 2023
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 1 Jun 2024
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 1 Jun 2024
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 29 Jul 2023Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot on the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

Documents filed81

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 81 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: Form 1 SAI BABA CHS 30092025 Signed.pdf20 Apr 2026
Withdrawal Update Form 2File: Form 2 Engg cert Q3.pdf20 Apr 2026
Withdrawal Update Form 3File: Form 3 SH 30092025.pdf20 Apr 2026
Occupational CertificateFile: confirmation to RERA for completion of JSB.pdf17 Apr 2026
Withdrawal Update Form 1File: Form 1 SAI BABA CHS 30092025 Signed.pdf20 Jan 2026
Withdrawal Update Form 2File: Form 2 Engg cert Q3.pdf20 Jan 2026
Withdrawal Update Form 3File: Form 3 SH 30092025.pdf20 Jan 2026
Occupational CertificateFile: Cert_FO_555008_369rDaRzSign.pdf20 Jan 2026
Form 5 (FY 2024-2025)File: Form 5 Sharda Homes Signed.pdf30 Sep 2025
Form 1File: Form 1 Shard Homes.pdf20 Jul 2025
Form 2File: Form 2 Sharda Homes.pdf20 Jul 2025
Form 3File: Form 3 SH 31032025.pdf20 Jul 2025
Disclosure of Sold and Booked InventoryFile: Disclosure of Sold-Booked Inventory pd.pdf20 Jul 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Sharda Homes Q4.pdf19 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Sharda Homes Q4.pdf19 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Sharda Homes Form 3 SH 31122024.pdf22 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: SHARDA HOMES ARCHITECT CER.pdf18 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Sharda Royce Form 2 Engg cert.pdf18 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1.pdf2 Dec 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2.pdf2 Dec 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: signed Form 5 Sharda Homes.pdf29 Nov 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: home form 1.pdf16 Oct 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 SH 30062024.pdf16 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: home form 2.pdf16 Oct 2024
Details of encumbrances concerned to FinanceFile: noo encumb 2.pdf9 Oct 2024
Details of encumbrances concerned to LegalFile: noo encumb 2.pdf9 Oct 2024
Proforma of Agreement for saleFile: AFS.pdf9 Oct 2024
Layout approvalFile: Sheet 1 MYSCAN_20230922_0013_11zon.pdf1 Jun 2024
Building plan approvalFile: Sheet 2 MYSCAN_20230922_0004_11zon.pdf1 Jun 2024
Building plan approvalFile: Sheet 3 MYSCAN_20230922_0003_11zon.pdf1 Jun 2024
Building plan approvalFile: Sheet 4 MYSCAN_20230922_0007_11zon.pdf1 Jun 2024
Building plan approvalFile: Sheet 5 MYSCAN_20230922_0008_11zon.pdf1 Jun 2024
Building plan approvalFile: Sheet A1 MYSCAN_20230922_0011_11zon.pdf1 Jun 2024
Copy of Layout Approval (in case of layout)File: Sheet 1 MYSCAN_20230922_0013_11zon.pdf1 Jun 2024
Building Plan Approval / NA Order for plotted developmentFile: Sheet 2 MYSCAN_20230922_0004_11zon.pdf1 Jun 2024
Building Plan Approval / NA Order for plotted developmentFile: Sheet 3 MYSCAN_20230922_0003_11zon.pdf1 Jun 2024
Building Plan Approval / NA Order for plotted developmentFile: Sheet 4 MYSCAN_20230922_0007_11zon.pdf1 Jun 2024
Building Plan Approval / NA Order for plotted developmentFile: Sheet 5 MYSCAN_20230922_0008_11zon.pdf1 Jun 2024
Building Plan Approval / NA Order for plotted developmentFile: Sheet A1 MYSCAN_20230922_0011_11zon.pdf1 Jun 2024
Declaration about Commencement CertificateFile: CC 13102023.pdf1 Jun 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Sharda Homes CA Certificate Signed.pdf26 Feb 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Q2.PDF23 Jan 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Architect cert Q3.pdf23 Jan 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Q2.PDF23 Jan 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Engg cert Q3.pdf23 Jan 2024
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: 4 Bank Declaration.pdf13 Dec 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1.pdf18 Oct 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2.pdf18 Oct 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Signed.pdf18 Oct 2023
Proforma of Agreement for saleFile: Draft AFS 08092023.pdf8 Sep 2023
Details of encumbrances concerned to FinanceFile: Legal Encumbrance Report.pdf5 Sep 2023
Details of encumbrances concerned to LegalFile: Legal Encumbrance Report.pdf5 Sep 2023
Other - LegalFile: Legal Encumbrance Report.pdf5 Sep 2023
CERSAI detailsFile: CERSAI_Search_Report_200278319689_For_Asset_Based_Search_24_08_2023_19_11_36_779.pdf24 Aug 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Sharda Homes.pdf24 Aug 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: Annexure A-1 Brijesh.pdf24 Aug 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: Annexure A-2 Rahul.pdf24 Aug 2023
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Bank Declaration.pdf24 Aug 2023
Details of encumbrances concerned to FinanceFile: No Encumbrance.pdf17 Aug 2023
Details of encumbrances concerned to LegalFile: No Encumbrance.pdf17 Aug 2023
Declaration about Commencement CertificateFile: Form D.pdf17 Aug 2023
Declaration in FORM BFile: Form B Rahul Nandwani.pdf17 Aug 2023
CERSAI detailsFile: CERSAI Declaration.pdf17 Aug 2023
Proforma of Allotment letterFile: Allotment Letter.pdf17 Aug 2023
Deviation Report with respect to Allotment letterFile: No Deviation Wrt Allotment.pdf17 Aug 2023
Deviation Report with respect to model copy of AgreementFile: No Deviation wrt Agreement.pdf17 Aug 2023
Layout approvalFile: sai baba plan no 1 (2)_compressed.pdf29 Jul 2023
Building plan approvalFile: sai baba plan A1 (2)_compressed.pdf29 Jul 2023
Building plan approvalFile: sai baba plan no 1 (2)_compressed.pdf29 Jul 2023
Building plan approvalFile: sai babab plan no 2 (1)_compressed.pdf29 Jul 2023
Building plan approvalFile: SAI BABA PLAN NO 3 (1)_compressed.pdf29 Jul 2023
Building plan approvalFile: sai baba plan no 4 (1)_compressed.pdf29 Jul 2023
Copy of the legal title reportFile: Copy of the legal title report SBS.pdf29 Jul 2023
Copy of Layout Approval (in case of layout)File: sai baba plan no 1 (2)_compressed.pdf29 Jul 2023
Building Plan Approval / NA Order for plotted developmentFile: sai baba plan A1 (2)_compressed.pdf29 Jul 2023
Building Plan Approval / NA Order for plotted developmentFile: sai baba plan no 1 (2)_compressed.pdf29 Jul 2023
Building Plan Approval / NA Order for plotted developmentFile: sai babab plan no 2 (1)_compressed.pdf29 Jul 2023
Building Plan Approval / NA Order for plotted developmentFile: SAI BABA PLAN NO 3 (1)_compressed.pdf29 Jul 2023
Building Plan Approval / NA Order for plotted developmentFile: sai baba plan no 4 (1)_compressed.pdf29 Jul 2023
Commencement Certificates / NA Order for plotted developmentFile: SAI BABA 13 FL CC.pdf29 Jul 2023

How this compares with Thane

44%of this project is bookeddistrict median 26%
24%of Thane projects moved their completion datethis one has not
23%of Thane registrations have lapsed or been cancelledthis one is completed

Computed across the 7,600+ Thane projects on ReraGenie, from their own filings.

Free monthly report: Thane on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep SHARDA ROYCE on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Ulhasnagar7,600+ in Thane

2 kmSHARDA ROYCECompleted 34Lapsed / revoked 39Other 61Dot size: filed unitsN

Filed coordinates, straight-line distance. 134 registered projects within 2 km.

Builder: SHARDA HOMES

SHARDA HOMES has 1 registration on MahaRERA, including SHARDA ROYCE. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Thane district page.

Frequently asked questions

What are my rights if SHARDA ROYCE is delayed beyond 31 Dec 2028?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of SHARDA ROYCE?

The registered promoter entity is SHARDA HOMES, a partnership as per the filing. Its GSTIN 27AETFS4842M1Z4 can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in SHARDA ROYCE?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for SHARDA ROYCE?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at SHARDA ROYCE?

The professionals named in the filing: Architect: Prime Consultants; Engineer: Prime Consultants; Chartered Accountant: Mukesh Gurnani; Chartered Accountant: VRP & Associates. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in SHARDA ROYCE?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About SHARDA ROYCE. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save SHARDA ROYCE to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.