Home / Browse projects / Pune, Maharashtra / Sai Mystique Phase III Building L

Registered No litigation declared Residential / Group Housing project

Sai Mystique Phase III Building L

By Sai Shree Developers

RG-MH-16301 · RERA P52100025575 · Last updated on MahaRERA portal: 2 May 2026

Source: official MahaRERA filing

Red flags

  • Completion date moved by 42 months
  • 3 extensions taken

Clear

  • No litigation declared
  • No complaints on record
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form
  • All 1 earlier projects delivered on promise

2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.
Dec 2026Possession promisedmoved 42 months from the original
8 of 11Construction stages donefurthest along: Basement (if any), 0%
3 of 65Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 119 documents Report an error

Sai Mystique Phase III Building L is a Residential / Group Housing project by Sai Shree Developers in Pune, Maharashtra, registered with MahaRERA as P52100025575 on 1 Jul 2020. Possession is promised by 31 Dec 2026. The completion date has moved by 42 months from the original filing. 62 of the 65 units on this registration are recorded sold or booked, and 8 of 11 construction stages are filed complete.

At a glance

Project

  • NameSai Mystique Phase III Building L
  • TypeResidential / Group Housing
  • Location
    • Behind Ashok Leyland & podar International School
    • Ambegaon BK
    • Haveli
    • Pune
    • 411046
  • Pincode411046
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P52100025575
  • ReraGenie IDRG-MH-16301

Builder

  • NameSai Shree Developers
  • Entity typeOthers
  • Named personsM/S Mahalaxmi Land Developers by its Partner Vinodkumar J Mittal, M/S Mahalaxmi Land Developers By its Partner Ramesh Parasram Bhatia, M/S Mahalaxmi Land Developers By its Partner Sanjay Shradhanand Tyagi, M/S Mahalaxmi Land Developers By its Partner Rajeev Shradhanand Tyagi, Arun Ramchandra Adkar, Shailaja Arun Adkar, Rajashree Vallabh Benke, Atul Vallabh Benke, Amit Vallabh Benke, Mangala Suryakant Dhamale
  • Declared earlier projects1 →

Key dates

this monthRegisteredJul 2020First promiseJun 2023Revised toDec 2026

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on1 Jul 2020
  • Promised completion31 Dec 2026
  • Revised completionRevised to 31 Dec 2026 (originally 30 Jun 2023)
  • Buildings1 building record
  • Documents filed119 files

Current status

95%62 of 65 units booked

Figures as on 2 May 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Sai Mystique Phase III Building LNA121165065

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 2 May 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

8 of 11 construction stages are filed complete. The stage furthest along is Basement (if any), at 0%.

Sai Mystique Phase III Building L: 73% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Progress on shared amenities17

As on 2 May 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes100%
Water SupplyYes100%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsYes100%
Landscaping & Tree PlantingYes100%
Street LightingYes100%
Community BuildingsYes100%
Treatment And Disposal Of Sewage And Sullage WaterYes100%
Solid Waste Management And DisposalYes100%
Water conservation /Rain water harvestingYes100%
Energy managemcntYes100%
Fire protection and fire safety requirementsYes100%
Electrical meter room, sub-station, receiving stationYes100%
Aggregate area of recreational Open SpaceYes100%
Open ParkingYes100%
SWIMMING POOLYes100%
GYMNASIUMYes100%

Parking filed65

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots65
Closed/Covered48
Open Space17

Land and ownership

Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area670 sq m
Land owned byThe promoter
Named landownersNone
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on1 Oct 2024

Approvals and building plan

Sanctioning authorityCOLLECTOR OFFICE
Permissible FSI4236.18
Proposed, not sanctioned4,236 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchWARJE PUNE

Certifying professionals and partners6

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectAvinash Nawathe Architects
EngineerDNYANESHWAR MARUTI AWHALE
EngineerMahesh Kulkarni
Chartered AccountantVinod N Nikam & Co
Chartered AccountantPRAVIN B BHANDARI
Chartered AccountantPRADEEP B MORE
PartnerRole in project
Sai Shree Developers-

Extensions applied for3

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EXT52100018670Jun 2023 → Jun 2024

Reason as filed by the promoterThis has also affected our ability to achieve the statutory compliances required to apply for the completion certificate from the pmc

EA01102401863Jun 2023 → Dec 2026

Reason as filed by the promoterrequired extension because of 5 flat pending for sale

EXT52100024338Jun 2023 → Dec 2026

Reason as filed by the promoter10th July, 2024 To, MahaRERA Authority Mumbai, Subject: Clarification Regarding Part OC for Sai Mystique Phase III Building L (MahaRERA Registration Number: P52100025575) Dear Sir/Madam, We are writing to give clarification regarding the Part OC (Occupation Certificate) obtained from the Pune Municipal Corporation (PMC) for our project, Sai Mystique Phase III Building L, located in Ambegaon, Pune, under the jurisdiction of MahaRERA. We are pleased to inform you that we have successfully obtained Part OC for 60 out of the 65 flats in our building from PMC. Our initial application was for the en

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 15 Jun 2020
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 15 Jun 2020
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 15 Jun 2020
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 15 Jun 2020Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateOn the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    uploaded 14 Dec 2023

Documents filed119

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 119 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Form 1File: Sai Mystique Q4 Form 1.pdf2 May 2026
Form 2File: Q4 FORM 2 -ENGINEERS CERTIFICATE - SAI SHREE DEVELOPERS_0001_page-0001.pdf2 May 2026
Form 3File: FORM 3.pdf2 May 2026
Disclosure of Sold and Booked InventoryFile: SOLD UNSOLD.pdf2 May 2026
Form 1File: Sai Mystique Bldg L Form 1 Q3 25-26.pdf21 Jan 2026
Form 2File: Sai Mystique Bldg L Form 2 Q3 25-26.pdf21 Jan 2026
Form 3File: Sai Mystique Bldg L Form 3 Q3 25-26.pdf21 Jan 2026
Disclosure of Sold and Booked InventoryFile: SAI MYSTIQUE L BUILDING RERA DISCLOSUE.pdf21 Jan 2026
Form 5 (FY 2024-2025)File: Form 5 - Sai Shree Developers.pdf13 Nov 2025
Form 1File: F1.pdf17 Oct 2025
Form 2File: F2.pdf17 Oct 2025
Form 3File: F3.pdf17 Oct 2025
Disclosure of Sold and Booked InventoryFile: SOLD.pdf17 Oct 2025
Form 1File: Sai Mystique Bldg L Form 1 Q1.pdf8 Aug 2025
Form 2File: engg.pdf8 Aug 2025
Form 3File: ca.pdf8 Aug 2025
Disclosure of Sold and Booked InventoryFile: sold unsold.pdf8 Aug 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Sai Mystique Bldg L Form 3 Q4.pdf3 May 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Sai Mystique Bldg L Form 2 Q4.pdf3 May 2025
Status of Formation of Legal Entity (Society/Co Op etc.)File: Declaration about conveyance deed Bldg L Sai Mystique.pdf3 May 2025
Disclosure of sold/ booked inventoryFile: SM L BUILDING RERA DISCLOSUE.pdf3 May 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Sai Mystique Bldg L Form 2A Q4.pdf3 May 2025
Status of ConveyanceFile: Declaration for conveyance L build.pdf21 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 15 Architect’s Certificate of Percentage of Completion of Work (Form 1)-1.pdf16 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA.pdf13 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ENGG.pdf13 Jan 2025
Disclosure of sold/ booked inventoryFile: SOLD UNSOLD.pdf13 Jan 2025
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Form 5 Sai Shree L building 23 24.pdf13 Nov 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA.pdf19 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ENG.pdf19 Oct 2024
Disclosure of sold/ booked inventoryFile: SOLD UNSOLD.pdf19 Oct 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: FORM 2A.pdf19 Oct 2024
Disclosure of sold/ booked inventoryFile: sold unsold.pdf17 Jul 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: form 3.pdf17 Jul 2024
Other - LegalFile: LEGAL.pdf17 Jul 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1.pdf13 Jul 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2.pdf13 Jul 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: FORM 2A.pdf13 Jul 2024
Disclosure of sold/ booked inventoryFile: SOLD UNSOLD INVENTORY SM L BUILDING.pdf20 Apr 2024
Disclosure of sold/ booked inventoryFile: SAI MYSTIQUE L BUILDING.pdf11 Apr 2024
Status of ConveyanceFile: Declaration Sai MystiqueL Build.pdf10 Apr 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ARCH CERT FORM 1 SM L BLDG Q4 RERA 2023 24 31 03 2024.pdf9 Apr 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Q4 RERA ENGG CERT FORM 2 SM L BLDG 31 03 2024.pdf9 Apr 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Q4 RERA QUALITY CERT FORM 2A SM L BLDG BLDG 31 03 2024.pdf9 Apr 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA CERT FORM 3 SM L BLDG 31 03 2024 Q4 2023 2024.pdf9 Apr 2024
CERSAI detailsFile: CERSAI.pdf23 Mar 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA CERTIFICATE - SM L BLDG FORM 3 31122022 (1).pdf23 Mar 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: discloser of intrest.pdf23 Mar 2024
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: SEPRATE BANK ACCOUNT DETAILES.pdf23 Mar 2024
Deviation Report with respect to model copy of AgreementFile: DEVITION REPORT WITH RESPECTED TO MODAL COPY OF AGRREMENT.pdf23 Mar 2024
Disclosure of sold/ booked inventoryFile: SM L BLDG SOLD UNSOLD DATA 31122023 RERA Q3.pdf15 Mar 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: SM L BLDG FORM 3 RERA Q3 2023-24 FORM 3_page-0001.pdf15 Mar 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: SAI SHREE FORM 5-22-23_page-0001.pdf11 Mar 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1_31032022_SM L Bldg arch cert.pdf4 Mar 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1_30062022_SM L Bldg arch cert.pdf4 Mar 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form-1-27122022.pdf4 Mar 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: form 1-30092023.pdf4 Mar 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2-31032022.pdf4 Mar 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engg cert SM L Bldg 30-06-2022.pdf4 Mar 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 31-03-23.pdf4 Mar 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA CERT FORM 3 SM L BLDG 30062022_compressed.pdf4 Mar 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA CERT FORM 3 SM L BLDG 30092022_compressed.pdf4 Mar 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA CERT SM L BLDG 30092023 - RERA_compressed.pdf4 Mar 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: SAI SHREE FORM 5-22-23.pdf4 Mar 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: Form 5 SM L BLDG (01042021 TO 31032022).pdf4 Mar 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: SM L BLDG FORM 3 RERA Q3 2023-24.pdf9 Feb 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Q3 RERA 2023-24 FORM - 1.pdf5 Jan 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Q3 RERA 2023-24 FORM - 2.pdf5 Jan 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Q3 RERA 2023-24 FORM - 2A.pdf5 Jan 2024
Declaration in FORM BFile: output.pdf1 Jan 2024
Disclosure of sold/ booked inventoryFile: Disclosure of sold unsold booked inventory.pdf1 Jan 2024
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: OC from PMC for Bldg L.pdf14 Dec 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ARCH CERTIFICATE.pdf7 Oct 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ENGG CERTIFICATE.pdf7 Oct 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Q2 - 2023 QUALITY CERTIFICATE - SM L BUILDING.pdf7 Oct 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: SM L BLDG ARCHITECT CERTIFICATE.pdf16 Jul 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: SM L BLDG ENGG CERTIFICATE.pdf16 Jul 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: SM L BLDG QUALITY CERTIFICATE.pdf16 Jul 2023
Status of Formation of Legal Entity (Society/Co Op etc.)File: Society formation certificate.pdf9 Jul 2023
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: Architect Certificate on application inwarded to PMC for OC.pdf29 Jun 2023

Promoter's earlier projects1

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

1 delivered on promise
ProjectLocationFlatsStatusPromisedDelivered
Sai MystiqueS No 11 Behind Ashok Leyland & Podar International school Opp RIBM College Ambegaon BK. Pune328CompletedJun 2017Jun 2017

How this compares with Pune

95%of this project is bookeddistrict median 31%
26%of Pune projects moved their completion datethis one moved by 42 months
26%of Pune registrations have lapsed or been cancelledthis one is on the register

Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.

Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep Sai Mystique Phase III Building L on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Ambegaon BK13,700+ in Pune

Builder: Sai Shree Developers

Sai Shree Developers has 1 registration on MahaRERA, including Sai Mystique Phase III Building L. Its filings disclose 1 earlier MahaRERA project: declares 1 of 1 past projects completed on time. Read the full track record. See more projects on the Pune district page.

Frequently asked questions

What are my rights if Sai Mystique Phase III Building L is delayed beyond 31 Dec 2026?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Sai Mystique Phase III Building L?

The registered promoter entity is Sai Shree Developers, an others as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Sai Mystique Phase III Building L?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for Sai Mystique Phase III Building L?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Sai Mystique Phase III Building L?

The professionals named in the filing: Architect: Avinash Nawathe Architects; Engineer: DNYANESHWAR MARUTI AWHALE; Engineer: Mahesh Kulkarni; Chartered Accountant: Vinod N Nikam & Co; Chartered Accountant: PRAVIN B BHANDARI; Chartered Accountant: PRADEEP B MORE. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Sai Mystique Phase III Building L?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Sai Mystique Phase III Building L. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Sai Mystique Phase III Building L to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.