Home / Browse projects / Raigarh, Maharashtra / SAI TIRTH
SAI TIRTH
RG-MH-72158 · RERA P52000049621 · Last updated on MahaRERA portal: 27 May 2026
Source: official MahaRERA filing
Or get an email each time it changes, with the project watch
Red flags
- No red flags in this filing
Clear
- No litigation declared
- No complaints on record
- Completion date never moved
- Separate project account declared
- Allotment letter follows the model form
- All 2 earlier projects delivered on promise
Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against the promoter's 2 other registrations and every project registered within 2 km.
See what the report covers Free either way: or have every new Raigarh registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
SAI TIRTH is a Others project by DILIP WAMAN GADGIL in Raigarh, Maharashtra, registered with MahaRERA as P52000049621 on 22 Feb 2023. Possession is promised by 31 Dec 2029. 10 of the 10 units on this registration are recorded sold or booked, and 9 of 11 construction stages are filed complete.
At a glance
Project
- NameSAI TIRTH
- TypeOthers
- Location
- .
- Chambharkhind
- Mahad
- Raigarh
- 402301
- Pincode402301
- MapView location on Google Maps (as filed on RERA)
- RERA no.P52000049621
- ReraGenie IDRG-MH-72158
Key dates
Key facts
Registration and timeline
- StatusRegistered
- Registered on22 Feb 2023
- Promised completion31 Dec 2029
- Revised completionNone
- Buildings1 building record
- Documents filed108 files
Current status
Figures as on 27 May 2026, this project's latest MahaRERA filing.
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| SAI TIRTH | NA | 8 | 7 | 0 | 10 | 10 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building1
As on 27 May 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
9 of 11 construction stages are filed complete. The stage furthest along is Basement (if any), at 0%.
SAI TIRTH: 82% average across the applicable activities
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
Progress on shared amenities15
As on 27 May 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | No | Not applicable |
| Water Supply | Yes | 100% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 100% |
| Storm Water Drains | Yes | 100% |
| Landscaping & Tree Planting | Yes | 0% |
| Street Lighting | No | Not applicable |
| Community Buildings | No | Not applicable |
| Treatment And Disposal Of Sewage And Sullage Water | Yes | 100% |
| Solid Waste Management And Disposal | No | Not applicable |
| Water conservation /Rain water harvesting | No | Not applicable |
| Energy managemcnt | No | Not applicable |
| Fire protection and fire safety requirements | No | Not applicable |
| Electrical meter room, sub-station, receiving station | Yes | 100% |
| Aggregate area of recreational Open Space | No | Not applicable |
| Open Parking | No | Not applicable |
Parking filed137
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
Land and ownership
MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
| Building | Wing | Estimated | Incurred |
|---|---|---|---|
| SAI TIRTH | NA | Rs 26.59 cr | Rs 25.26 cr |
Certifying professionals and partners4
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | VIVEK VIDYADHAR PARANJAPE |
| Engineer | ASHISH WANKHADE |
| Chartered Accountant | AKSHAIDEEP SRIVASTAVA |
| Chartered Accountant | RITESH UPADHYAY |
| Partner | Role in project |
|---|---|
| DILIP WAMAN GADGIL | - |
Complaints filed with MahaRERA
No complaints on record against this registration.
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 29 Jan 2023 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 8 Feb 2023 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 29 Jan 2023 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 15 Feb 2023Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateNot due yet
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
possession is promised for 31 Dec 2029
Documents filed108
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 108 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Withdrawal Update Form 1File: FORM 1 Q1 25-26.pdf | 27 May 2026 |
| Withdrawal Update Form 1File: FORM 1 01 OCT 2025 TO 31 DEC 25.pdf | 27 May 2026 |
| Withdrawal Update Form 1File: FORM 1 1 JAN 26 TO 31 MARCH 26.pdf | 27 May 2026 |
| Withdrawal Update Form 2File: FORM-2 01 OCT 2025 TO 31 DEC 25.pdf | 27 May 2026 |
| Withdrawal Update Form 2File: FORM-2 01 OCT 2025 TO 31 DEC 25.pdf | 27 May 2026 |
| Withdrawal Update Form 2File: FORM 2 1 JAN 25 TO 31 MARCH 26.pdf | 27 May 2026 |
| Withdrawal Update Form 3File: FORM 3 1 OCT 25 TO 31 MARCH 26.pdf | 27 May 2026 |
| Withdrawal Update Form 3File: FORM 3 1 OCT 25 TO 31 MARCH 26.pdf | 27 May 2026 |
| Withdrawal Update Form 3File: FORM 3 1 OCT 25 TO 31 MARCH 26.pdf | 27 May 2026 |
| Form 1File: FORM 1 SAI TIRTH QUR JULY 25 TO SEP 25.pdf | 13 Jan 2026 |
| Form 2File: FORM 2 SAI TIRTH JULY 25 TO SEP 25.pdf | 13 Jan 2026 |
| Form 3File: FORM 3 SAI THIRTH JULY 25 TO SEP 25.pdf | 13 Jan 2026 |
| Disclosure of Sold and Booked InventoryFile: SOLD UNSOLD JULY 25 TO SEP 25.pdf | 13 Jan 2026 |
| Withdrawal Update Form 1File: FORM 1 Q1 25-26.pdf | 30 Aug 2025 |
| Withdrawal Update Form 2File: FORM 2 Q1 25-26.pdf | 30 Aug 2025 |
| Withdrawal Update Form 3File: FORM 3 Q1 25-26.pdf | 30 Aug 2025 |
| Form 1File: FORM 1 Q4 24-25.pdf | 19 Aug 2025 |
| Form 2File: FORM 2 Q4 24-25.pdf | 19 Aug 2025 |
| Form 3File: FORM 3 Q4 24-25.pdf | 19 Aug 2025 |
| Disclosure of Sold and Booked InventoryFile: SAI TITRH SOLD UNSOLD 31 MAR 2025.pdf | 19 Aug 2025 |
| Form 5 (FY 2022-2023)File: FORM 5 SAI TIRTH 01-04-22 TO 31-03-2023.pdf | 18 Aug 2025 |
| Form 5 (FY 2023-2024)File: FORM 5 SAI TIRTH 01-04-2023 TO 31-03-2024.pdf | 18 Aug 2025 |
| Form 5 (FY 2024-2025)File: FORM 5 SAI TIRTH 01-04-2024 TO 31-03-2025.pdf | 18 Aug 2025 |
| Form 1File: 2 Architect’s Certificate sai thirth.pdf | 9 Jul 2025 |
| Form 2File: 2 Engineer’s Certificate sai tirth.pdf | 9 Jul 2025 |
| Form 3File: 3 CA Certificate SAI TIRTH.pdf | 9 Jul 2025 |
| Disclosure of Sold and Booked InventoryFile: SAI TITRH SOLD - UNSOLD 1.pdf | 9 Jul 2025 |
| Form 1File: 2 Architect’s Certificate sai thirth.pdf | 9 Jul 2025 |
| Form 2File: 2 Engineer’s Certificate sai tirth.pdf | 9 Jul 2025 |
| Form 3File: 3 CA Certificate SAI TIRTH.pdf | 9 Jul 2025 |
| Disclosure of Sold and Booked InventoryFile: SAI TITRH SOLD - UNSOLD 1.pdf | 9 Jul 2025 |
| Form 1File: 3 Architect’s Certificate SAI TIRTH.pdf | 9 Jul 2025 |
| Form 2File: 2 Engineer’s Certificate sai tirth.pdf | 9 Jul 2025 |
| Form 3File: 3 CA Certificate SAI TIRTH.pdf | 9 Jul 2025 |
| Disclosure of Sold and Booked InventoryFile: SAI TITRH SOLD - UNSOLD 1.pdf | 9 Jul 2025 |
| Form 1File: 4 Architect’s Certificate SAI TIRTH.pdf | 9 Jul 2025 |
| Form 2File: 3 Engineer’s Certificate SAI TIRTH.pdf | 9 Jul 2025 |
| Form 3File: 3 CA Certificate SAI TIRTH.pdf | 9 Jul 2025 |
| Disclosure of Sold and Booked InventoryFile: SAI TITRH SOLD - UNSOLD 1.pdf | 9 Jul 2025 |
| Form 1File: 5 Architect’s SAI TIRTH.pdf | 9 Jul 2025 |
| Form 2File: 4 Engineer’s Certificate SAI TIRTH.pdf | 9 Jul 2025 |
| Form 3File: 3 CA Certificate SAI TIRTH.pdf | 9 Jul 2025 |
| Disclosure of Sold and Booked InventoryFile: SAI TITRH SOLD - UNSOLD 1.pdf | 9 Jul 2025 |
| Form 1File: 5 Architect’s SAI TIRTH.pdf | 9 Jul 2025 |
| Form 2File: 4 Engineer’s Certificate SAI TIRTH.pdf | 9 Jul 2025 |
| Form 3File: 4 CA Certificat SAI TIRTH.pdf | 9 Jul 2025 |
| Disclosure of Sold and Booked InventoryFile: SAI TITRH SOLD- UNSOLD 2.pdf | 9 Jul 2025 |
| Form 1File: 6 Architect’s Certificat SAI TIRTH.pdf | 9 Jul 2025 |
| Form 2File: 5 Engineer’s Certificate SAI TIRTH.pdf | 9 Jul 2025 |
| Form 3File: 4 CA Certificat SAI TIRTH.pdf | 9 Jul 2025 |
| Disclosure of Sold and Booked InventoryFile: SAI TITRH SOLD- UNSOLD 2.pdf | 9 Jul 2025 |
| Form 1File: 6 Architect’s Certificat SAI TIRTH.pdf | 9 Jul 2025 |
| Form 2File: 5 Engineer’s Certificate SAI TIRTH.pdf | 9 Jul 2025 |
| Form 3File: 5 CA Certificate SAI THIRTH.pdf | 9 Jul 2025 |
| Disclosure of Sold and Booked InventoryFile: SAI TITRH SOLD- UNSOLD 3.pdf | 9 Jul 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 SAI TIRTH QUE.pdf | 11 Feb 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM-2.pdf | 4 Feb 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 270125 RERA DOCUMENT 1.pdf | 28 Jan 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: SAI TIRTH.pdf | 16 Oct 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM-2.pdf | 14 Aug 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 RERA 020824.pdf | 5 Aug 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 SAI TIRTH.pdf | 19 Apr 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 SAI TIRTH.pdf | 17 Mar 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: SAI TIRTH FORM 1.pdf | 6 Mar 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM NO 3 SAI TIRTH.pdf | 13 Nov 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 061123 RERA DOCUMENT 1.pdf | 6 Nov 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM-2 SAI TIRTH.pdf | 4 Nov 2023 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: FORM-2 SAI TIRTH.pdf | 4 Nov 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: RERA DOCUMENT 3.pdf | 11 Aug 2023 |
| Commencement Certificates / NA Order for plotted developmentFile: DR CC.pdf | 15 Feb 2023 |
| Layout approvalFile: DSC_4507 copy (3).pdf | 8 Feb 2023 |
| Layout approvalFile: DSC_4513 copy.pdf | 8 Feb 2023 |
| Copy of Layout Approval (in case of layout)File: DSC_4507 copy (3).pdf | 8 Feb 2023 |
| Copy of Layout Approval (in case of layout)File: DSC_4513 copy.pdf | 8 Feb 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: DR CA 002.pdf | 8 Feb 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: DR CA 003.pdf | 8 Feb 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: DR CA 004.pdf | 8 Feb 2023 |
| Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: DR SEPARATE BANK ACCOUNT.pdf | 8 Feb 2023 |
| Building plan approvalFile: DR NA 0001.pdf | 29 Jan 2023 |
| Building plan approvalFile: DR NA 0002.pdf | 29 Jan 2023 |
Promoter's earlier projects2
As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.
| Project | Location | Flats | Status | Promised | Delivered |
|---|---|---|---|---|---|
| SAI PRASAD | NADGAON TARFE BIRWADI MAHAD RAIGAD | 48 | Ongoing | Dec 2027 | Dec 2027 |
| SAI KASTURI | NH 17 HIGHWAY MAHAD RAIGAD | 105 | Completed | May 2025 | Jan 2022 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Raigarh
Computed across the 5,900+ Raigarh projects on ReraGenie, from their own filings.
Free monthly report: Navi Mumbai and Raigad on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Built from this project's filings on the day you order, in plain language.
- Red flags and clear checks, the possession story, sanctions and sales, land and title, who you are dealing with
- Joined against the promoter's 2 other registrations and every project registered within 2 km, which the RERA portal never shows together
- All 108 filed documents as one ZIP, foldered, with a manifest
- The project watch below, included free for 90 days
Project watch
Only want to be told when something changes?
- An email each time this filing moves: new sales, a moved possession date, an extension, a complaint, the occupancy certificate
- Plain words, conditions that have happened marked in red
- A summary of everything that changed when the 90 days end
Keep SAI TIRTH on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near .5,900+ in Raigarh
Filed coordinates, straight-line distance. 49 registered projects within 2 km.
NEXA PRIME
NEXAFUTURITY LLP
CKC HUB
UDAY CHANDRAKANT PAYELKAR
CLOUD 9
NEELKANTH ENTERPRISES
LUCKY HOUSE
LUCKY GROUP
NITYA NIRGUN ENCLAVE
PRIYANKA PRASANT GUJAR
SAI SHRUSTHI
SKYLINE DEVELOPERS
See every Raigarh project, with the district possession charts
Builder: DILIP WAMAN GADGIL
DILIP WAMAN GADGIL has 3 registrations on MahaRERA, including SAI KASTURI and SAI PRASAD. Its filings disclose 2 earlier MahaRERA projects: declares 2 of 2 past projects completed on time. Read the full track record. See more projects on the Raigarh district page.
Frequently asked questions
What are my rights if SAI TIRTH is delayed beyond 31 Dec 2029?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of SAI TIRTH?
The registered promoter entity is DILIP WAMAN GADGIL, an individual as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in SAI TIRTH?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How current is the construction progress shown for SAI TIRTH?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at SAI TIRTH?
The professionals named in the filing: Architect: VIVEK VIDYADHAR PARANJAPE; Engineer: ASHISH WANKHADE; Chartered Accountant: AKSHAIDEEP SRIVASTAVA; Chartered Accountant: RITESH UPADHYAY. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in SAI TIRTH?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback