ReraGenieLog inGet a buyer report

Home / Browse projects / Raigarh, Maharashtra / SAI NANDANVAN

Registered No litigation declared Others project

SAI NANDANVAN

By STUTI DEVELOPERS

RG-MH-04127 · RERA P52000021188 · Last updated on MahaRERA portal: 25 Apr 2026

Source: official MahaRERA filing

Red flags

  • 1 complaint at MahaRERA

Clear

  • No litigation declared
  • Completion date never moved
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form

1 condition is on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Raigarh registration emailed to you, free during the pilot beta.
Dec 2026Possession promisedno revision filed
24 of 44Construction stages doneacross 4 buildings; furthest along: External plumbing and external plaster, 95%
14 of 65Units unsoldnot recorded sold or booked
1Complaints at MahaRERAon this registration
Jump to the 44 documents Report an error

SAI NANDANVAN is a Others project by STUTI DEVELOPERS in Raigarh, Maharashtra, registered with MahaRERA as P52000021188 on 14 Jun 2019. Possession is promised by 30 Dec 2026. 51 of the 65 units on this registration are recorded sold or booked, and 24 of 44 construction stages are filed complete. 1 complaint is on record with the regulator.

At a glance

Project

  • NameSAI NANDANVAN
  • TypeOthers
  • Location
    • DASTURI NAKA
    • DASTURI NAKA MAHAD
    • Mahad
    • Raigarh
    • 402301
  • Pincode402301
  • RERA no.P52000021188
  • ReraGenie IDRG-MH-04127

Builder

  • NameSTUTI DEVELOPERS
  • Entity typePartnership
  • PartnersDEVIDAS SURESH PANCHAL, CHETAN VISHNU UTEKAR, PAWANKUMAR SHANKARLAL JAIN, ASHISH RAMESH PATEL, VISANJI HARJI MAVANI, HITESH VISANJI MAVANI
  • Other registrations2 more →

Key dates

this monthRegisteredJun 2019PromisedDec 2026

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on14 Jun 2019
  • Promised completion30 Dec 2026
  • Revised completionNone
  • Buildings4 building records
  • Documents filed44 files

Current status

78%51 of 65 units booked
104.1%Work done, per cost certificate

Figures as on 25 Apr 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
SAI NANDANVAN A AND B WINGNA6620222
SAI NANDANVAN C WINGNA60011
SAI NANDANVAN D WINGNA5013013
SAI NANDANVAN F WINGNA5025429

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building4

As on 25 Apr 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

24 of 44 construction stages are filed complete across 4 buildings. The stage furthest along is External plumbing and external plaster, at 95%.

SAI NANDANVAN A AND B WING42%
ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises90%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks90%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.95%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.85%
SAI NANDANVAN C WING82%
ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
SAI NANDANVAN D WING70%
ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises80%
Sanitary Fittings within the flats / premises80%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks80%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.75%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.50%
SAI NANDANVAN F WING91%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Progress on shared amenities15

As on 25 Apr 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes100%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsNoNot applicable
Landscaping & Tree PlantingNoNot applicable
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalYes100%
Water conservation /Rain water harvestingYes100%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsNoNot applicable
Electrical meter room, sub-station, receiving stationYes70%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Parking filed4

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots4
Closed/Covered4
BuildingClosed/CoveredTotal
SAI NANDANVAN A AND B WING11
SAI NANDANVAN C WING11
SAI NANDANVAN D WING11
SAI NANDANVAN F WING11

Land and ownership2

MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area4,393 sq m
Land owned byThe promoter, with other names on the file
Named landowners2
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on24 Apr 2026
LandownerVillageDistrict
VIJAY SURESH BHODHEMahad (M Cl)Raigarh
MINAL VIJAY BHODEMahad (M Cl)Raigarh

Approvals and building plan

Sanctioning authorityMAHAD MUNICIPAL COUNCIL
Permissible FSI5211.49
Proposed, not sanctioned4,393 sq m
Buildings approved4
Buildings sanctioned4

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchMAHAD
Estimated costRs 55.51 cr
Cost incurredRs 57.79 cr
Work done104.11%
BuildingWingEstimatedIncurred
SAI NANDANVAN A AND B WINGNARs 13.69 crRs 14.26 cr
SAI NANDANVAN C WINGNARs 13.69 crRs 14.26 cr
SAI NANDANVAN D WINGNARs 13.69 crRs 14.26 cr
SAI NANDANVAN F WINGNARs 13.69 crRs 14.26 cr
-NARs 76.00 lakhRs 76.00 lakh

Certifying professionals and partners3

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectARSALAN PALLAWKAR PALLAWKAR
EngineerAGHARKAR CONSULTANTS
Chartered AccountantButala Trivedi and Associates llp Butala Trivedi and Associates llp
PartnerRole in project
STUTI DEVELOPERS-

Complaints filed with MahaRERA1

Case no.ComplainantRespondentFiled
CC12603340Vijay Suresh BodheSTUTI DEVELOPERS01/06/2026

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 3 Jun 2019
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 3 Jun 2019
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 3 Jun 2019
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 3 Jun 2019Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateOn the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    uploaded 23 Apr 2025

Documents filed44

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: FORM 1.pdf25 Apr 2026
Withdrawal Update Form 1File: FORM 1.pdf25 Apr 2026
Withdrawal Update Form 1File: ARCHITECT CERTIFICATE.pdf25 Apr 2026
Withdrawal Update Form 2File: FORM 2.pdf25 Apr 2026
Withdrawal Update Form 2File: FORM 2.pdf25 Apr 2026
Withdrawal Update Form 2File: ENGINEER CERTIFICATE.pdf25 Apr 2026
Withdrawal Update Form 3File: FORM 3.pdf25 Apr 2026
Withdrawal Update Form 3File: FORM 3.pdf25 Apr 2026
Withdrawal Update Form 3File: CA CERTIFICATE.pdf25 Apr 2026
Withdrawal Update Form 124 Apr 2026
Withdrawal Update Form 1File: FORM 1.pdf24 Apr 2026
Withdrawal Update Form 2File: FORM 2.pdf24 Apr 2026
Withdrawal Update Form 2File: FORM 2.pdf24 Apr 2026
Withdrawal Update Form 324 Apr 2026
Withdrawal Update Form 3File: FORM 3.pdf24 Apr 2026
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 (31-3-2024).pdf12 May 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 (31-6-2024).pdf12 May 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 (30-9-2024).pdf12 May 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 (31-12-2024).pdf12 May 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 (31-3-2025).pdf12 May 2025
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: FORM 5 (2023-2024).pdf26 Apr 2025
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: OC- BUILDING 2 C AND D (SAI NANDANVAN).pdf23 Apr 2025
Declaration about Commencement CertificateFile: DECLARATION REGARDING COMMENCEMENT CERTIFICATE.pdf21 Apr 2023
Disclosure of sold/ booked inventoryFile: SODL AND UNSOLD INVENTORY.pdf21 Apr 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: FORM 5 2019-2020.pdf21 Apr 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: FORM 5 2020-2021.pdf21 Apr 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: FORM 5 2021-2022.pdf21 Apr 2023
Building plan approvalFile: COPY OF LAYOUT PLAN (2).pdf3 Jun 2019
Layout approvalFile: COPY OF LAYOUT PLAN (2).pdf3 Jun 2019
PAN CardFile: STUTI DEVLOPERS PAN CARD.PDF3 Jun 2019
Copy of the legal title reportFile: search for sai nandanvan.pdf3 Jun 2019
Details of encumbrancesFile: details of Encumbrance.pdf3 Jun 2019
Copy of Layout Approval (in case of layout)File: COPY OF LAYOUT PLAN (2).pdf3 Jun 2019
Building Plan Approval (IOD)File: COPY OF LAYOUT PLAN (2).pdf3 Jun 2019
Commencement Certificates / NA Order for plotted developmentFile: BUILDING PERMISSION.PDF3 Jun 2019
Commencement Certificates / NA Order for plotted developmentFile: NA PERMISSION.pdf3 Jun 2019
Declaration in FORM BFile: Affidavit cum declaration.pdf3 Jun 2019
Certificates of CA (Form 3)File: SIGNED CA CERTIFICATE.pdf3 Jun 2019
Proforma of Allotment letterFile: APPLICATION FORM.pdf3 Jun 2019
OtherFile: SUPPLEMENTARY PARTNERSHIP DEED.pdf3 Jun 2019
OtherFile: POWER OF ATTORNEY FROM MAVANI TO UTEKAR, PANCHAL.pdf3 Jun 2019
OtherFile: PARTNERSHIP DEED.PDF3 Jun 2019
OtherFile: PARTNERSHIP DEED 2017.pdf3 Jun 2019
OtherFile: PARTNER SHIP DEED 2016.PDF3 Jun 2019

How this compares with Raigarh

78%of this project is bookeddistrict median 29%
20%of Raigarh projects moved their completion datethis one has not
26%of Raigarh registrations have lapsed or been cancelledthis one is on the register

Computed across the 5,900+ Raigarh projects on ReraGenie, from their own filings.

Free monthly report: Navi Mumbai and Raigad on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep SAI NANDANVAN on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near DASTURI NAKA MAHAD5,900+ in Raigarh

Builder: STUTI DEVELOPERS

STUTI DEVELOPERS has 3 registrations on MahaRERA, including SAI NANDANVAN and Godavari Co-Operative Housing Society Limited. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Raigarh district page.

Frequently asked questions

What are my rights if SAI NANDANVAN is delayed beyond 30 Dec 2026?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of SAI NANDANVAN?

The registered promoter entity is STUTI DEVELOPERS, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in SAI NANDANVAN?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How do I read the complaint cases filed against SAI NANDANVAN?

Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.

How current is the construction progress shown for SAI NANDANVAN?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at SAI NANDANVAN?

The professionals named in the filing: Architect: ARSALAN PALLAWKAR PALLAWKAR; Engineer: AGHARKAR CONSULTANTS; Chartered Accountant: Butala Trivedi and Associates llp Butala Trivedi and Associates llp. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in SAI NANDANVAN?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About SAI NANDANVAN. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save SAI NANDANVAN to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.